Notice ID: 55683dfb554d7fa9d6c229e66fa54702Combined Synopsis/Solicitation
Repair/Replace Natural Gas Lines
Archived on September 7, 2019. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- August 15, 2019
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237120: Oil and Gas Pipeline and Related Structures Construction
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA4613 90 CONS PK
- Place of performance
- F.E. Warren AFB, WY, 82005
- PSC
- 38: CONSTRUCT/MINE/EXCAVATE/HIGHWY EQPT
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- FA461319RA004
- Notice ID
- 55683dfb554d7fa9d6c229e66fa54702
Description
**Added site visit questions, updated drawings and updated SOW.***
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Select documents to download
Showing 10 of 11 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Aug 15, 2019 | - |
Showing 1 to 10 of 11 results
Lifecycle
Solicitation:
FA461319RA004- Pre-Solicitation
- Combined Synopsis
- Pre-SolicitationDec 12, 2018
Repair/Replace Natural Gas Lines
- 4×Combined SynopsisCurrentJul 11, 2019
Repair/Replace Natural Gas Lines
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This project includes the removal of two existing steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest; two 300-gallon steel underground fuel storage tanks associated with two neighboring residential dwellings. This includes cleanup and disposal of any contaminated soils. Contractor shall field verify all new and existing conditions affecting the work of this contract before ordering products. | - | Combined Synopsis | 11/13/2026 |
This is a SOURCES SOUGHT notice; a market survey for information only, to be used for preliminary planning purposes. This is NOT a request for quotes or proposals. The intent of this notice is to identify qualified, experienced, and interested offerors capable of performing the type of work as described herein for information and planning purposes. The information received will be utilized by the United States Air Force to facilitate the planning and decision-making process and will not be disclosed outside of the agency. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. Respondents will NOT be notified of the results of this sources sought. Respondents are not required to submit information in response to this announcement to participate in any future solicitation that may come as a result of the information received. In accordance with Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.101(c)(2), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The 55th Contracting Squadron, Offutt Air Force Base, NE, is seeking information for the following items listed below: General: The purpose of this sources sought is to conduct Market Research in accordance with RFO Part 10, for the repair and replacement of existing gas leaks on 6” pipe and 8” pipe and valves, along with some associated component replacement on 2” pipe and valves. This requirement consists of repairing and replacing identified gas distribution system components, site verification, coordination for excavation, system outages, Lock-Out-Tag-Out, utility coordination, and operational testing. Please see the attached Statement of Work for more information. All project work and related services shall be performed IAW all terms, conditions, special contract requirements, specifications, attachments, technical exhibits and references and publications contained in the contract or incorporated by reference. All information is voluntary. The capabilities package should be complete and sufficiently detailed enough to allow the Government to determine the firm’s qualifications to perform the defined work. Your response should include the following information: Company Information Company name Address Point of contact Telephone and fax number E-mail address Website (if available) Commercial and Government Entity (CAGE) Code Unique Entity ID (UEI) Number Socio-Economic status (i.e., 8(a), HUBZone, women-owned, service-disabled veteran-owned, etc.) Experience and overview of your company Responses to this sources sought announcement can be submitted to the 55th Contracting Squadron via e-mail to gabriel.holcombe@us.af.mil by 12:00 PM Central Standard Time on 17 November 2026. IF A SOLICITATION IS ISSUED, IT WILL BE ANNOUNCED AT A LATER DATE. All interested parties must respond to any solicitation announcement separately from the responses to this announcement. No reimbursement will be made for any costs associated with providing information in response to this announcement. | - | Market Research | 11/17/2026 |
