GovChime
Notice ID: 40985e9d872a63d11d094bd972bd3d09Solicitation

Energy Management and Control Systems Services at Grand Forks AFB, ND

Archived on January 1, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−06:00
Posted
June 14, 2019
Notice type
Solicitation
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA4659 319 CONS PK
Place of performance
295 Steen Blvd, Bldg. 242 , Grand Forks Afb, ND, 58205-6222
PSC
J: MAINT, REPAIR, REBUILD EQUIPMENT
Last updated
Jan 23, 2026

Identifiers

Solicitation number
FA465919RA003
Notice ID
40985e9d872a63d11d094bd972bd3d09

Description

The 319th Contracting Flight at Grand Forks Air Force Base (GFAFB), ND is issuing a Request for Proposal (RFP) for a Firm Fixed Price (FFP) definite-quantity contract for Energy Management and Control Systems (EMCS) Services to be performed at GFAFB, ND. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain Energy Management and Control Systems (EMCS) at Grand Forks AFB, ND. The contract personnel must be able to upgrade, maintain, and repair the base EMCS System in addition to performing a variety of technical and administrative tasks in support of the overall HVAC functions in strict accordance with the Performance Work Statement (dated 1 May 2019). This solicitation will result in a Firm-Fixed Price type contract for services with a period of performance of one base year and four one-year option years. The base period will be from 28 September 2019 through 27 September 2020. The North American Industry Classification System (NAICS) code is 238220, Heating, ventilation and air-conditioning (HVAC) contractors, with a small business size standard of $15M. Award will be made using the Source Selection procedures referenced in FAR 15.3. Source Selection, as well as the tradeoff procedures referenced in FAR 15.101-1 Tradeoff Process, resulting in the best value to the Government. This is a competitive best value source selection in which competing offerors' past performance history will be evaluated on a basis significantly more important than cost or price. By submission of its offer, the offeror consents to all solicitation requirements, including terms and conditions, representations and certifications. This acquisition will be solicited on an Unrestricted Basis. All contractors MUST be registered in the SYSTEM FOR AWARD MANAGEMENT (SAM) database or their proposal MAY NOT be considered for award. Contractors can obtain further information on the SAM database at the website https://www.sam.gov. This solicitation will only be available by downloading the solicitation and http://www.fedbizopps.gov. No paper copies or CD-ROMS will be issued. Once the solicitation is issued, it is incumbent upon the interested parties to visit the website frequently for any updates/amendments to all documents. All responsible sources may submit a proposal, which will be considered by the agency. Any questions can be directed to Mr. Ja'Haun K. Stafford at 701-747-5266 or via email at jahaun.stafford.2@us.af.mil and Mr. Jeremiah Snedker at 701-747-5299 or via email at jeremiah.snedker@us.af.mil.

Full description on SAM.gov

Award Overview

Mentioned in the description

From description, unverified
sued. Once the solicitation is issued, it is incumbent upon the interested parties to visit the web

We searched the solicitation description for the word “incumbent” and surfaced the surrounding text. This is not a confirmed match.

Contacts

Documents

Select documents to download

Showing 10 of 11 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-
SolicitationDEPT OF THE AIR FORCEJun 14, 2019-

Showing 1 to 10 of 11 results

Lifecycle

Solicitation:FA465919RA003
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationMay 1, 2019

