GovChime
Notice ID: 89fb2f9e7d1a4e7dabcafcc6344ffd18Presolicitation

Airfield Civil Works IDIQ

Responses closed . Full description on SAM.gov.

Overview

Response deadline
9:00 AM CDT
Posted
August 11, 2026
Notice type
Presolicitation
Set-aside
Small Business Set Aside - Total
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR COMBAT COMMAND.FA4819 325 CONS PKP
Place of performance
220 Checkertail Way, BLDG 36235Tyndall AFB, FL 32403, 32403
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA481926FM002
Notice ID
89fb2f9e7d1a4e7dabcafcc6344ffd18

Description

This is the official pre-solicitation notice for the Tyndall Air Force Base Airfield Civil Works Indefinite Delivery, Indefinite Quantity (IDIQ) requirement. The points of contact (POCs) for this pre-solicitation are SrA Frances Montgomery at (850)283-8640 or frances.motngomery@us.af.mil, Mr. Joseph Petersen at (850)283-8618 or joseph.petersen.3@us.af.mil, and Mrs. Tanya Gutka at (850)283-8650 or tanya.gutka@us.af.mil.This will be a 100% Small Business Set-Aside under the North American Industry Classification System (NAICS) code 237310 Highway, Street, and Bridge Construction and the Product Service Code (PSC) Z2BD Repair or Alteration of Airport Runways and Taxiways Services. The small business size standard under NAICS 237310 is $45,000,000.00. The Department of the Air Force anticipates issuing a solicitation for a comprehensive Indefinite Delivery/Indefinite Quantity (IDIQ) contract to execute various civil works projects on the active airfield at Tyndall AFB where specific requirements and quantities will be established via individual Task Orders throughout the five-year ordering period (base year and four option years). The scope of work encompasses the demolition, repair, and new construction of heavy-load airfield pavements, including Portland Cement Concrete (PCC), Hot Mix Asphalt (HMA), and interlocking pavers. Associated civil infrastructure tasks include earthwork, subgrade preparation, and grading.Key Operational and Environmental Constraints:This requirement necessitates operating within a highly restricted, active military flightline environment. The successful contractor must possess the proven capability to:Execute complex construction phasing that minimizes operational downtime for active runways and taxiways.Maintain rigorous flightline safety protocols, including comprehensive Foreign Object Debris (FOD) prevention and dynamic coordination with Air Traffic Control (ATC) and Airfield Management.Achieve strict adherence to Unified Facilities Guide Specifications (UFGS) for heavy aircraft loading and DoD safety manual EM 385-1-1.Manage complex environmental compliance, including securing Environmental Resource Permits (ERP) and safely handling, containing, and disposing of contaminated soils and groundwater, specifically in areas impacted by Aqueous Film Forming Foam (AFFF).Upon release of the solicitation on the PIEE Solicitation module, all responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. At this time, the agency is not accepting proposals but all potential offerors are encouraged to indicate interest in this requirement through the PIEE Solicitation module.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Lifecycle

