GovChime
Notice ID: 09fbe799721043df8de95f49437047ecSolicitation

Joint Base San Antonio Non-Complex Construction (NC2) Indefinite Delivery Indefinite Quantity (IDIQ)

Archived on December 31, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
April 22, 2020
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA3016 502 CONS CL
Place of performance
San Antonio, TX
PSC
Z2JZ: REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Last updated
Dec 4, 2025

Identifiers

Solicitation number
FA301620R0015
Notice ID
09fbe799721043df8de95f49437047ec

Description

Request for Proposal FA301620R0015 This requirement is for a Non-Complex Construction (NC2) Multiple Award Indefinite Delivery, Indefinite Quantity (IDIQ) contract for military facilities at Joint Base San Antonio (JBSA), Texas, including Lackland, Ft. Sam Houston, Randolph, Camp Bullis, Canyon Lake, Seguin Auxiliary Field, Medina Annex (Chapman Annex), Port Annex, Kelly Field Annex, Medical Center Annex and Grayson Street Annex. Task Orders (TO) will be in support of real property maintenance, repair, alteration, and minor construction across all of Joint Base San Antonio. Amendment 1: The Purpose of This Amendment Is: 1. Extend the proposal submission date FROM: 2:00 PM CST 17 April 2020 TO: 2:00 PM CST 1 May 2020. 2. Reschedule preproposal conference date FROM: 0930-1000 CST 31 March 2020 TO: 0930-1000 CST 14 April 2020. 3. Reschedule the site visit FROM: 1000-1100 CST 31 March 2020 TO: 1000-1100 CST 14 April 2020. 4. Extend the base pass submission date FROM: 23 March 2020 at 2:00 PM CST TO: 7 April 2020 at 2:00 PM CST. 5. Incorporate revised Section L, dated 21 March 2020. See paragraph 1.6 for revised information. Amendment 2: The Purpose of This Amendment Is: 1. Change the means of holding the preproposal conference. The preproposal conference will be held electronically only. 2. Change the site visit date and method FROM: Physical attendance on 14 Apr 2020 from 1000-1100 CST TO: A virtual site visit will be held. An unlisted YouTube hyperlink (must use hyperlink to access video in YouTube) with access to the virtual site visit footage will be accessible on 2 April 2020 and will be made available in beta.sam.gov. 3. Incorporate revised Sections L and M, dated 31 March 2020. See Sections 1.6, 1.8 and 3.1.1 in Section L (Attachment 11). See Section 3.3, Step 7 in Section M (Attachment 12). YouTube Hyperlink Accessible 2 April 2020 https://youtu.be/U-kUoJVG4ZU Attach all seed project virtual site visit and preproposal conference questions and answers. Amendment 3: The purpose of this amendment is to: Incorporate revised Attachment 1 NC2 IDIQ Base Contract Specifications 20200416, Attachment 13 NC2 IDIQ Seed Project Specifications 20200416, Attachment 14 NC2 IDIQ Seed Project Submittal Register 20200416, and word copy of Attachment 17 Past Performance Information Sheet (PPI). The following attachments have been incorporated: Attachment 22: B2792 Site Pictures - Building Facing East Attachment 23: B2792 Site Pictures - Building Facing North Attachment 24: B2792 Site Pictures - Building Facing South Attachment 25: B2792 Site Pictures - Building Facing West Attachment 26: Historical As Built - B2792 Attachment 27: NC2 IDIQ Project - B2792 Dimension Drawing Attach all seed project virtual site visit and preproposal conference questions and answers with clarifications. See Questions 11, 12, 14, 33, 45, 81, 82, 98, 111, 113, 116, and 122 for government response clarifications. Amendment 4: The purpose of this amendment is to: 1. Extend the proposal submission date from 1 May 2020 at 2:00 PM CST to 4 May 2020 at 2:00 PM CST.

Full description on SAM.gov

Award Overview

Contacts

Documents

No documents available.

Lifecycle

Solicitation:FA301620R0015
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationFeb 5, 2020

    Joint Base San Antonio Non-Complex Construction (NC2) Indefinite Delivery Indefinite Quantity (IDIQ)

    Notice ab3140e15e674b65a504c27e28d9904d on SAM.gov

  2. 7×
    SolicitationCurrentMar 17, 2020

    Joint Base San Antonio Non-Complex Construction (NC2) Indefinite Delivery Indefinite Quantity (IDIQ)

    Notice 09fbe799721043df8de95f49437047ec on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA301620R0015

Archive Date

Dec 31, 2020

Office Address

JBSA LACKLAND, TX, 78236-5286