FTQW 18-0209 F-35 Weapon Training Reno

Awarded on July 31, 2019. Full description on SAM.gov.

Awarded tounder FA500419CA010 (source: SAM.gov award notice)• $10.6M

Overview

Posted
August 5, 2019
Notice type
Award Notice

Notice details

Place of performance
2310 Central Ave , Eielson Afb, AK, 99702
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 4, 2025
Award date
Jul 31, 2019
Award amount (SAM.gov award notice)
$10.6M

Identifiers

Solicitation number
FA500419BA006
Notice ID
d0585c0e74ff6de11e616a7fba15cd9a
Award number (PIID)
FA500419CA010

Description

***Updated*** Bid opening will be 28 June 2019 at 14:00 (2:00pm) AKDT.

Full description on SAM.gov

Award Overview

Award Number

FA500419CA010

Award Amount (SAM.gov award notice)

$10.6M

Award Date

Jul 31, 2019

Awardee

Awardee UEI

K31MJM3ARKJ1

Original Solicitation

Notice ID: d0585c0e74ff6de11e616a7fba15cd9a

Posted Date: Aug 5, 2019

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • W911KB24C0008
    WATTERSON CONSTRUCTION COMPANY
    Department of DefenseNAICS 236220
    $55.8MSigned Jul 29, 2026
  • W911KB24C0008
    WATTERSON CONSTRUCTION COMPANY
    Department of DefenseNAICS 236220
    $55.8MSigned Mar 30, 2026
  • W911KB24C0008
    WATTERSON CONSTRUCTION COMPANY
    Department of DefenseNAICS 236220
    $55.8MSigned Jan 28, 2026
  • W911KB24C0008
    WATTERSON CONSTRUCTION CO
    Department of DefenseNAICS 236220
    $55.2MSigned Sep 26, 2025
  • W911KB24C0008
    WATTERSON CONSTRUCTION CO
    Department of DefenseNAICS 236220
    $55.2MSigned Sep 4, 2025

Contacts

Documents

Select documents to download

Showing 10 of 31 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-
Combined Synopsis/SolicitationDepartment of WarAug 5, 2019-

Showing 1 to 10 of 31 results

Lifecycle

Solicitation:FA500419BA006
  1. Pre-Solicitation
  2. Combined Synopsis
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationMar 4, 2019

