GovChime
Notice ID: 2e64099eef2040ff861c043202719737Combined Synopsis/SolicitationArchived

B518 Power Plant Maintenance

Archived on March 27, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM CDT
Posted
March 9, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
561210: Facilities Support Services
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR COMBAT COMMAND.FA4600 55 CONS PKP
Place of performance
St Columbans, Nebraska, 68113
PSC
J036: MAINT/REPAIR/REBUILD OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA460026Q0013
Notice ID
2e64099eef2040ff861c043202719737

Description

Amendment 0003: The purpose of this amendment is to remove the previous CLIN XX02 as it was duplicated in error. The updated CLIN structure can be found in the attached document titled "Combined Synopsis.Solicitation - FA460026Q0013 - Updated 3.9.26". 

Amendment 0002: The purpose of this amendment is to add the answered technical questions that were recieved. Adding attachments 20-25 in support of the answered technical questions. An updated PWS will be added with changes due to the technical questions. Offer due date has been extended to Thursday 12 March at 11:00AM CST. An updated Combo will be atttached reflecting this information as well.

Amendment 0001: The purpose of this amendment is to add an unlocked version of the Combined Synopsis/Solicitation. Please view the Attachments/Links to find the doccument.

DESCRIPTION OF REQUIREMENT

This requirement is for operation and maintenance of electric generating plant electrical systems
at Bldg 518 on Offutt AFB. The contractor shall operate, maintain, install, refuel, and repair
energized and de-energized facility and power distribution components for electric circuits,
electric control systems, and associated equipment IAW the attached Performance Work
Statement.

APPLICABLE LABOR LAWS

This solicitation is subject to the Service Contract Labor Standards FAR 52.222-41 and the
current wage determination, Service Contract Act WD # 2015-5005, revision 27, revised 03 Dec
2025.

QUESTIONS DUE DATE AND TIME

A site visit will be scheduled for 18th February 2026 at 09:00 AM CST. All prospective offerers
that do not have access to Offutt AFB shall submit a filled out EAL request to A1C Hunter Hendrix at hunter.hendrix.1@us.af.mil no later than COB 16th February 2026 . Entry to the installation cannot be guaranteed.

OFFER DUE DATE AND TIME

Monday, 09 March 2026 at 11:00 AM CST.

CONTRACTING OFFICE CONTACT INFORMATION

All offers and questions pertaining to this solicitation shall be sent by email to:
A1C Hunter Hendrix at hunter.hendrix.1@us.af.mil
Mr. Casey L Hupton at casey.hupton.1@us.af.mil

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (27)

  • Combined Synopsis.Solicitation - FA460026Q0013 - Updated 3.9.26.pdf

    849 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Technical Questions B518 and Answers.pdf

    2.7 MBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment 1_PWS B518 Power Generator Plant_3.5.26.pdf

    284 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 2 - dd1423_DL001_SOP - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 3 - dd1423_DL002_EPMI - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 4 - dd1423_DL003_Weekly EPMI - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 5 - dd1423_DL004_Monthly APIMS - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 6 - dd1423_DL005_Calibration - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 7 - dd1423_DL006_Outage reporting - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 8 - dd1423_DL007_Employee Roster - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 20 - Appendix A - AF Form 487 Generator Inspection Form - 3-4-26.pdf

    1.4 MBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 9 - dd1423_DL008_Fuel Tank Consumption - 2_2_26 .pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 10 - dd1423_DL009_Fuel Tank Repairs - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 11 - dd1423_DL010_Fuel Tank Spills - 2_2_26 .pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 21 - Appendix B - 55 CES ELECTRIC POWER OUTAGE REPORT - 3-4-26.pdf

    923 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 12- dd1423_DL011_STAR Monthly log - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 13 - dd1423_DL012_QCP - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 22- Appendix C - Corrective Action Report - 3-4-26.pdf

    676 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 14 - dd1423_DL013_Mobilization - 2_2_26 .pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 15 - dd1423_DL014_Labor Reporting - 2_2_26 .pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 23 - Appendix D - Customer Complaint Record - 3-4-26.pdf

    1.0 MBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 16- dd1423_DL015_Mission Essential - 2_2_26.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 17 - dd1423_DL016_Closeout Plan - 2_2_26 .pdf

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 24 - Appendix E - 20250605 - Env Spec Conditions - Division 1-01 57 19-1C _3 Rev2- 3-4-26.pdf

    1.8 MBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 18 - WD 2015-5005 V.27, - 03-12-2025 (1).pdf

    366 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 25 - Appendix F - 20240808 - v2 CEO Tank Compliance Docs and Long Regs - 3-4-26.pdf

    402 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 19 - EAL 1-55 SFS Form 31-Base Entry Authorization List - 11 Feb 2025.docx

    2.7 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    B518 Power Plant Maintenance

    Notice 428ecc06176841d1bda20b4a5b08c879 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    B518 Power Plant Maintenance

    Notice 0af5eb179630478cb56966f4852096ba on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    B518 Power Plant Maintenance

    Notice c513c8fe9c1840e39269ad07ee028c93 on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    B518 Power Plant Maintenance

    Notice c6b584ceccfc484b9f963e428fdbf9af on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationArchived

    B518 Power Plant Maintenance

    Notice b714a6c3541c494c94f678db4808b706 on SAM.gov

  6. 7
    Version 7Combined Synopsis/SolicitationArchivedCurrent

    B518 Power Plant Maintenance

    Notice 2e64099eef2040ff861c043202719737 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA460026Q0013

Archive Date

Mar 27, 2026

Office Address

OFFUTT AFB, NE, 68113