GovChime
Notice ID: ad7ccd40bcb345148ea65684ddce93ddSolicitationArchived

22 MXS - Power Pitts & Jet Power Unit Troubleshooting - McConnell AFB

Archived on August 26, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM CDT
Posted
July 27, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR MOBILITY COMMAND.FA4621 22 CONS PK
Place of performance
PRAIRIE VLG, Kansas, 67221
PSC
J059: MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA462126Q0037
Notice ID
ad7ccd40bcb345148ea65684ddce93dd

Description

The 22nd Maintenance Group at McConnell AFB, Kansas, has a requirement for the troubleshooting of non-functional aircraft ground power assets. Specifically, the contractor shall provide all management, tools, supplies, equipment, labor, transportation, and supervision required to troubleshoot the telescoping Power Pit systems (Model USS24S(12)-20X20-32X32-60D-400Hz(30)) operating at a 400Hz frequency located in Building 1124 (South Bay) and Building 1125 (Center Bay/Main Hangar Bay), as well as a high-capacity Jet Power Unit manufactured by JBT AeroTech (Jetway Systems) located in Building 1126 (Center Bay). This high-capacity converter unit is a Model JTP3 Plus 180KVA/480V/60HZ asset (Part Number: 2913670.17BLU1, Serial Number: 45159, manufactured in July 2015) designed with an electrical input configuration of 480 Volts, 3-Phase, 60 Hz at 200 Amps, delivering a specialized output of 115 Volts, 3-Phase, 400 Hz at 520 Amps, with a total rating of 180 KVA.

Questions are due to the contracting office no later 4 August 2026 at 1000 AM CDT. 

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (2)

  • Atch 1 - SoW Power Pit - Jet Power Troubleshooting dated 27 July 2026.pdf

    2.3 MBAdded in Solicitation version 3Posted
    Download
  • Solicitation - FA462126Q0037.pdf

    506 KBAdded in Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchivedCurrent

    22 MXS - Power Pitts & Jet Power Unit Troubleshooting - McConnell AFB

    Notice ad7ccd40bcb345148ea65684ddce93dd on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA462126Q0037

Archive Date

Aug 26, 2026

Office Address

MCCONNELL AFB, KS, 67221-3702