    FTQW 18-0209 F-35 Weapon Training Reno

    Notice 22dada4d58d822a4abf5c9f0965d7008 on SAM.gov

  2. 10×
    Combined SynopsisApr 24, 2019

    F-35 Weapons Load Training Reno

    Notice ce36ac9b687ce20b490016caced7c715 on SAM.gov

  3. AwardedCurrentAug 5, 2019

    FTQW 18-0209 F-35 Weapon Training Reno

    Notice d0585c0e74ff6de11e616a7fba15cd9a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The 628th Contracting Squadron at Joint Base Charleston (JBC), SC is seeking capabilities packages from potential sources for planning purposes for the Repair Naval Reserve Training Facility B3370 at Joint Base Charleston, South Carolina. This project includes the renovation of the Naval Reserve Building 3370 that is used for reserve training 1-2 weekends per month with approximately 250 occupants per weekend. Daily occupancy is about 25 people on a normal usage, and the weekends have high occupancy. The project scope is to replace the HVAC equipment in attempts to eliminate the recent mold growth inside the facility and incidental related work. The humid air has caused the need for temporary de-humidifiers and mold cleanup within the facility. The building currently has numerous HVAC roof top units (RTUs), and the climate control is not working to reduce the high humidity inside the building. A new HVAC system will be designed and any mold or water damaged areas removed, and finishes restored, such as re-painting or replacing ceiling tiles. Cybersecurity is also required for this project Renovation. The renovation shall include providing new HVAC units on the roof and providing any electrical equipment needed to support the new HVAC system, as well as providing duct smoke detectors. A HAZMAT survey was performed to determine the extent of mold that may need to be abated during demolition and refinishing. A plumbing sewer line needs repair at the latrines, to replace it with positive drainage to the existing sewer pump. Dollar magnitude of this requirement is between $1,000,000.00 and $5,000,000.00. The NAICS Code assigned to this acquisition is 2362200 – Commercial and Institutional Building Construction with a Size Standard of $45,000,000.00
69%
Market Research04/01/2029
The U.S. Army Corps of Engineers USACE, Alaska District, is seeking to identify a Design-Build Team or Design-Builder for ACC003 Weapons Generation Complex and Northern Flightline, a major project in support of the Fighter Town Recapitalization FTR Program at Joint Base Elmendorf-Richardson JBER, Alaska. The FTR Program is a multiphase initiative to redevelop a significant portion of JBER with modern, resilient, and expanded infrastructure while maintaining mission continuity for active base and airfield operations throughout all phases of construction and facility turnover. Within this broader program, the ACC003 project will encompass construction of the new Weapons Generation Complex and associated Northern Flightline facilities at JBER, Alaska. The scope includes approximately sixteen new facilities, comprising hangars, operations buildings, and munitions storage magazines. A key constraint is the requirement for the new WGC to be operational before the existing facility can be decommissioned, ensuring zero operational downtime for this mission. The project will be constructed on pre-excavated sites with preconstructed utilities delivered under a separate, preceding agreement.
62%
Solicitation11/24/2026
AMENDMENT 2 The purpose of this amendment is to add Attachment 4 Outdoor Fitness Building B-389 Set of Drawings ---------------------------------------------------------------------------------------------------------- AMENDMENT 1 The purpose of this amendment is to add Attachment 3 Spec 26 41 01.0010 Lightning Protection System ----------------------------------------------------------------------------------------------------------- Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support Notice Type: Sources Sought / Market Research Notice Number: HARBSS-2027-01 Contracting Office: 482d CONF/PK Location of Performance: Homestead Air Reserve Base, Florida Response Due Date/Time: November 26, 2026, 5:00 PM EST Response Submission: Nika Salemi, nika.salemi.2@us.af.mil Proposed NAICS Code: 236220, Commercial and Institutional Building Construction Proposed Product Service Code (PSC): 5670 Building Components, Prefabricated 1. Notice Purpose THIS IS A SOURCES SOUGHT NOTICE ISSUED FOR MARKET-RESEARCH AND PLANNING PURPOSES ONLY. THIS NOTICE IS NOT A SOLICITATION, REQUEST FOR PROPOSAL, REQUEST FOR QUOTATION, INVITATION FOR BID, OR COMMITMENT BY THE GOVERNMENT TO AWARD A CONTRACT. The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL, seeks information from capable commercial sources, including all small-business socioeconomic categories, to determine the availability and capability of firms that can perform the requirement described in Attachment 1 KYJM19-9003 Outdoor Fitness SOW, Red Horse Project, 12 Nov 2026. Responses will be used to support acquisition planning, including consideration of the appropriate contract type, acquisition approach, and potential small-business set-aside strategy. The Government will not reimburse respondents for any costs associated with preparation or submission of information in response to this notice. A response to this notice is not required to respond to a future solicitation, if issued. Any future solicitation will be announced separately. 