Notice ID: 0dc758f8230d4c4e95a4d822f7fe94c3Solicitation
Laptop Storage Cabinets and BNO Cisco and Juniper Switches
Archived on August 21, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−05:00
- Posted
- August 5, 2024
- Notice type
- Solicitation
- Set-aside
- SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- NAICS
- 334112: Computer Storage Device Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA4452 763 ESS
- Last updated
- Sep 9, 2025
Identifiers
- Solicitation number
- FA445224Q0015
- Notice ID
- 0dc758f8230d4c4e95a4d822f7fe94c3
Description
Update: We are asking for delivery to be on or before 30 September 2024 but no later than 90 days after receipt of order (ARO). You do not have to make a statement saying that delivery will be 30 September or before, but please include a delivery estimate for each item. 1. INTRODUCTION: This is a combined Synopsis/Solicitation RFQ in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 12.6, and FAR Part 13.5 Simplified Acquisition Procedures (SAP) for Certain Commercial Products and Commercial Services, and as supplemented with additional information included within this notice. Headquarters (HQ) Air Mobility Command (AMC) requires (28 qty) 20 Laptop Security Cabinet Drawers, (2 qty) 10 Laptop Security Cabinet Drawers, (1 qty) 5 Laptop Security Cabinet Drawers, (22 qty) Cisco C9300-24P Switches, and (3 qty) Juniper EX3400-24P Switches. 2. DISCLAIMER: This RFQ is not authorization to begin delivery, and in no way obligates the Government for any costs incurred by the schedule contractor associated with developing a quotation. The Government reserves the right not to award a contract in response to this RFQ. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established. The Government reserves the right not to award a Purchase Order (PO) in response to this RFQ. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established. 3. REQUIREMENT: There are seven attachments to this RFQ: Attachment 1- Laptop Security 20 Cabinets Salient Characteristics, Attachment 2 - Laptop Security 10 Cabinets Salient Characteristics, Attachment 3 - Laptop Security 5 Cabinets Salient Characteristics, Attachment 4 - Quantities and Locations, Attachment 5 - Solicitation FA445224Q0015, Attachment 6 - RFQ Information Sheet, Attachment 7 - Brand Name Only Justification Redacted. A response to this request shall consist of completion of Attachment 6 (or a submitted quotation in contractor format as long as it, at a minimum, depicts unit and extended price (rounded to the nearest dollar), applicable specifications, and delivery periods). All products must be delivered prior to 30 September 2024. The quotation must include a statement that delivery of required products will be on or before 30 September 2024. 4. BASIS OF AWARD: Award will be made IAW FAR 13 procedures and the procedures specified in this RFQ, and on the basis of the lowest total aggregate price quotation that is technically acceptable. The Government intends to award a Firm Fixed Price (FFP) PO to the offeror who is deemed responsible IAW FAR 9.1, as supplemented, and whose quotation conforms to the RFQs requirements and is judged to represent the technically acceptable quotation with the lowest complete and reasonable price. First, the Government will rank the quotations which conform to the RFQs requirements from lowest price to highest price. Next, the Government will evaluate the lowest price offeror for technical acceptability as follows: Technically acceptable quotation meets all the requirements, as outlined in Attachments 1 through 4. Technically unacceptable quotation does not meet all the requirements, as outlined in Attachments 1 through 4. If the quotation with the lowest price is determined technically acceptable, the Government will evaluate the offers total aggregate price for price completeness and reasonableness , as defined below. If the lowest priced quotation is technically acceptable and the price is complete, reasonable, and balanced, then this offerors quotation represents the best value to the Government and award will be made to that offeror. If the lowest priced quotation is not technically acceptable, the Government will consider the correction potential and may enter into interchanges with that offeror. If, after interchanges with that offeror, their quotation is technically acceptable and remains the lowest price, the PO will be issued to that offeror. If the Government deems the quotation not easily correctable, or if at any time it becomes other than the lowest priced quotation, the next lowest priced quotation will be evaluated for technically acceptability, followed by an analysis of their price to verify reasonableness, completeness, and balance. Interchanges will take place as necessary or deemed appropriate by the Government. This evaluation process will be repeated until reaching a technically acceptable quotation, or until all quotations are evaluated. In order to determine price fair and reasonable, the evaluation process may continue until reaching two technically acceptable quotations (to establish price competition). Applicable definitions are outlined below: Completeness The quotation will be reviewed to determine the extent to which all the price elements have been addressed. The review will determine the adequacy of the offerors quotation in addressing and fulfilling the RFQ requirements. Reasonableness For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. The Government will determine prices fair and reasonable through adequate price competition outlined in FAR 15.404-1(b)(2)(i). 