Titan Dorm Furniture Delivery, Installation, and De-Installation Services
Archived on September 30, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM PDT
- Posted
- September 11, 2026
- Notice type
- Sources Sought
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 337121: Upholstered Household Furniture Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- SPACE SYSTEMS COMMAND.FA4610 30 CONS PK
- Place of performance
- California, 93437
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA461026SS1585
- Notice ID
- a0b57d1e91cf44e8a4bdd0602295de5f
Description
The 30th Contracting Squadron (30 CONS/PKB) at Vandenberg SFB, CA, is conducting market research to identify capable sources for a combined commercial supply and service requirement at Titan Dorm (Building 13135).
-
Products Required:
-
88 Twin XL Bunkable Bedframes: Solid hardwood/hardwood veneer construction, durable institutional finish, tool-less/hook assembly, integrated wire spring support, designed to seat 38" x 80" mattresses.
-
88 Twin XL Innerspring Mattresses: Finished dimensions 38" x 80" x 8"–11", firm, reversible, heavy-duty innerspring coils with continuous border wire butt-welded for perimeter edge support, institutional fluid-proof/bedbug-resistant ticking, fully compliant with 16 CFR Part 1632 and 16 CFR Part 1633.
-
-
Services & Facility Constraints:
-
Inside Delivery & Assembly: Unloading, staging, full assembly, placement, and leveling across 44 rooms (two standalone, unbunked beds per room; rooms measure 8' x 8'). Complete removal and off-base disposal of all packing debris.
-
De-Installation & Haul-Away: Dismantle, remove, and transport 44 existing Full XL bedframes and mattresses from Building 13135 to the base warehouse facility.
-
Multi-Story Stairwell Access (No Elevators): Building 13135 has no passenger or freight elevators. All new items must be manually carried up stairwells (clear stairwell width: 36.5 inches), and all removed assets must be manually carried down stairwells.
-
Critical Schedule Feasibility
Meeting the required project timeline is critical.
-
Full building access is available 1 October 2026.
-
Target/desired installation completion date is 16 November 2026.
-
Mandatory Final Completion Date: All delivery, full assembly, and removal services must be 100% complete NO LATER THAN (NLT) 4 December 2026.
-
Responders must explicitly state their manufacturing lead time and provide written confirmation of their ability to guarantee on-site delivery and completed installation by 4 December 2026. If unable to meet this date, vendors must provide their absolute earliest guaranteed completion date.
Submission Details & Optional ROM
Interested vendors are requested to submit a brief capability statement addressing:
-
Schedule Feasibility: Confirmation of guaranteed completion NLT 4 December 2026 and total lead time from award.
-
Technical Compliance: Brief confirmation that offered products meet the salient characteristics.
-
Logistics Capability: Confirmation of ability to execute multi-story manual stairwell carries without elevator support.
-
Contract Vehicles & Socio-Economic Status: Company name, CAGE, SAM Unique Entity Identifier (UEI), business size standard under NAICS 337121/337122, and any active GSA MAS contracts.
-
Optional Rough Order of Magnitude (ROM): Vendors are encouraged to submit an optional, non-binding ROM breakdown covering:
-
88 Bedframes
-
88 Mattresses
-
Freight to Vandenberg SFB (Zip 93437)
-
On-site assembly, staging, and leveling labor
-
De-installation, haul-away, and warehouse delivery labor
-
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (4)
- Download
Atch 3 - Titan Setup.jpg
1.1 MBAdded in Sources Sought version 3Posted - Download
Atch 3 - titan double bunk.jpg
623 KBAdded in Sources Sought version 3Posted - Download
Atch 2 - Salient Characteristics - Titan Dorm.pdf
248 KBAdded in Sources Sought version 3Posted - Download
Atch 1 - STATEMENT OF WORK - Titian Dorm Beds Install.pdf
245 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
Titan Dorm Furniture Delivery, Installation, and De-Installation Services
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
FA461026SS1585
Archive Date
Sep 30, 2026
Office Address
VANDENBERG SFB, CA, 93437-5212