60 MXS, Fabrication Flight Parts Manufacturing
Archived on July 30, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM PDT
- Posted
- July 1, 2026
- Notice type
- Sources Sought
- NAICS
- 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR MOBILITY COMMAND.FA4427 60 CONS LGC
- Place of performance
- LINDA, California, 94535
- PSC
- 9515: PLATE, SHEET, STRIP, FOIL, AND LEAF
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA442726QZ055
- Notice ID
- e5e947faa92b4488bcb1c9897f22a35f
Description
This is a Sources Sought notice for the requirements below for Market Research purposes. Please note this is not a request for quotes.
60 MXS, Fabrication Flight, is looking to expand their manufacturing capability:
These post-processing requirements are our primary manufacturing bottlenecks; while we can machine the parts, our lack of required infrastructure prevents us from meeting blueprint specifications and causes the rejection of -107 and -202 engineering requests.
Below are the required capabilities tied to their governing specifications.
1. Anodize & Dichromate Sealing (Immediate Test Case)
- Requirement: MIL-A-8625 Type II (Class I) & Type III (Class I & II)
2. Automated Shot Peening
- Requirement: ASTM 2430, Lockheed STP51-501, Boeing SOPM 20-10-03
- Limitation: Requires automated intensity-control and media-sorting equipment. Manual roto-peening is structurally impractical for large surface areas.
3. Thermal Spray Coatings (Tungsten Carbide – Cobalt)
- Requirement: BMS10-67 Type I via Boeing BAC5851 Class 1 (Plasma) or Class 2 (HVOF)
- Limitation: Travis AFB lacks the high-velocity oxygen fuel / plasma thermal equipment and specialized environmental spray booths required for this application
4. Pre-Penetrant Alkaline Acid Etch
- Requirement: Lockheed STP53-201 / Boeing SOPM 20-20-02 (Sodium Hydroxide or Flicks etch)
- Limitation: Critical post-machining process to remove 0.0002” – 0.0004” of smeared metal to allow for accurate NDI crack detection
Goal: To establish a possible Blanket Purchase Agreements (BPAs) for these four distinct processes.
If your company is capable of fulfilling the required effort, notify the POC.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
60 MXS, Fabrication Flight Parts Manufacturing
Similar Opportunities
Additional Details
Solicitation Number
FA442726QZ055
Archive Date
Jul 30, 2026
Office Address
TRAVIS AFB, CA, 94535-2632