5. The Government intends to make award based on the initial quotation submissions without conducting interchanges. Therefore, each quotation should contain the Offerors best terms from a price and technical standpoint. However, the Government reserves the right to hold interchanges if, during the evaluation, it is determined to be in the best interest of the Government. Interchanges are fluid interaction(s) between the Contracting Officer (CO) and the offerors that may address any aspect of the quotation and may or may not be documented in real time. However, the Government reserves the right to conduct interchanges using Interchange Notices (IN). Responses to INs will be considered in making the award selection decision. Interchanges may be conducted with one, some, or all offerors. The Government is not required to conduct interchanges with any or all offerors responding to this RFQ. 6. Quotations shall be submitted by email to angela.port@us.af.mil and hunter.ottensmeier@us.af.mil no later than 06 August 2024 at 12:00 PM Central Daylight Savings Time. Any quotations received after the RFQ closing date and time may be considered late and may not be considered.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
FA445224Q0015- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentJul 26, 2024
Laptop Storage Cabinets and BNO Cisco and Juniper Switches
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This requirement is 100 Small Business Set-aside Brand Name Dell Hard Drive products No substitutions. See attached PDF RFQ for detail summary. | - | Combined Synopsis | 09/18/2026 |
Item Name: TEST DEVICE,INTERFACE NSN: 7035016126074 Part Number: BI-411-00 Basic Quantity: 3 (100% options) End Item: Abrams Response Date: August 31 2026 Requirements Description: The proposed action is to acquire TEST DEVICE,INTERFACE from TERADYNE INC (CAGE Code: 23350). | - | Market Research | 09/30/2026 |
Item Name: COMMON ETHERNET SWITCH CONTAINER NSN: 7025016747196 Part Number: 57K7316 Basic Quantity: 1,782 (No options) End Item: Abrams M1A2 SEPv3. | - | Market Research | 05/13/2026 |
9 EA of NSN 7025-01-616-5061 Transfer Unit | - | Solicitation | 03/09/2026 |
The 375th Contracting Squadron is performing Market Research to identify potential SBA-certified Women-Owned Small Businesses (WOSB) under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) with the qualifications, licenses, and technical capabilities to perform electrical conduit repair, drop tube replacement, and overfill alarm installation across designated fueling facilities at Scott Air Force Base, IL. Please contact MSgt Nolan Strange, nolan.strange.1@us.af.mil or Mr. Jody Noram, jody.noram.1@us.af.mil if you have any questions or concerns. DISCLAIMER: This Sources Sought is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), nor does it guarantee a future solicitation will be issued. The Government will not reimburse respondents for any costs associated with preparing or submitting information in response to this notice. 3. Capability Statement Submittal Requirements Interested vendors possessing the required expertise, equipment, and certified personnel are invited to submit a Capabilities Statement (maximum 5 pages) addressing the following: Company Information: Company name, address, SAM Unique Entity Identifier (UEI), CAGE Code, Point of Contact (name, email, phone), and Socioeconomic status (e.g., 8(a), SDVOSB, WOSB, HUBZone, Small Business). Technical Capabilities & Experience: Summary of relevant past performance completed within the last three (3) years on underground storage tank (UST) fueling systems, conduit breakout/pour-back, overfill drop tube replacements, and Veeder-Root or automatic tank gauge (ATG) sensor/alarm installations. Licensing & Certifications: Confirmation that personnel hold required state/local UST service technician certifications, Veeder-Root certified installer/technician credentials, and applicable electrical licensing. Rough Order of Magnitude (ROM): Optional feedback on typical lead times, mobilization timeframes, and commercial pricing structure for tasks of this nature. PART 2: STATEMENT OF WORK (SOW) 1.0 Objective & Overview The Contractor shall furnish all necessary labor, supervision, materials, tools, equipment, testing apparatus, and transportation (except for specified Government/Owner-Furnished Equipment) to perform concrete breakout and conduit correction, electrical re-wiring, drop tube replacement, and overfill alarm installation across designated fueling facilities. 