Furnish and Install Brand Name Rite Heating Boiler, Model #450 WG � JBSA Lackland
Archived on September 26, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM CDT
- Posted
- September 9, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA3016 502 CONS CL
- Place of performance
- JBSA Lackland, 78236
- Last updated
- Nov 8, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA301625Q0216
- Notice ID
- 36fa57e4c4f744edb98317fd4d885c3f
Description
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
Amend 0003 -- Clarification on Question 7 and 20.pdf
83 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
Question and Anwers_RFQ FA301625Q0216.pdf
249 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Site Visit_ Attendance Sheet.pdf
832 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
RFQ Cover Page Amendment 0001.pdf
246 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Sources Sought Notice - Removal and Install of Heating Boiler.docx
91 KBAdded in Sources Sought version 5Posted - Download
Solicitation - FA301625Q0216.pdf
2.2 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
SOW MPLS B10504 LAK BOILER WT - 14 Aug 2025 -Draft.pdf
623 KBAdded in Sources Sought version 5Posted - Download
SOW MPLS B10504 LAK BOILER WT - 21 Aug 2025 Final.pdf
600 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
SSJ Brand Name Boiler B10504 -- Lackland AFB - Redact.pdf
410 KBAdded in Combined Synopsis/Solicitation version 2Posted
Lifecycle
- 4Version 4Sources SoughtArchived
Remove and Replace Heating Boiler Manufacture Brand Name: Rite, MFG part No. 450 WG - Updated Sources Sought due to requirement change
- 2Version 2Combined Synopsis/SolicitationArchived
Type changed from Sources Sought to Combined Synopsis/Solicitation
Furnish and Install Brand Name Rite Heating Boiler, Model #450 WG – JBSA Lackland
- 3Version 3Combined Synopsis/SolicitationArchived
Furnish and Install Brand Name Rite Heating Boiler, Model #450 WG – JBSA Lackland
- 5Version 5Combined Synopsis/SolicitationArchived
Furnish and Install Brand Name Rite Heating Boiler, Model #450 WG – JBSA Lackland
- 8Version 8Combined Synopsis/SolicitationArchivedCurrent
Furnish and Install Brand Name Rite Heating Boiler, Model #450 WG – JBSA Lackland
- 10Version 10Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
Furnish and Install Brand Name Rite Heating Boiler, Model #450 WG – JBSA Lackland
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning. | 63% | Combined Synopsis | 11/13/2026 |
Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system. | 49% | Combined Synopsis | 11/12/2026 |
This requirement was awarded on an unusual and compelling basis. Please refer to attached Justification and Approval for additional details. | 49% | Awarded | Open |
Install Chill Water System Filtration & Steam Condensate | 42% | Awarded | Open |
Provide HVAC vent cleaning and related building component replacement services for multiple buildings at Hanscom Air Force Base. The requirement includes cleaning HVAC supply diffusers, replacing 2x2 HVAC return grills, and replacing adjacent 2x2 ceiling tiles in accordance with the quantities and building inventory identified in the Statement of Work. The contractor shall provide all labor, materials, tools, equipment, transportation, supervision, quality control, and project administration necessary to complete the work. | 42% | Market Research | 11/06/2026 |
Additional Details
Solicitation Number
FA301625Q0216
Archive Date
Sep 26, 2025