2. Requirement Overview The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL is conducting market research for the Outdoor Fitness Facility, Building 389 project at Homestead Air Reserve Base (HARB), Florida. The anticipated requirement is primarily for the procurement, delivery, and associated submittals for construction materials and equipment required to support construction of an outdoor fitness facility. Air Force RED HORSE personnel will perform the majority of construction and installation activities. Contractor installation responsibilities are limited principally to the steel picket fence and, if applicable, a separate lightning-protection system. The contractor would be expected to: Procure and deliver all materials identified in the Government-furnished bill of materials (BOM), Attachment 2 Outdoor Fitness Facility, BOM Template. Furnish the Pre-Engineered Building (PEB) package, including engineered shop drawings and all associated structure materials. Coordinate concrete-truck deliveries to support Government construction execution. Furnish the specified construction equipment for the required durations, fueled and ready for operation at the work site. Install a new steel picket fence, including site restoration for areas disturbed by fence installation. Install a lightning-protection system if the proposed PEB cannot include a compliant built-in lightning-protection system. The provided BOM identifies, among other materials and equipment, rubber fitness flooring, concrete masonry materials, electrical distribution materials, outdoor fans, motion-activated lighting, concrete, base course, PEB-related items, and construction-equipment rentals. 3. Anticipated Scope 3.1 Material Procurement and Delivery The contractor shall be capable of procuring, delivering, and warranting the materials and equipment identified in the Government-furnished BOM. The contractor shall provide required material and equipment submittals before ordering materials, and the Government will approve final submittals in writing before purchase. Anticipated submittals include: Steel picket fence; PEB signed and sealed shop drawings; Outdoor ceiling fans; Lighting; Smart meter; Electrical panel; Fitness flooring; Bird netting; Material warranty plan, including roof, flooring, and other applicable equipment warranties; and Fence material and labor warranty. 3.2 Pre-Engineered Building Package The contractor shall be capable of providing a complete PEB material package based on Government design drawings, including digitally signed and sealed shop drawings prepared by a Professional Engineer. The PEB package is expected to include, at a minimum: Lifting-rack/support beams; A fixed steel beam with predrilled holes for 25-foot ropes; Toe-hold bars located three inches above the finished floor; Factory coating and painting, with Government-selected colors; Medium-bronze exterior roof panels and manufacturer-standard light interior roof panels; Standing seam metal roofing; Gutters and downspouts; Built-in copper lightning protection, where available; and Black, heavy-duty polyethylene bird netting with ¾-inch mesh meeting or exceeding the specified mesh-quality and break-strength requirements. The PEB shall be designed in accordance with the SOW’s specified structural and high-velocity-wind requirements. The SOW requires a minimum 20-year material warranty, a current Miami-Dade Notice of Acceptance for the PEB and insulation, and a roof assembly capable of the stated uplift and wind criteria. Zinc-plated metal is prohibited. 3.3 Lightning Protection System — Conditional Installation If a compliant PEB with built-in lightning protection is unavailable, the contractor shall be capable of furnishing and installing a conventional lightning-protection and grounding system following completion of RED HORSE construction activities. The contractor’s capability should include: Copper lightning-protection materials; Installation shop drawings; UL-listed and labeled components; Fence-bonding connections; Grounding-system testing and test-point documentation; Third-party inspection and written certification by an entity independent of the system designer and installer; and Compliance with the project’s cited lightning-protection requirements. 3.4 Steel Picket Fence Installation and Site Restoration The contractor shall be capable of furnishing and installing a steel picket fence around the outdoor-fitness-facility overhang structure. The fence must be located at least five feet from the roof overhang and include an accessible, lockable gate/door. The fence-related scope includes required access and equipment doors, hardware, and restoration of disturbed areas using St. Augustine sod. 3.5 Construction Equipment The contractor shall be capable of furnishing the construction equipment identified in the BOM for the stated rental periods or project duration. Anticipated equipment includes a 12,000-pound telehandler forklift, skid loaders with buckets and forks, a water truck, scissor lifts, straight-track manlifts, a double-drum roller, a mini excavator with hammer, a dump truck, and concrete forms with pins. Equipment shall be delivered to the project site, fueled, and ready for operation. The contractor will not be responsible for subsequent refueling unless otherwise established in a future solicitation. 