2.0 Detailed Scope of Work by Facility and Task TASK AREA 1: Premium Tank Sump Conduit Repair & Electrical Remediation The Contractor shall repair incorrectly poured conduit serving the Premium tank sump, complete necessary electrical re-pulls, and restore the concrete pad to original structural grade. Demolition & Concrete Breakout: Precision sawcut and breakout existing concrete around the Premium tank sump to expose the buried conduit line. Protect adjacent sump structures, lid seats, and underground utilities from collateral damage during breakout operations. Conduit Clearing & Realignment: Cut apart the obstructed/incorrect conduit run and clear out concrete or foreign debris resulting from the prior incorrect pour. Reconnect the conduit run using code-compliant, liquid-tight, fuel-resistant fittings and conduit rated for Class I, Division 1/2 hazardous fuel environments. Ensure proper pitch, sealing, and alignment. Electrical Wiring & Terminations: Pull new electrical conductors/wiring from the main building panel/control area to the tank sub-unit junction box in accordance with the National Electrical Code (NEC/NFPA 70). Terminate all wiring connections, verify seal-offs, and conduct comprehensive continuity, insulation resistance (megger), and operational tests to ensure proper equipment operation. Civil Restoration: Backfill excavated trench using suitable aggregate, compacted in uniform lifts to match surrounding base compaction specifications. Form and pour back high-early-strength concrete to match the existing grade, thickness, and finish of the fueling apron. TASK AREA 2: Facility 6047806 – Tank 3 Drop Tube Replacement The Contractor shall remove obsolete fill hardware and install a compliant drop tube assembly on Tank 3. Hardware Removal & Disposal: Remove the existing fill adapter, fill cap, and drop tube assembly. Safely load, manifest (if required), transport, and legally dispose of all obsolete components off-site in compliance with all local, state, and federal environmental regulations. Furnish & Install New Hardware: Furnish and install one (1) new OPW overfill prevention drop tube (or Government-approved equal), one (1) new fill adapter, and one (1) new heavy-duty locking cap. Special Technical Condition: Work assumes the existing drop tube is removable without structural failure and the existing spill container (spill bucket) remains sound and reusable. If the drop tube is seized or the spill bucket is found to be compromised/damaged, the Contractor shall immediately notify the Contracting Officer Representative (COR). Any required replacement of seized components or spill containers shall be evaluated and authorized via a formal bilateral change order prior to proceeding. Regulatory Compliance Verification: Set and verify that the drop tube shutoff mechanism operates at the exact level mandated by 40 CFR Part 280 / state UST regulations (e.g., 95% tank capacity shutoff or 90% flow restriction). Deliverables & Documentation: Document pre-work conditions, intermediate installation stages, and final configuration with high-resolution digital photographs. Submit photos and completed compliance checklist with the final job completion paperwork. TASK AREA 3: Facility 6047801 – Overfill Alarm Installation The Contractor shall remove the existing overfill alarm and install owner-provided Veeder-Root monitoring hardware. Demolition: Disconnect and remove the existing overfill alarm unit; transport and dispose of all removed scrap components off-site. Installation of Government/Owner-Furnished Equipment (GFE/OFE): The Government/Owner will provide: One (1) Veeder-Root Overfill Alarm (Part # 790091-001 / SKU: 790091-001) One (1) Veeder-Root Universal Sensor Mounting Kit (Part # 330020-012 / SKU: 330020-012) The Contractor shall furnish all certified labor, wiring, hardware, seals, and incidental consumables to properly mount, wire, and integrate the alarm with the existing automatic tank gauge (ATG) system. Testing & Commissioning: Perform functional operational checkout of the Veeder-Root alarm and sensor assembly to verify positive alarm annunciation and correct signal communication to the console. Deliverables & Documentation: Take detailed digital photographs of the completed installation, wiring junction, and console status screen indicating an operational, alarm-free condition. Submit completion paperwork and test verification logs to the COR. 3.0 Site Cleanup, Waste Management & Housekeeping Debris Haul-Off: The Contractor shall continuously maintain a clean and safe work zone. Upon completion of each task, the Contractor shall collect, load, haul off, and legally dispose of all concrete rubble, excavated soils, cut conduit, old wiring, discarded drop tubes, and packaging debris. Hazardous Materials: Any fuel-wetted materials or petroleum rags generated during servicing shall be managed and disposed of in accordance with applicable RCRA and local environmental standards. 4.0 Submittals and Deliverables Deliverable Site Safety Plan & AHAs Activity Hazard Analysis for sawcutting, confined spaces, and hazardous fuel zones Technician Certifications Veeder-Root certified technician & state UST licenses With quote / proposal submittal Drop Tube Compliance Verification Documented drop tube shutoff height calculation and verification sheet Photo Documentation Package Clear digital photos showing before, during, and after conditions for all tasks Disposal Manifests/Receipts Proof of lawful disposal for concrete and metallic/fuel-wetted scrap 5.0 Safety, Code Compliance & Working Conditions Safety Regulations: All work shall comply with OSHA 29 CFR 1910 and 1926 standards, NFPA 30 (Flammable and Combustible Liquids Code), NFPA 30A (Motor Fuel Dispensing Facilities), and NFPA 70 (National Electrical Code). Hot Work & Hazardous Locations: Sump areas represent Class I, Division 1/2 environments. The Contractor shall implement atmospheric monitoring (LEL meters) and obtain all required hot work permits before operating saws, cutting tools, or electrical equipment near open sumps. | - | Market Research | 10/30/2026 |
Additional Details
Solicitation Number
FA445224Q0015
Archive Date
Aug 21, 2024
Office Address
SCOTT AFB, IL, 62225-5020