Notice ID: 1ef9a87bd50040a4ac67efc038247591Solicitation
Server Rack Replacement and Cable Management
Archived on August 31, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- August 13, 2024
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541519: Other Computer Related Services
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA4877 355 CONS PK
- Place of performance
- Tucson, AZ, 85708
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- FA487724Q0016
- Notice ID
- 1ef9a87bd50040a4ac67efc038247591
Description
The 355th Communications Squadron (355 CS), Davis-Monthan AFB (DMAFB), requires the contractor to replace 4 server racks and perform cable management on 11 racks in 355 CS data center. The contractor will provide a proposed Performance Work Statement (PWS) as part of its quotation, proposed period of performance, personnel, equipment, tools, parts, labor, supervision, management, and transportation necessary to accomplish server rack replacement and cable management services. The total number of racks to be replaced is four, in Row #2, Racks 1-4. The contractor will remove the equipment from the existing racks, dispose of the existing racks, install new racks, and replace the equipment on the new racks. The replacement racks must include the following: 42U data center cabinet supporting 19 rack mounted equipment with the ability to accept rack cage nuts. Nominal width should be at least 29 with a front opening of at least 25 . Nominal depth should be at least 39 with rail depth up to 36 . Have adjustable rails. Have a single perforated front door and a double perforated rear door, both with lockable key latches. The top panel must have 4 cable openings, one at each corner, with included grommets. Must have 4 vertical cable managers with fingers aligning between each U that are also in-line with the top panels cable openings but do not interfere with the installation or removal of rack mounted equipment. Must come with enough cage nuts and screws to populate every slot on all 4 rails. Must come with 2 vertical mounted PDUs (zero U), mounted securely, supporting 24 NEMA 5-20 outputs at 120V and a NEMA L5-30P input at 120V with the ability to be actively monitored via SNMP. The contractor will perform the following regarding cable management. Replace and organize all connections in Row #1, Racks 7-14A (rack 11 doesnt exist) and Row #2, Racks 1-4. Utilize maintenance loops using existing cable trays to provide neatness, accessibility, and to allow freedom of movement for future serviceability. Properly identify cables in accordance with ANSI/TIA-606-C to include identifying: Pathways Patch panels Ports Cabling Telecommunications space Work area outlets Racks and cabinets Grounding busbars Firestop locations Data center room grid Update LIU/patch panel labels and legend inserts.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
FA487724Q0016- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 5×SolicitationCurrentAug 2, 2024
Server Rack Replacement and Cable Management
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
FA487724Q0016
Archive Date
Aug 31, 2024
Office Address
DAVIS MONTHAN AFB, AZ, 85707-3522