Notice ID: 698a41fbb2f1d11ab3b62e95806130a5Award NoticeAwarded
Replace Steam System Breakers DFAC, Bldg. 13330
Awarded on September 24, 2019. Full description on SAM.gov.
Awarded tounder FA461019CA039 (source: SAM.gov award notice)• $343.4K
Overview
- Posted
- September 26, 2019
- Notice type
- Award Notice
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of War
Notice details
- Place of performance
- Vandenberg AFB, CA, 93437-5212
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 4, 2025
- Award date
- Sep 24, 2019
- Award amount (SAM.gov award notice)
- $343.4K
Identifiers
- Solicitation number
- FA461019RA029
- Notice ID
- 698a41fbb2f1d11ab3b62e95806130a5
- Award number (PIID)
- FA461019CA039
Description
AMENDMENT 03 The purpose of this amendment is to make the following changes to the solicitation: 1. Upload additional RFI response. 2. Extend the Proposal due date to 6 September 2019. The response time remains at 4:00 PM Pacific. 3. All other terms and conditions remain unchanged. NOTE: Amendment 01 is detailed in the narrative but was not actually posted as Amendment 01. Amendment 02 was erroneously posted as Amend 01. Amendment 01 was intended to extend the RFP closing date by one week. Additonally, Amendment 02 was intended to extend the RFP by an additional week. No other changes were made by these amendments. Please acknowledge all actual FBO Amendments in your proposals. POC: Stella Davis, email: stella.davis@us.af.mil or Duayne Martinez, email: Duayne.martinez@us.af.mil
Award Overview
Award Number
FA461019CA039
Award Amount (SAM.gov award notice)
$343.4K
Award Date
Sep 24, 2019
Awardee
Awardee UEI
CMSRTLXBUAM6
Original Solicitation
Notice ID: 698a41fbb2f1d11ab3b62e95806130a5
Posted Date: Sep 26, 2019
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
FA461019RA029- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 8×Combined SynopsisJul 17, 2019
Replace Steam System Breakers DFAC, Bldg. 13330
- AwardedCurrentSep 26, 2019
Replace Steam System Breakers DFAC, Bldg. 13330
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system. | 72% | Combined Synopsis | 11/12/2026 |
FA8501-27-RAPID-RPR RPL HVAC B301-OTA Under the RAPID Umbrella Framework: UHHZ990029 RAPID RPR RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), BLDG 300 at Robins AFB, GA Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to repair, modernize, and sustain critical HVAC and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia. The requirement includes replacement or modernization of end-of-life HVAC equipment; improvements necessary to provide reliable climate control and energy-efficient operations; and associated interior work to address accessibility barriers, lead-based paint, asbestos-containing flooring, degraded finishes, and workspace configuration. The supporting work is necessary to improve occupant safety, facility reliability, code compliance, and uninterrupted mission operations for Facility 300’s critical multi-tenant organizations. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose The purpose of this Area of Interest is to identify commercially viable, safe, resilient, and schedule-credible solutions to repair and modernize the heating, ventilation, and air-conditioning (HVAC) and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia. The Government seeks an integrated approach that restores reliable environmental control; addresses end-of-life HVAC equipment; and supports remediation or modernization of affected interior conditions, including lead-based paint, asbestos-containing flooring, accessibility barriers, and degraded workspace configurations. The selected approach must sustain uninterrupted operations for Facility 300’s multi-tenant mission partners—including supply-chain management, network support, special operations/rotary-wing management, and C-5 cargo aircraft management—while improving energy performance, occupant safety, accessibility, maintainability, and compliance with applicable safety, energy, and Unified Facilities Criteria (UFC) requirements. Solutions should provide a practical and phased path to execute the work with minimal disruption to occupied operations and with appropriate control of construction, environmental, safety, operational-continuity, and schedule risks. The Government is interested in approaches that leverage commercial practices, innovative delivery methods, and demonstrable capabilities; any use of Other Transaction Authority (OTA) remains subject to confirmation of statutory authority, appropriate use criteria, and contracting/legal review. Project Background and Existing Conditions Facility 300 (constructed in 1942) is a critical multi-tenant facility supporting several key Department of War (DoW) missions, including the 448 SCMG (Supply Chain Management Group), 78 ABW IT (Zone 4/5 network support), LCMC/WIUW (Special Operations/Rotary management), and LCMC/WLS (C-5 cargo aircraft management). Sustainable, modern facility systems are essential to maintain uninterrupted operations for these critical national security and logistics missions. The building systems are severely degraded. The HVAC units have exceeded their lifecycle, resulting in frequent failures, high maintenance costs, and inadequate climate