On October 21, 2026, amendment 0003 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 11/04/2026 to 11/17/2026. 2. Post RFI Q&A labeled "C04a RFI QA 1240LT26Q0109 102026." 3. Post revised SOW labeled "C04b New SOW 1240LT26Q0109 102026." 4. Post revised Specs labeled "C04c New Specs 1240LT26Q0109 102026." 5. Post measurement and payment supplement labeled "C04d Measurement PYMT Sup 1240LT26Q0109 102026." 6. Post measurement and payment specs labeled "C04e Measurement PYMT Spec 1240LT26Q0109 102026." 7. Post revised SOI labeled "C04f New SOI 1240LT26Q0109 102026." 8. Post options supplement labeled "C04g Options Supplement 1240LT26Q0109 102026." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************************* On October 16, 2026, amendment 0002 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/27/2026 to 11/04/2026. 2. Post the site visit attendance sheet labeled "C05a Site Visit 1240LT26Q0109." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************** On September 30, 2026, amendment 0001 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/08/2026 to 10/27/2026.This amendment must be acknowledged and submitted with your quote. ************************************************************************************************************************* Buckboard Marina Water System Improvements | - | Combined Synopsis | 11/17/2026 |
The 375th Contracting Squadron is performing Market Research to identify potential SBA-certified Women-Owned Small Businesses (WOSB) under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) with the qualifications, licenses, and technical capabilities to perform electrical conduit repair, drop tube replacement, and overfill alarm installation across designated fueling facilities at Scott Air Force Base, IL. Please contact MSgt Nolan Strange, nolan.strange.1@us.af.mil or Mr. Jody Noram, jody.noram.1@us.af.mil if you have any questions or concerns. DISCLAIMER: This Sources Sought is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), nor does it guarantee a future solicitation will be issued. The Government will not reimburse respondents for any costs associated with preparing or submitting information in response to this notice. 3. Capability Statement Submittal Requirements Interested vendors possessing the required expertise, equipment, and certified personnel are invited to submit a Capabilities Statement (maximum 5 pages) addressing the following: Company Information: Company name, address, SAM Unique Entity Identifier (UEI), CAGE Code, Point of Contact (name, email, phone), and Socioeconomic status (e.g., 8(a), SDVOSB, WOSB, HUBZone, Small Business). Technical Capabilities & Experience: Summary of relevant past performance completed within the last three (3) years on underground storage tank (UST) fueling systems, conduit breakout/pour-back, overfill drop tube replacements, and Veeder-Root or automatic tank gauge (ATG) sensor/alarm installations. Licensing & Certifications: Confirmation that personnel hold required state/local UST service technician certifications, Veeder-Root certified installer/technician credentials, and applicable electrical licensing. Rough Order of Magnitude (ROM): Optional feedback on typical lead times, mobilization timeframes, and commercial pricing structure for tasks of this nature. PART 2: STATEMENT OF WORK (SOW) 1.0 Objective & Overview The Contractor shall furnish all necessary labor, supervision, materials, tools, equipment, testing apparatus, and transportation (except for specified Government/Owner-Furnished Equipment) to perform concrete breakout and conduit correction, electrical re-wiring, drop tube replacement, and overfill alarm installation across designated fueling facilities. 2.0 Detailed Scope of Work by Facility and Task TASK AREA 1: Premium Tank Sump Conduit Repair & Electrical Remediation The Contractor shall repair incorrectly poured conduit serving the Premium tank sump, complete necessary electrical re-pulls, and restore the concrete pad to original structural grade. Demolition & Concrete Breakout: Precision sawcut and breakout existing concrete around the Premium tank sump to expose the buried conduit line. Protect adjacent sump structures, lid seats, and underground utilities from collateral damage during breakout operations. Conduit Clearing & Realignment: Cut apart the obstructed/incorrect conduit run and clear out concrete or foreign debris resulting from the prior incorrect pour. Reconnect the conduit run using code-compliant, liquid-tight, fuel-resistant fittings and conduit rated for Class I, Division 1/2 hazardous fuel environments. Ensure proper pitch, sealing, and alignment. Electrical Wiring & Terminations: Pull new electrical conductors/wiring from the main building panel/control area to the tank sub-unit junction box in accordance with the National Electrical Code (NEC/NFPA 70). Terminate all wiring connections, verify seal-offs, and conduct comprehensive continuity, insulation resistance (megger), and operational tests to ensure proper equipment operation. Civil Restoration: Backfill excavated trench using suitable aggregate, compacted in uniform lifts to match surrounding