    Energy Management and Control Systems Services at Grand Forks AFB, ND

    Notice f10188495d886d624e7e799bacfd6608 on SAM.gov

  2. SolicitationCurrentJun 14, 2019

    Energy Management and Control Systems Services at Grand Forks AFB, ND

    Notice 40985e9d872a63d11d094bd972bd3d09 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Repair Mechanical Systems IDIQ (FY 27-32)
-Solicitation11/30/2026
This requirement was awarded on an unusual and compelling basis. Please refer to attached Justification and Approval for additional details.
-AwardedOpen
This is a new requirement that will be awarded as a brand name competitive full and open contract. The contractor shall provide technical drawings, technical expertise, telephone support, on-site engineering support, liaison services for warranty management, and the training necessary to enable the Government to maintain and repair 100-ton HVAC system (Carrier), Human Machine Interface (HMI) control panel and exterior safety door located at Building 670 within the 402nd Commodities Maintenance Group (CMSX) at Robins Air Force Base. The proposed nine-month period of perfromance is expected to be 28 Dec 2026 to 24 Sep 2027. See PD Paragraph for full details on HVAC, HMI control panel, and exterior safety door.
-Combined Synopsis11/12/2026
FA8501-27-RAPID-RPR RPL HVAC B301-OTA Under the RAPID Umbrella Framework: UHHZ990029 RAPID RPR RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), BLDG 300 at Robins AFB, GA Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to repair, modernize, and sustain critical HVAC and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia. The requirement includes replacement or modernization of end-of-life HVAC equipment; improvements necessary to provide reliable climate control and energy-efficient operations; and associated interior work to address accessibility barriers, lead-based paint, asbestos-containing flooring, degraded finishes, and workspace configuration. The supporting work is necessary to improve occupant safety, facility reliability, code compliance, and uninterrupted mission operations for Facility 300’s critical multi-tenant organizations. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose The purpose of this Area of Interest is to identify commercially viable, safe, resilient, and schedule-credible solutions to repair and modernize the heating, ventilation, and air-conditioning (HVAC) and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia. The Government seeks an integrated approach that restores reliable environmental control; addresses end-of-life HVAC equipment; and supports remediation or modernization of affected interior conditions, including lead-based paint, asbestos-containing flooring, accessibility barriers, and degraded workspace configurations. The selected approach must sustain uninterrupted operations for Facility 300’s multi-tenant mission partners—including supply-chain management, network support, special operations/rotary-wing management, and C-5 cargo aircraft management—while improving energy performance, occupant safety, accessibility, maintainability, and compliance with applicable safety, energy, and Unified Facilities Criteria (UFC) requirements. Solutions should provide a practical and phased path to execute the work with minimal disruption to occupied operations and with appropriate control of construction, environmental, safety, operational-continuity, and schedule risks. The Government is interested in approaches that leverage commercial practices, innovative delivery methods, and demonstrable capabilities; any use of Other Transaction Authority (OTA) remains subject to confirmation of statutory authority, appropriate use criteria, and contracting/legal review. Project Background and Existing Conditions Facility 300 (constructed in 1942) is a critical multi-tenant facility supporting several key Department of War (DoW) missions, including the 448 SCMG (Supply Chain Management Group), 78 ABW IT (Zone 4/5 network support), LCMC/WIUW (Special Operations/Rotary management), and LCMC/WLS (C-5 cargo aircraft management). Sustainable, modern facility systems are essential to maintain uninterrupted operations for these critical national security and logistics missions. The building systems are severely degraded. The HVAC units have exceeded their lifecycle, resulting in frequent failures, high maintenance costs, and inadequate climate control. Walls have peeling lead-based paint, and degraded flooring under the carpet contains asbestos. The basement east section is currently inaccessible under ADA standards. This project repairs and modernizes Building 300 workspace to prevent safety hazards (slips/falls), optimize interior space configuration, improve occupant morale, and ensure compliance with energy, safety, and UFC codes. The building 300 will remain in partial operation during the entire duration of the project. Project Areas OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Build-Only execution approach under the standalone statutory authority of 10 U.S.C. § 2808a. Because the Government has provided a 100% completed design package and/or specific phasing and repair requirements, this project does not contain a collaborative design-builder phase. Instead, it transitions directly to rapid construction execution under an OTA structure to bypass administrative procurement lag. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 16 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page via email to the designated point of contact listed. Jimmy Ezzell – jimmy.ezzell.1@us.af.mil Amelia Kelly - amelia.kelly@us.af.mil The Solution Brief shall include: A. Cover Page • Company name • UEI • Mailing address • Primary point of contact • Email address and telephone number • Identification of this RAPID AOI B. Executive Summary • Summary of the respondent’s qualifications and anticipated delivery capability; • Identification of any material capability, staffing, access, bonding, or teaming assumptions. C. Past Relevant Construction Experience • Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on large commercial buildings and or Government facilities involving Repair/Replace of HVAC systems • Focus: Historical performance in occupied facilities, managing congested site logistics, working in restricted areas (e.g., flightlines), and adhering to environmental and safety standards. D. Team Composition and Organization • Focus: Adequacy of the proposed organizational structure and the qualifications of Key Personnel (Project Manager, full-time Site Superintendent, Site Safety and Health Officer, and Quality Control Manager). E. Construction Execution and Phasing Approach • Focus: Technical understanding of the 100% Government-furnished design, methodology for physical work execution, utility outage coordination, and the realism of the proposed master schedule. The evaluation will assess the team's ability to provide continuous on-site leadership and effectively coordinate with Government personnel daily. F. Financial Capacity and Bonding • A statement of financial capacity to perform the anticipated work • Current single-project and aggregate bonding capacity, if bonds are anticipated; • Name of surety • Any other information necessary to demonstrate capacity to perform the anticipated project. Evaluation & Selection Criteria The Government will utilize a two-step, Best-Value selection process mapped to the RAPID framework to select the Company. The evaluation process consists of: Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 & 3 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications (SOQ) Evaluation Factors (Phase 1 above) Factor 1: Past Relevant Construction Experience o Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on Government runway/ taxiway projects that entail repair or replacement or new construction o Focus: Historical performance in occupied facilities, managing congested site logistics, working in restricted areas (e.g., flightlines), and adhering to environmental and safety standards. Factor 2: Team Composition and Organization o Focus: Adequacy of the proposed organizational structure and the qualifications of Key Personnel (Project Manager, full-time Site Superintendent, Site Safety and Health Officer, and Quality Control Manager). Factor 3: Construction Execution and Phasing Approach o Focus: Technical understanding of the 100% Government-furnished design, methodology for physical work execution, utility outage coordination, and the realism of the proposed master schedule. The evaluation will assess the team's ability to provide continuous on-site leadership and effectively coordinate with Government personnel daily. Step 2: Pitch Presentation and Price Evaluation (Phase 2/Final Down-Select) The Government will invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Constructability Review and Risk Management (Presentation) Focus: o Capacity to identify potential field conflicts, manage supply chain volatility, and mitigate risk (e.g., unforeseen site conditions, hazardous materials, weather delays) using the provided 100% design and phasing plan. Factor 2: Collaborative Execution and Problem-Solving (Presentation/Q&A) o Focus: Ability to work cooperatively with base stakeholders and the Project Delivery Team to resolve real-time field conflicts, safety incidents, or schedule recovery actions. Factor 3: Financial Capacity and Bonding o Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. o The estimated magnitude of construction associated with this Area of Interest (AOI) is $20M to $40M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement Final Selection and Award (Phase 3) The Government will make a final best-value down-select decision. The Company to be awarded is the company’s whose combined technical qualifications, execution pitch, and price proposal represent the most advantageous offer to the Government. The Government reserves the right to have more than one final down selectee to request proposals if necessary. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: • Invite, not invite, or limit respondents advancing to later phases; • Conduct technical exchanges; • Request clarifications or supplemental information; • Negotiate with one or more respondents; • Modify, suspend, or cancel this Special Notice; • Issue additional notices or requests; and • Make no award. Attachments 1. B300 HVAC Bay A & Headhouse OTA_RUNWAY REPAIR SOO 2. UHHZ990029 Complete set of drawings 3. UHHZ990029 HAZMAT report 4. UHHZ990029 Updated Specifications 5. UHHZ990029 Submittal Register Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization: While the immediate requirement under this AOI is the HVAC at Bay A and the Headhouse at Building 300, offerors are advised that participation and successful evaluation under this AOI may provide significant strategic opportunities beyond the initial project.
-Special Notice11/16/2026
Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.
-Combined Synopsis11/12/2026

Additional Details

Solicitation Number

FA465919RA003

Archive Date

Jan 1, 2022

Office Address

GRAND FORKS AFB, ND, 58205