3.6 Installation Access and On-Site Requirements Potential sources should be capable of working on an active military installation and complying with applicable installation access, identification, safety, security, and operations-security requirements. For contractor-performed installation work, the contractor must be capable of providing an English-fluent site superintendent who remains on site during contract performance. Excavation, if required, will require coordination and permits before work begins; the SOW specifies that permit requests must be submitted at least three weeks before excavation. Normal anticipated work hours for fence installation are 0730–1630, Monday through Friday, excluding Federal holidays, unless alternate hours are approved in writing. 4. Requested Capability Statement Information Interested firms should submit a capability statement of no more than 10 pages, excluding product literature and certifications. Responses should address the following: Company Information Legal business name; Unique Entity Identifier (UEI); CAGE code, if assigned; SAM registration status and expiration date Physical address; Point of contact, telephone number, and email address; and Identification of any General Services Administration schedule, multiple-award contract, or other contract vehicle the Government could consider, if applicable. Business size and Socioeconomic Status under the proposed NAICS code(s) Business Size Under Proposed NAICS Code 236220 Small Business Status Small Disadvantaged Business Status 8(A) Business Development Program Status HUBZone Small Business Status Service-Disabled Veteran-Owned Small Business Status Veteran-Owned Small Business Status Women-Owned Small Business Status Economically Disadvantaged Women-Owned Small Business Status Technical Capability Demonstrated capability to procure, deliver, and manage the full BOM; Demonstrated capability to furnish a PEB meeting the project’s engineering, wind-resistance, warranty, and Miami-Dade Notice of Acceptance requirements; Ability to provide shop drawings signed and sealed by a qualified Professional Engineer; Capability to provide construction equipment in the quantities and durations described in the BOM; Capability to install steel picket fencing and restore disturbed site areas; and If applicable, capability to install, test, and obtain independent third-party certification of a lightning-protection system. Relevant Experience Provide up to three recent projects of similar size, complexity, and technical characteristics completed within the past five years. For each project, identify the customer, location, period of performance, brief scope, total contract value, and a customer point of contact if release is authorized. Schedule and Supply-Chain Information Estimated lead time for PEB engineering, fabrication, and delivery; Estimated lead time for major material categories and equipment rentals; Known supply-chain risks or long-lead items; Ability to coordinate concrete deliveries; and Recommended phasing approach to support RED HORSE construction. Commerciality and Alternatives Identify whether the proposed supplies are commercial products; Identify any commercially available alternatives that meet or exceed the salient project requirements; Identify material substitutions or specification clarifications that may improve availability, schedule, resiliency, or lifecycle cost; and Clearly identify any requirement that the respondent believes limits competition, along with a technically acceptable alternative. Rough-Order-of-Magnitude Information Provide a nonbinding rough-order-of-magnitude estimate, broken out by: PEB package; Materials procurement and delivery; Construction equipment; Fence installation and site restoration; Conditional lightning-protection installation; and Any other significant cost driver. This information is requested for planning only and will not be treated as an offer or proposal. 5. Response Instructions Submit responses via email to nika.salemi.2@us.af.mil no later than 5:00 PM EST on November 26, 2026. Use the following subject line: Sources Sought Response – Outdoor Fitness Facility B-389 – [Company Name] Email X of X (insert number of the email and total number of emails) Do not submit classified information. If a respondent believes its submission contains proprietary information, the respondent shall clearly identify the specific proprietary portions of its submission. 6. Government Reservation of Rights This Sources Sought notice is issued solely for planning and market-research purposes. The Government may use information received in response to this notice to refine the requirement, determine the appropriate acquisition strategy, assess the availability of capable small-business concerns, and determine whether to issue a future solicitation. The Government is not obligated to issue a solicitation or award a contract as a result of this notice. The Government may revise, cancel, or take no further action regarding this requirement. 7. System for Award Management Firms are encouraged to provide their SAM registration status and expiration date with their response. While SAM registration is not required to submit a response to this Sources Sought notice, any firm submitting an offer or quotation under a future solicitation must be registered in the System for Award Management at the time required by the applicable solicitation and Revolutionary FAR Overhaul requirements.
54%
Market Research11/26/2026
