GovChime
Notice ID: 836c73987b3842f4a804ff7057d8ecd8Solicitation

Project No. AJJY 22-1031 Renovate Air Traffic Control Tower Building 18015

Archived on October 7, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 PM UTC+00:00
Posted
September 14, 2022
Notice type
Solicitation
Set-aside
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA5240 36 CONS LGC
Place of performance
Andersen AFB, GU, 96929
Last updated
Sep 25, 2026

Identifiers

Solicitation number
FA524022B0002
Notice ID
836c73987b3842f4a804ff7057d8ecd8

Description

Project No. AJJY 22-1031, Renovate Air Traffic Control Tower B-18015, AAFB, Guam PROPOSAL DUE DATE & TIME: Date: Wednesday, 22 September 2022 Time: 0900 (ChST) as indicated in SF 1442 DESCRIPTION OF WORK: The contractor shall provide multiple repairs which include demolition and construction for renovation of Air Traffic Control Tower B18015. The work includes removing all existing unused appurtenances from the old oxygen generating equipment such as concrete pads, electrical/mechanical equipment, and other related items. The work also includes the removal of carpet in each office and for it to be replaced with ceramic tile floors. Elevator shall be replaced 1 for 1. The work requires the elevator to be the same type and size cab that shall fit into the existing shaft with no structural modifications. No additional stops or landings will be added. The work also includes HVAC and investigation of the drainage of the clear water rinse at the 15th floor. This will connect to the existing condensate riser. MAGNITUDE (FAR 36.204 (f)): $1,000,000.00 - $5,000,000.00 LOCATION OF WORK: Andersen Air Force Base (AAFB), Guam PERIOD OF PERFORMANCE: 548 Calendar Days RESTRICTION TO SMALL BUSINESS: This acquisition is being competed as a Historically Underutilized Business Zone (HUBZone) Small Business set-aside. The applicable North American Industry Classification System (NAICS) code for this acquisition is 236220, with a small business size standard of $39.5 million. CONTRACT TYPE: Firm-Fixed Price (FFP) SITE VISIT: 1 September 2022 at 0900 ChST (See Attachment 8) REQUEST FOR CONTROLLED ATTACHMENTS: Send an email request to contracting POC’s listed below for the controlled attachments (Attachments 2 & 3). REQUEST FOR INFORMATION: Any Requests for Information (RFIs) regarding this solicitation are due on or before Thursday, 8 September 2022 at 1200 ChST, and shall be submitted electronically via email to both the primary POC Jayna E. Rhoads at jayna.rhoads@us.af.mil and secondary POC David C. White at david.white.40@us.af.mil. The Government does not intend to respond to inquiries submitted after this deadline. All questions will be answered and provided via SAM.gov posting in a Q&A format for this solicitation. It is the offeror's responsibility to monitor SAM.gov for any amendments or updates. Subject line for all correspondence shall contain FA524022B0002, Renovate Air Traffic Control Tower. PROPOSAL SUBMISSION: Proposals shall be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) at the link below. See Section L (Attachment 6) and the Proposal Manager Instructions (Attachment 10). LINK: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=FA524022B0002 Refer to Attachment 9 for bid opening instructions and information NOTICE TO OFFERORS: Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. The Government reserves the right to cancel this solicitation, either before or after closing of receipt of Bids.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:FA524022B0002
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationAug 5, 2022