base compaction specifications. Form and pour back high-early-strength concrete to match the existing grade, thickness, and finish of the fueling apron. TASK AREA 2: Facility 6047806 – Tank 3 Drop Tube Replacement The Contractor shall remove obsolete fill hardware and install a compliant drop tube assembly on Tank 3. Hardware Removal & Disposal: Remove the existing fill adapter, fill cap, and drop tube assembly. Safely load, manifest (if required), transport, and legally dispose of all obsolete components off-site in compliance with all local, state, and federal environmental regulations. Furnish & Install New Hardware: Furnish and install one (1) new OPW overfill prevention drop tube (or Government-approved equal), one (1) new fill adapter, and one (1) new heavy-duty locking cap. Special Technical Condition: Work assumes the existing drop tube is removable without structural failure and the existing spill container (spill bucket) remains sound and reusable. If the drop tube is seized or the spill bucket is found to be compromised/damaged, the Contractor shall immediately notify the Contracting Officer Representative (COR). Any required replacement of seized components or spill containers shall be evaluated and authorized via a formal bilateral change order prior to proceeding. Regulatory Compliance Verification: Set and verify that the drop tube shutoff mechanism operates at the exact level mandated by 40 CFR Part 280 / state UST regulations (e.g., 95% tank capacity shutoff or 90% flow restriction). Deliverables & Documentation: Document pre-work conditions, intermediate installation stages, and final configuration with high-resolution digital photographs. Submit photos and completed compliance checklist with the final job completion paperwork. TASK AREA 3: Facility 6047801 – Overfill Alarm Installation The Contractor shall remove the existing overfill alarm and install owner-provided Veeder-Root monitoring hardware. Demolition: Disconnect and remove the existing overfill alarm unit; transport and dispose of all removed scrap components off-site. Installation of Government/Owner-Furnished Equipment (GFE/OFE): The Government/Owner will provide: One (1) Veeder-Root Overfill Alarm (Part # 790091-001 / SKU: 790091-001) One (1) Veeder-Root Universal Sensor Mounting Kit (Part # 330020-012 / SKU: 330020-012) The Contractor shall furnish all certified labor, wiring, hardware, seals, and incidental consumables to properly mount, wire, and integrate the alarm with the existing automatic tank gauge (ATG) system. Testing & Commissioning: Perform functional operational checkout of the Veeder-Root alarm and sensor assembly to verify positive alarm annunciation and correct signal communication to the console. Deliverables & Documentation: Take detailed digital photographs of the completed installation, wiring junction, and console status screen indicating an operational, alarm-free condition. Submit completion paperwork and test verification logs to the COR. 3.0 Site Cleanup, Waste Management & Housekeeping Debris Haul-Off: The Contractor shall continuously maintain a clean and safe work zone. Upon completion of each task, the Contractor shall collect, load, haul off, and legally dispose of all concrete rubble, excavated soils, cut conduit, old wiring, discarded drop tubes, and packaging debris. Hazardous Materials: Any fuel-wetted materials or petroleum rags generated during servicing shall be managed and disposed of in accordance with applicable RCRA and local environmental standards. 4.0 Submittals and Deliverables Deliverable Site Safety Plan & AHAs Activity Hazard Analysis for sawcutting, confined spaces, and hazardous fuel zones Technician Certifications Veeder-Root certified technician & state UST licenses With quote / proposal submittal Drop Tube Compliance Verification Documented drop tube shutoff height calculation and verification sheet Photo Documentation Package Clear digital photos showing before, during, and after conditions for all tasks Disposal Manifests/Receipts Proof of lawful disposal for concrete and metallic/fuel-wetted scrap 5.0 Safety, Code Compliance & Working Conditions Safety Regulations: All work shall comply with OSHA 29 CFR 1910 and 1926 standards, NFPA 30 (Flammable and Combustible Liquids Code), NFPA 30A (Motor Fuel Dispensing Facilities), and NFPA 70 (National Electrical Code). Hot Work & Hazardous Locations: Sump areas represent Class I, Division 1/2 environments. The Contractor shall implement atmospheric monitoring (LEL meters) and obtain all required hot work permits before operating saws, cutting tools, or electrical equipment near open sumps. | - | Market Research | 10/30/2026 |
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area. | - | Solicitation | 12/04/2026 |
Additional Details
Solicitation Number
FA461319RA004
Archive Date
Sep 7, 2019
Office Address
FE WARREN AFB, WY, 82005-2860