  1. 1
    Version 1PresolicitationCurrent

    Airfield Civil Works IDIQ

    Notice 89fb2f9e7d1a4e7dabcafcc6344ffd18 on SAM.gov

  2. 2
    Version 2Solicitation

    Type changed from Presolicitation to Solicitation

    Airfield Civil Works IDIQ

    Notice d2154a4c26ff480c8426c2483a39e795 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is the official solicitation for the Tyndall Air Force Base Airfield Civil Works Indefinite Delivery, Indefinite Quantity (IDIQ) requirement. The points of contact (POCs) for this pre-solicitation are SrA Frances Montgomery at (850)283-8640 or frances.motngomery@us.af.mil, Mr. Joseph Petersen at (850)283-8618 or joseph.petersen.3@us.af.mil, and Mrs. Tanya Gutka at (850)283-8650 or tanya.gutka@us.af.mil. This will be a 100% Small Business Set-Aside under the North American Industry Classification System (NAICS) code 237310 Highway, Street, and Bridge Construction and the Product Service Code (PSC) Z2BD Repair or Alteration of Airport Runways and Taxiways Services. The small business size standard under NAICS 237310 is $45,000,000.00. The Department of the Air Force anticipates issuing a solicitation for a comprehensive Indefinite Delivery/Indefinite Quantity (IDIQ) contract to execute various civil works projects on the active airfield at Tyndall AFB where specific requirements and quantities will be established via individual Task Orders throughout the five-year ordering period (base year and four option years). The scope of work encompasses the demolition, repair, and new construction of heavy-load airfield pavements, including Portland Cement Concrete (PCC), Hot Mix Asphalt (HMA), and interlocking pavers. Associated civil infrastructure tasks include earthwork, subgrade preparation, and grading. Key Operational and Environmental Constraints: This requirement necessitates operating within a highly restricted, active military flightline environment. The successful contractor must possess the proven capability to: Execute complex construction phasing that minimizes operational downtime for active runways and taxiways; maintain rigorous flightline safety protocols; including comprehensive Foreign Object Debris (FOD) prevention and dynamic coordination with Air Traffic Control (ATC) and Airfield Management; achieve strict adherence to Unified Facilities Guide Specifications (UFGS) for heavy aircraft loading and DoD safety manual EM 385-1-1; manage complex environmental compliance; including securing Environmental Resource Permits (ERP) and safely handling, containing, and disposing of contaminated soils and groundwater, specifically in areas impacted by Aqueous Film Forming Foam (AFFF). All potential offerors will submit proposals through the PIEE Solicitation module. Proposals are due NLT 05 OCT 26 at 09:30 AM CDT. Questions are due NLT 08 SEP 26 at 10:00 AM CDT.
-Solicitation10/05/2026
Schedule A: $2,160,623.00 Schedule A Material Incentive: $24,300.00 Schedule B: $1,492,239.00 Schedule C: $645,043.00 Schedule C Material Incentive: $2,000.00 Schedule D: $528,889.50 Schedule D Material Incentive: $2,200.00 Schedule E: $206,138.00 Schedule E Material Incentive: $800.00 Schedule F: $56,381.25 Schedule F Material Incentive: $120.00 Schedule G: $437,398.50 Schedule G Material Incentive: $2,200.00
-AwardedOpen
Project Labor Agreement (PLA) Request for Information (RFI) for Construction Project for Airfield Pavement Repairs in the State of Florida This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time. Naval Facilities Engineering System Command (NAVFAC) Southeast is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for the Airfield Pavement Repairs located at Naval Air Station Whiting Field, Milton, Florida. Construction may include, but is not limited to, repairing the airfield pavement by mill, overlay, and restripe pavement sections within the north airfield at NAS Whiting Field, including Runway 05-23, Runway 14-32, Taxiway A, Taxiway B, Taxiway C, Taxiway D, Taxiway E, Taxiway F, Taxiway G, Taxiway HL, Taxiway NL, Taxiway APPC, and the adjacent Parking Areas. Approximate total concrete pavement repair area is approximately 800,000 square yards. Repairs will include barricades, saw cutting, milling, asphalt overlay, sweeping and preparing pavement surfaces. Minor repairs to concrete pavement include spall repair and joint replacement. The grade adjacent to the runway shoulder pavement edges will be re-graded, compacted and sodded for positive drainage. All airfield pavement markings will be replaced and the airfield lighting removed and replaced as required, reinstalled and adjusted to enable milling and overlay in accordance with UFC 3-260-01 Airfield and Heliport Planning and Design, UFC 3-260-02 Pavement Design for Airfields, and NAVAIR 51-50AAA-2 General Requirements for Shore based Airfield Marking and Lighting. New airfield markings (striping and numbers) will be applied in accordance with current FAA criteria and UFC 3-260-04 Airfield and Heliport Marking. located in the State of Florida. Project will be design-bid-build. NAICS Code: 237310. The magnitude of construction is anticipated to be $25M – $100M. General period of performance is anticipated to be approximately 540 calendar days. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire. This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended. Responses shall be submitted on the attached questionnaire via email to Cynthia McMonigle at cynthia.a.mcmonigle.civ@us.navy.mil, and cc: Aimee Johnson at aimee.n.johnson2.civ@us.navy.mil. no later than 3:00 PM Eastern Time on 11/24/2026.
-Special Notice11/24/2026