    Renovate Air Traffic Control Tower

    Notice 20f2d3b14f754e1d8662049b0558bfbe on SAM.gov

  2. 4×
    SolicitationCurrentAug 21, 2022

    Project No. AJJY 22-1031 Renovate Air Traffic Control Tower Building 18015

    Notice 836c73987b3842f4a804ff7057d8ecd8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0002 Correction- RFI reponses were not included with Amendment 0002. Added to attachments, [RFIs-FA502526RB006 (27 Aug Updates)] Amendment 0002- The purpose of this Amendment is to: -Extend the proposal due date from 11 September 2026 to 16 September 2026 at 0000GMT / 0900JST -Update Requirement Description text -Remove requirement for Bond/Guarantee -Update RFI responses with further clarifications (2 clarified responses. Highlighted Yellow) -Add or Replace Updated Section J Attachments: -Replace previous SOW (Rev5) with updated revision 8 -Add updated Drawings (Drawing labeled "########" on SF30 is labeled "Transfer Surface Drawing" on SAM. Original Document name is "米軍工事転移表面") All other terms and conditions remain the same. Amendment 0001- The purpose of this amendment is to provide the responses to all RFIs submitted by the August 21st deadline. Additional questions will only be accepted if they relate directly to one of the government responses. Follow-up questions must be submitted by August 28th, at 1200 JST. As of now, there will not be an extension in the proposal submission deadline. If an updated SOW and drawings are not provided before the deadline, the answers in the RFIs will take precedence over any conflicting information within the documents. All other terms and conditions remain the same. Amendment 0: Due to internal system issues, this amendment will be considered "Amendment 0" for acknowledgement of amendments on block 19 of the SF 1442. We apologize for the inconvenience. Amendment details - Correction in response to RFI. "Block 13.b of the SF 1442" requires a bid bond/guarantee. Disregard this, as a bid bond/guarantee is not required for this requirement. The 356th Expeditionary Theater Support Group (356 ETSG/CONS) Contracting Office is posting this solicitation for a design-build construction project to deliver a membrane shelter at Matsushima Japan Air Self-Defense Force (JASDF) Base, Japan. Complete project requirements, technical specifications, and performance parameters are detailed in the attached draft Statement of Work (SOW) and corresponding project drawings. Project Magnitude / ROM (Rough Order of Magnitude): Between $1,000,000 and $5,000,000 USD. ⚠️ SPECIAL NOTICE: MANDATORY JAPANESE LICENSING REQUIREMENT In accordance with Japanese Construction Industry Law (Law No. 100 of 1949), the Prime Contractor (or the lead entity of a joint venture) MUST hold a valid Japanese Construction License at the time of proposal submission. No Subcontracting of License: To ensure direct performance accountability and robust contract administration, the offering Prime Contractor itself (or the lead entity of a Joint Venture) must hold this license. Relying on a subcontractor's Japanese Construction License to satisfy this requirement is prohibited. Compliance: Offerors must submit proof of the Prime Contractor's license with their technical proposal. Sub-contracting a company with the license will not be permitted. Evaluation: This is a strict pass/fail threshold requirement. Proposals from prime vendors who do not hold this license or cannot demonstrate legal compliance with Japanese construction licensing laws will be determined non-compliant and excluded from evaluation. 1. Critical Acquisition Milestones & Deadlines Please review the timeline below carefully. Late submissions or questions will not be entertained unless explicitly authorized by the Contracting Officer. All times are in Japan Standard Time (JST). Site Visit (Completed): An organized pre-solicitation site visit was held on 05 August 2026. No secondary or additional site visits will be hosted. Additional RFI Deadline: 21 August 2026 @ 09:00 AM JST. Additional RFIs must be sent via email to both designated POCs (see below) by this deadline to be answered. RFI Responses Posted: The government's RFI responses will be posted as an amendment to this notice no later than 24 August 2026. Proposal Submission Due Date: 11 September 2026 @ 09:00 AM JST. 2. Important Submission & Evaluation Instructions Request for Information (RFI) Ground Rules: Resulting from the August 5th site visit, RFIs were submitted and are currently in the process of being answered. Once the formal RFI responses are posted on August 24th, additional questions will only be accepted if they relate directly to one of the published government responses. This process may result in an extended proposal submission window, but does not guarantee additional response time. Proposal Due Date Clarification: Please ignore any system-generated defaults on SAM.gov or within the SF 1447 block that state "00:00 local time" as the submission deadline. The official, legally binding deadline for proposal receipt is September 11th, 2026, at 09:00 AM JST. Evaluation Guidelines: The full SF 1447 solicitation document contains all guidelines for proposal submission (Section L) and the evaluation factors for award (Section M). These instructions and evaluation factors will only be amended to correct clerical errors or clear up misunderstandings. 3. Contact Instructions Please direct all questions, RFIs, and final proposal submissions* via email to both of the following Points of Contact: SSgt Cameron Smith: cameron.smith.16@us.af.mil SSgt Daniel Callahan: daniel.callahan.7@us.af.mil * For submissions over 10mb, they will not be accepted by our internal e-mail security measures. Offerors must submit a request for a DoDSAFE link to submit their proposals no later than 48hrs before submission deadline.
-Solicitation09/16/2026