The Department of the Air Force intends to award a firm-fixed-price design-build construction contract for renovation of the Outdoor Recreation Facility, Building 164, at Homestead Air Reserve Base, Florida. IAW DAFMAN 64-119, NAF Contracting Procedures, Small Business programs do not apply to NAF Contracting actions. This is a non-appropriated fund purchase, and it does not obligate appropriated funds of the Unites States Government. Non-appropriated funds are generated by the military community through the sale of goods and services and the collection of fees and charges for participation in military community programs. This purchase does not involve federal tax dollars. IAW DAFMAN 64-119, NAF Contracting Procedures, Para 2.8 NAF Procurement Exemptions, Title 15 U.S.C. Section 631 et seq., also known as the Small Business Act, as amended, and Federal Acquisition Regulation guidance relative to small business along with other award-preference programs. NAF contracts are awarded to the firm whose proposal is most advantageous to the NAFI. The Contractor shall furnish all labor, supervision, materials, equipment, transportation, design and engineering services, tools, permits, testing, inspections, quality control, warranties, and closeout documentation necessary to complete the work in accordance with the solicitation, Statement of Work, drawings, specifications, and all attachments. The requirement includes design-build services for renovation and improvement of Building 164. Work includes, but is not limited to, preparation of design documents; demolition; roofing and exterior-envelope improvements; doors, windows, exterior walls, and drainage work; interior renovations; mechanical, plumbing, electrical, and lighting work; site improvements; testing; inspections; warranties; and closeout documentation. The solicitation will include a base requirement consisting of Phases 1 and 2 and a separately priced Option 1 for Phase 3. The specific requirements for the base requirement and Option 1 are identified in Section B and the Statement of Work. NAICS Code: 236220 – Commercial and Institutional Building Construction Size Standard: $45.0 Million Average Annual Receipts PSC: Y1JZ – Construction of Miscellaneous Buildings Place of Performance: Homestead Air Reserve Base Building 164 Homestead, Florida Contract Type: Firm-Fixed-Price, Design-Build Construction Magnitude of Construction: Between $250,000 and $500,000 Period of Performance: 360 calendar days after issuance of the Notice to Proceed. SITE VISIT: A site visit will be held on 10 November 2026 at 10:00 a.m. Eastern Time. Attendance is strongly encouraged but is not mandatory. Offerors planning to attend shall submit the completed base-access form no later than 5 November 2026 at 10:00 a.m. Eastern Time. At this time, Homestead Air Reserve Base is processing site-visit access requests for United States citizens only. Site-visit directions have been posted to this posting. Offerors that do not attend the site visit remain responsible for becoming familiar with existing conditions, site access restrictions, facility operations, utility conditions, material-staging limitations, and all other conditions that may affect performance. Google Maps Link: https://maps.app.goo.gl/ivLWZZMdBPCdnQMU7 Sign In Sheet for the site visit conducted on 11/10/26 has been posted as attachment to this posting. Due to access issues, there will be a second site visit scheduled for 11/17/26 at 10 AM. All terms and conditions explained above will apply to this site visit as well. Sign in seeht has been posted as an attachment to this posting. QUESTIONS: Questions concerning this solicitation shall be submitted in writing to Tahj Guilford at tahj.guilford.2@us.af.mil no later than 20 November 2026 at 10:00 a.m. Eastern Time. Questions received after the stated deadline may not be answered. The Government anticipates posting responses to timely submitted questions on or about 27 November 2026 at 3:00 p.m. Eastern Time. PROPOSAL SUBMISSION: Offerors shall submit proposals electronically to tahj.guilford.2@us.af.mil no later than 2 December 2026 at 12:00 p.m. Eastern Time. Proposals shall be submitted in the format required by Sections L and M of the solicitation. Offerors are responsible for ensuring proposals are received by the Government before the closing date and time. The Government intends to make award without discussions but reserves the right to conduct discussions if determined to be in the Government’s best interest. All amendments to this solicitation will be posted through SAM.gov. Offerors are responsible for monitoring SAM.gov for amendments and acknowledging all amendments with their proposal. The full solicitation package, including the SF 1442, Statement of Work, pricing schedule, drawings, specifications, wage determination, and other attachments, are available with this notice.
54%
Solicitation12/02/2026
The Design Build Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to design and construct a log cabin kit to be ordered from Conestoga Log Cabins. Existing site already has 2 new Conestoga Log Cabins and continuity is recommended. The Design Build Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to design and construct an asphalt paved parking lot for the Wateree Recreation users and employee use. All work shall be done in strict accordance with this Statement of Work and subject to the terms and conditions of the contract and in accordance with Unified Facilities Criteria (UFC), Unified Facilities Guide Specifications(UFGS), International Building Code (IBC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina Department of Transportation (SCDOT), and Shaw Air Force Base Design Standards.
54%
Market Research11/20/2026

Additional Details

Solicitation Number

FA500419BA006

Archive Date

Jan 1, 2022

Office Address