control. Walls have peeling lead-based paint, and degraded flooring under the carpet contains asbestos. The basement east section is currently inaccessible under ADA standards. This project repairs and modernizes Building 300 workspace to prevent safety hazards (slips/falls), optimize interior space configuration, improve occupant morale, and ensure compliance with energy, safety, and UFC codes. The building 300 will remain in partial operation during the entire duration of the project. Project Areas OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Build-Only execution approach under the standalone statutory authority of 10 U.S.C. § 2808a. Because the Government has provided a 100% completed design package and/or specific phasing and repair requirements, this project does not contain a collaborative design-builder phase. Instead, it transitions directly to rapid construction execution under an OTA structure to bypass administrative procurement lag. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 16 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page via email to the designated point of contact listed. Jimmy Ezzell – jimmy.ezzell.1@us.af.mil Amelia Kelly - amelia.kelly@us.af.mil The Solution Brief shall include: A. Cover Page • Company name • UEI • Mailing address • Primary point of contact • Email address and telephone number • Identification of this RAPID AOI B. Executive Summary • Summary of the respondent’s qualifications and anticipated delivery capability; • Identification of any material capability, staffing, access, bonding, or teaming assumptions. C. Past Relevant Construction Experience • Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on large commercial buildings and or Government facilities involving Repair/Replace of HVAC systems • Focus: Historical performance in occupied facilities, managing congested site logistics, working in restricted areas (e.g., flightlines), and adhering to environmental and safety standards. D. Team Composition and Organization • Focus: Adequacy of the proposed organizational structure and the qualifications of Key Personnel (Project Manager, full-time Site Superintendent, Site Safety and Health Officer, and Quality Control Manager). E. Construction Execution and Phasing Approach • Focus: Technical understanding of the 100% Government-furnished design, methodology for physical work execution, utility outage coordination, and the realism of the proposed master schedule. The evaluation will assess the team's ability to provide continuous on-site leadership and effectively coordinate with Government personnel daily. F. Financial Capacity and Bonding • A statement of financial capacity to perform the anticipated work • Current single-project and aggregate bonding capacity, if bonds are anticipated; • Name of surety • Any other information necessary to demonstrate capacity to perform the anticipated project. Evaluation & Selection Criteria The Government will utilize a two-step, Best-Value selection process mapped to the RAPID framework to select the Company. The evaluation process consists of: Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 & 3 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications (SOQ) Evaluation Factors (Phase 1 above) Factor 1: Past Relevant Construction Experience o Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on Government runway/ taxiway projects that entail repair or replacement or new construction o Focus: Historical performance in occupied facilities, managing congested site logistics, working in restricted areas (e.g., flightlines), and adhering to environmental and safety standards. Factor 2: Team Composition and Organization o Focus: Adequacy of the proposed organizational structure and the qualifications of Key Personnel (Project Manager, full-time Site Superintendent, Site Safety and Health Officer, and Quality Control Manager). Factor 3: Construction Execution and Phasing Approach o Focus: Technical understanding of the 100% Government-furnished design, methodology for physical work execution, utility outage coordination, and the realism of the proposed master schedule. The evaluation will assess the team's ability to provide continuous on-site leadership and effectively coordinate with Government personnel daily. Step 2: Pitch Presentation and Price Evaluation (Phase 2/Final Down-Select) The Government will invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Constructability Review and Risk Management (Presentation) Focus: o Capacity to identify potential field conflicts, manage supply chain volatility, and mitigate risk (e.g., unforeseen site conditions, hazardous materials, weather delays) using the provided 100% design and phasing plan. Factor 2: Collaborative Execution and Problem-Solving (Presentation/Q&A) o Focus: Ability to work cooperatively with base stakeholders and the Project Delivery Team to resolve real-time field conflicts, safety incidents, or schedule recovery actions. Factor 3: Financial Capacity and Bonding o Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. o The estimated magnitude of construction associated with this Area of Interest (AOI) is $20M to $40M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement Final Selection and Award (Phase 3) The Government will make a final best-value down-select decision. The Company to be awarded is the company’s whose combined technical qualifications, execution pitch, and price proposal represent the most advantageous offer to the Government. The Government reserves the right to have more than one final down selectee to request proposals if necessary. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: • Invite, not invite, or limit respondents advancing to later phases; • Conduct technical exchanges; • Request clarifications or supplemental information; • Negotiate with one or more respondents; • Modify, suspend, or cancel this Special Notice; • Issue additional notices or requests; and • Make no award. Attachments 1. B300 HVAC Bay A & Headhouse OTA_RUNWAY REPAIR SOO 2. UHHZ990029 Complete set of drawings 3. UHHZ990029 HAZMAT report 4. UHHZ990029 Updated Specifications 5. UHHZ990029 Submittal Register Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization: While the immediate requirement under this AOI is the HVAC at Bay A and the Headhouse at Building 300, offerors are advised that participation and successful evaluation under this AOI may provide significant strategic opportunities beyond the initial project. | 69% | Special Notice | 11/16/2026 |
Admentment 01(27 October 2026): The purpose of this amendment is to: 1. Post the RFI Questions and Answers. 2. Post updated PWS with corrections from questions and answers. 3. Post Site Visit Sign in Roster. 4. Remove Clauses 52.225-1 and 52.225-3. All other terms and conditions remain unchanged. The Contractor shall provide all qualified personnel, transportation, tools, equipment, materials, and services required to install hard-wired refrigerant leak detection systems in 186 dormitory bedrooms within Buildings 750, 751, and 768 at Little Rock Air Force Base (LRAFB), Arkansas. The contractor shall accomplish all services below to meet the requirements in accordance with the attached Performance Work Statement (PWS). Site Visit: A site visit will be held on Friday, 23 October 2026 at 9:00 AM local time. Please meet at the Little Rock AFB Visitors Control Center no later than 8:45 AM to gain base access. RFIs: Questions are due via email to the POCs listed in SAM.gov Monday, 26 October 2026 at 1000 CST. | 69% | Solicitation | 11/02/2026 |
*****Amend 0003 - The purpose of Amend 0003 is to revise the requirement removing temporary cooling and to extend the quote due date to 7 July 2026 at 10:00 AM EDT.***** *****Amend 0002 - The purpose of Amend 0002 is to include Attach 8 - RFIs with Answers and Attach 9 - Attachment to RFI Answers. The quote due date is extended to 24 June 2026 at 10:00 am EDT. ***** *****Amend 0001 - The purpose of Amend 0001 is to incorporate photos from the Site Visit as Attach 7 - Site Visit Photos. ***** The 911th Airlift Wing, Air Reserve Station (ARS) has a project to replace the chiller in Building 418 in Coraopolis, PA. Solicitation FA671226Q0010 is issued as a Request for Quote (RFQ). ***This is the re-release of FA671226Q0003.*** The solicitation document, with the incorporated clauses and provisions, will be issued in accordance with the Federal Acquisition Regulation (FAR) Parts 12 and 36 and will be incorporated in the awarded firm-fixed price contract. Interested vendors should reference the solicitation documents for all terms and conditions. All interested and eligible parties are responsible for monitoring this website to ensure they have the most current information (i.e. Amendments) for the solicitation. No paper solicitation will be available. Procurement is solicitation as a one hundred percent (100%) Small Business set-aside. The solicitation will result in a Firm-Fixed Price (FFP) contract. The North American Industry Classification System (NAICS) code is 238220 with a small business size standard of $19 Million. The magnitude of construction for this procurement is estimated to be between $250,000 and $500,000. Site Visit: An organized site visit will be held at the project location. See solicitation for details. In order to attend the site visit, you are required to pre-register. Attendance at the site visit will be limited to no more than two (2) representatives per company. The site visit will be held for the purpose of providing contractors with the opportunity to familiarize themselves with the site which may be helpful in the preparation of offers. Attendance at the site visit is not mandatory for offer submission; however, failure to visit the site will not relieve or mitigate the successful contractors responsibility and obligation to fully comply with the terms, conditions, and specifications contained and/or referenced in this document. Telephone requests for information will not be accepted or returned. In order to submit an offer on this project, your company must be registered in the System for Award Management (SAM) and maintain an active registration. Please see the attached solicitation and supporting documents. | 68% | Combined Synopsis | 07/07/2026 |
Repair Mechanical Systems IDIQ (FY 27-32) | 65% | Solicitation | 11/30/2026 |
Additional Details
Solicitation Number
FA461019RA029
Archive Date
Oct 9, 2019
Office Address
VANDENBERG SFB, CA, 93437-5212