Amendment 0001- The purpose of this amendment is to provide the responses to all RFIs submitted by the August 24th deadline. Additional questions will only be accepted if they relate directly to one of the government responses. Follow-up questions must be submitted by August 28th, at 1200 JST. As of now, there will not be an extension in the proposal submission deadline. If an updated SOW and drawings are not provided before the deadline, the answers in the RFIs will take precedence over any conflicting information within the documents. All other terms and conditions remain the same. The 356th Expeditionary Theater Support Group (356 ETSG/CONS) Contracting Office is posting this solicitation for two (2) design-build construction projects to deliver storage shelters at Misawa Air Base, Japan. Complete project requirements, technical specifications, and performance parameters are detailed in the corresponding attached draft Statement of Work (SOW) and project drawings. The following are the ROMs for each site: Project Magnitude / ROM (Rough Order of Magnitude): Site 1 (C-1) Applicable Proposal ROM: $1,000,000 to $5,000,000 Site 2 (A-1) Applicable Proposal ROM: $3,000,000 to $7,000,000 1. Critical Acquisition Milestones & Deadlines Please review the timeline below carefully. Late submissions or questions will not be entertained unless explicitly authorized by the Contracting Officer. All times are in Japan Standard Time (JST). Site Visit (Completed): An organized pre-solicitation site visit was held on 03 August 2026. No secondary or additional site visits will be hosted. Additional RFI Deadline: 21 August 2026 @ 09:00 AM JST. Additional RFIs must be sent via email to both designated POCs (see below) by this deadline to be answered. RFI Responses Posted: The government's RFI responses will be posted as an amendment to this notice no later than 24 August 2026. With the RFIs, the final SOW, drawings and related updates will be provided as well. Proposal Submission Due Date: 11 September 2026 @ 12:00PM JST. Multiple or Single Award: At this time, the Government intends to make two separate awards (one contract for each site) to the responsible Offeror(s) whose proposal(s) provide the best value to the Government. There is a possibility of one single award, but it is not guaranteed. The Government will conduct two distinct evaluations- one for Site 1 and one for Site 2. Offerors may win one site, both sites, or neither site. 2. Important Submission & Evaluation Instructions Request for Information (RFI) Ground Rules: Resulting from the August 3rd site visit, RFIs were submitted and are currently in the process of being answered. Once the formal RFI responses are posted by August 24th, additional questions will only be accepted if they relate directly to one of the published government responses. This process may result in an extended proposal submission window, but does not guarantee additional response time. Proposal Due Date Clarification: Please ignore any system-generated defaults on SAM.gov or within the SF 1447 block that state "03:00 GMT" as the submission deadline. The official, legally binding deadline for proposal receipt is September 11th, 2026, at 12:00 PM JST. Evaluation Guidelines: The full SF 1447 solicitation document contains all guidelines for proposal submission (Section L) and the evaluation factors for award (Section M). These instructions and evaluation factors will only be amended to correct clerical errors or clear up misunderstandings. 3. Contact Instructions Please direct all questions, RFIs, and final proposal submissions* via email to both of the following Points of Contact: SSgt Cameron Smith: cameron.smith.16@us.af.mil SSgt Daniel Callahan: daniel.callahan.7@us.af.mil * For submissions over 10mb, they will not be accepted by our internal e-mail security measures. Offerors must submit a request for a DoDSAFE link to submit their proposals no later than 48hrs before submission deadline.
-Solicitation09/11/2026
Amendment 0002 and PPI Notice 1. PPI Notice 1 is INFORMATION ONLY and provided in response to pre-proposal inquiries (PPIs). The proposal due date remains unchanged at 8 December 2026 at 3:00 p.m. JST. Offeror shall acknowledge this amendment in Block 19 of the SF1442 submitted with their proposals.
-Solicitation12/08/2026
Amendment 0006 of subject solicitation N4008426R7500 is hereby posted. The date for submission of proposals is changed to 1 December 2026, no later than 11:00 a.m. Thailand local time. *************************************************************************************************************************************************************************************************************************************************************** Amendment 0005 of subject solicitation N4008426R7500 is hereby posted. The date for submission of proposals is changed to 29 October 2026, no later than 11:00 a.m. Thailand local time. *************************************************************************************************************************************************************************************************************************************************************** Amendment 0004 of subject solicitation N4008426R7500 is intentionally skip due to system error. *************************************************************************************************************************************************************************************************************************************************************** Amendment 0003 of subject solicitation N4008426R7500 is hereby posted. The date for submission of proposals is changed to 9 October 2026, no later than 11:00 a.m. Thailand local time. *************************************************************************************************************************************************************************************************************************************************************** Amendment 0002 of subject solicitation N4008426R7500 is hereby posted. The date for submission of proposals is changed to 18 September 2026, no later than 11:00 a.m. Thailand local time. **************************************************************************************************************************************************************************************************************************************************************** Amendment 