1. Action Type: Award Notice 2. Contract Award Number (PIID): W911WN27PA004 3. Original Solicitation Number: W911WN26QA049 4. Contracting Activity: U.S. Army Corps of Engineers (USACE), Pittsburgh District (CELRP) 5. Contractor Awarded: WSP USA Solutions, Inc. 6. Award Date: 28 October 2026 7. Award Amount: $211,681.15 (Firm-Fixed-Price) 8. Classification: - NAICS: 237310 (Highway, Street, and Bridge Construction) - PSC: Z2BD (Repair or Alteration of Airport Runways and Taxiways) 9. Description of Work: Procurement of commercial construction services for the repair of the Delta Ramp flight line at Avon Park Air Force Range, Florida. The scope of work entails 18 localized spot repairs totaling approximately 17,813 square feet of 2-inch asphalt milling and patching in accordance with military airfield paving specifications (UFGS 32 12 15.13). 10. Authority / Contracting Rationale: This commercial purchase order was awarded on a sole-source basis under the Simplified Acquisition Threshold (SAT) in accordance with RFO 12.102(a). WSP USA Solutions, Inc. was the sole source reasonably available to satisfy the agency's requirements, which encompassed physical flight line repairs and the simultaneous, direct settlement of an outstanding property damage liability claim resulting in a negotiated $100,000.00 contractor liability credit. 11. Primary Point of Contact: Nick Zulauf, Contract Specialist Email: nicholas.r.zulauf@usace.army.mil
-AwardedOpen
PRE-SOLICITATION SYNOPSIS NOTICE ONLY: THE SOLICITATION WILL BE AVAILABLE ON OR ABOUT NOVEMBER 4, 2026 AT HTTPS://SAM.GOV/. THE SOLICITATION NUMBER IS N6945027R0007, FOR THE DESIGN-BID-BUILD (DBB) CONSTRUCTION PROJECT FOR THE NOLA PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT NAVAL AIR STATION (NAS) JOINT RESERVE BASE (JRB), NEW ORLEANS, LOUISISANA PROJECT TITLE: DESIGN BID BUILD CONSTRUCTION PROJECT, NOLA PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT NAVAL AIR STATION (NAS) JOINT RESERVE BASE (JRB), NEW ORLEANS, LOUISIANA PSC: Z2BD (Repair or Alteration of AIRPORT RUNWAYS AND TAXIWAYS) NAICS: 236220 – Commercial and Institutional Building Construction THIS IS NOT A REQUEST FOR PROPOSALS OR AN INVITATION FOR BID. NO CONTRACT WILL BE AWARDED FROM THIS ANNOUNCEMENT. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation currently available. In order to protect the procurement integrity of any future procurement that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. Description: This acquisition may result in the award of a Design Bid Build (DBB) Firm Fixed Price (FFP) Construction contract for the full-depth reconstruction of pavement sections within the Runway 22 threshold, Runway 0422, Taxiway Alpha, Taxiway Bravo, and Taxiway Foxtrot. Asphalt pavement mill and overlay and asphalt section full-depth construction is required to accommodate the new concrete pavement. Additionally, the entire length of runway 0422 is required to be re-striped, following rubber and paint removal. The contract performance period is 1,110 calendar days (inclusive of the base period and any exercised options) from the date of contract award. Schedule submission and progress tracking will be governed by FAR Clause 52.236-15, Schedules for Construction Contracts. The best value continuum source selection process to be used for this acquisition is the Tradeoff process in accordance with FAR 15.103-1. The Tradeoff process is appropriate when it may be in the best interest of the Government to consider award to other than the lowest priced offeror or other than the highest technically rated offeror. A sources sought notice was posted to sam.gov on March 17, 2026, requesting small business industry interested and capability statement. Based on responses from the notice it was determined that the requirement should be issued as Full and Open competition. The NAVFAC Small Business Office Concurs with this determination. The solicitation will be a negotiated DBB acquisition. Proposals will be solicited in a one-phase submission for a single solicitation. The solicitation will utilize source selection procedures, which require offerors to submit a technical proposal, past performance and experience information, and a price proposal for evaluation by the Government. Award will be made to the offeror whose total price and technical proposal offers the best value to the Government. Competition Requirements: Unrestricted basis, under full and open competition. Procurement Method: FAR Part 15, Contracting by Negotiation. Type of Contract: Firm-Fixed Price The NAICS code for this construction solicitation is 236220 with a size standard of $45,000,000. Project Magnitude is $75,000,000 or greater. This is a new procurement. It does not replace an existing contract. No prior contract information exists. A Site Visit will be held for those offerors who choose to participate (exact date and time will be specified in the solicitation). Proposals will be due no earlier than 30 days after the solicitation is released (exact date and time will be specified in the solicitation). This will be an electronic solicitation, which can be downloaded from Sam.gov Opportunities at https://sam.gov/. The solicitation will be available at this site no earlier than 15 days after this pre-solicitation notice is posted. Offerors are responsible for checking the Sam.gov website for the solicitation and any subsequent amendments that may be issued. NO CONTRACT AWARD WILL BE MADE TO ANY CONTRACTOR THAT IS NOT REGISTERED OR IN THE PROCESS OF REGISTERING WITH THE SYSTEM FOR AWARD MANAGEMENT (SAM). PLEASE VISIT THE SAM WEBSITE AT https://www.sam.gov FOR INSTRUCTIONS ON HOW TO REGISTER.
-Pre-Solicitation11/04/2026

Additional Details

Solicitation Number

FA481926FM002

Archive Date

Aug 11, 2027

Office Address

TYNDALL AFB, FL, 32403