0001 of subject solicitation N4008426R7500 is hereby posted. The date for submission of proposals is changed to 4 September 2026, no later than 11:00 a.m. Thailand local time. **************************************************************************************************************************************************************************************************************************************************************** Title: N4008426R7500 DB RMAC FACILITY IMPROVEMENT AT NETDC, SAN ANTONIO, ZAMBALES, PHILIPPINES Request for Proposal N4008426R7500 DB RMAC FACILITY IMPROVEMENT AT NETDC, SAN ANTONIO, ZAMBALES, PHILIPPINES is hereby posted. Enclosure 1. Proposal Inquiry form and Enclosure 4. Blank Bill of Quantity (BOQ) are provided in both pdf. and excel. formats, for your use. Pre-Solicitation Site Visit (PPSV) is scheduled on 28 July 2026, at 1000-1200 hours, Philippines local time. Place: Naval Education and Training Doctrine Command (NETDC) in San Antonio, Zambales, in the vicinity of (IVO), GPS coordinates - please see in the RFP. Meeting Place: NETC Main Gate / GPS coordinates - please see in the RFP. Contractors did not submitted the base access request, in reference to Pre-Solicitation Notice #N4008426R7500 will not be allowed to attend the site visit. ****************************************************************************************************************************************************************************************************************************************************************************************************** NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation currently available. In order to protect the integrity of any future procurement that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. Notice Type: Pre-Solicitation Notice Response Date: Jun 22, 2026, 11:00 AM Thailand Time This notice aims to provide public notice of a forthcoming project at Naval Education Training Command (NETDC), Naval Station Leovigildo Gantioqui, San Antonio, Zambales, Philippines. The government plans to issue a solicitation approximately July or August 2026. This notice also aims to collect names of contractors interested in attending the pre-solicitation site visit for the Base Access Request (BAR) that will be facilitated by the US Government. Detail of the notice is in the provided attachment.
-Solicitation12/01/2026
SOURCES SOUGHT ANNOUNCEMENT AND INDUSTRY DAY NOTICE PROGRESSIVE DESIGN-BUILD (PDB) OTHER TRANSACTION AGREEMENT (OTA) ICD-705 Controlled Spaces Modernization and Sustainment Program Osan Air Base, Republic of Korea U.S. Army Corps of Engineers – Far East District DISCLAIMER: This Sources Sought is issued solely for market research/intelligence and acquisition planning. It is not a solicitation, Request for Qualifications, or commitment to issue a solicitation or award any agreement or contract. No Statements of Qualifications or proposals are requested. Participation is voluntary; the Government will not reimburse response costs and will not accept unsolicited proposals. Responses will inform acquisition strategy, industry capability assessment, and project delivery options. Responding does not affect eligibility for any future solicitation. THE OPPORTUNITY The U.S. Army Corps of Engineers, Far East District (USACE FED) invites industry partners to help shape the acquisition strategy for a high-priority modernization and sustainment program involving ICD-705 controlled spaces at Osan Air Base, Republic of Korea. The Government is evaluating an innovative Progressive Design-Build (PDB) delivery method executed through an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a. This approach enables early contractor involvement, collaborative design development, open-book pricing, and flexible risk allocation—advantages particularly valuable for complex, security-sensitive work performed in an active overseas operational environment with unique host-nation and ICD-705 constraints. The Government has not made a final acquisition strategy determination and seeks candid industry input on the benefits, limitations, risks, and commercial terms of a PDB OTA compared with traditional design-bid-build or design-build approaches. WHY PROGRESSIVE DESIGN-BUILD / OTA? ICD-705 controlled spaces, collective protection systems, and HVAC modernization on an active air base present technical, security, operational, and logistical complexities that benefit from early industry engagement. A PDB OTA structure may allow: Joint refinement of requirements and design while the facility remains operational; Early identification and mitigation of long-lead items, host-nation interfaces, and ICD-705 accreditation risks; Transparent, open-book cost development leading to a more reliable construction baseline (including potential GMP); Flexible commercial terms and governance tailored to the unique constraints of overseas military construction in the Republic of Korea. The Government is particularly interested in industry’s practical experience with these methods on similar secure or operationally constrained projects, as well as any recommended alternatives that would better achieve mission, schedule, and cost objectives. PROJECT SCOPE The program encompasses modernization and sustainment work in two existing facilities at Osan Air Base: Building A – Collective Protection, HVAC & ICD-705 Modernization Replace the existing M49 Collective Protection System (CPS) filter system with a new M98 CPS, including associated blast doors, seals, relief valves, electronic control systems, and other appurtenances, fully coordinated with applicable ICD-705 requirements. Replace or modernize principal components of the existing HVAC system to support ICD-705 environmental and security standards. Convert approximately 2,610 square feet of existing space to meet applicable ICD-705 requirements. Building B – ICD-705 Conversion & Facility Sustainment Convert approximately 3,700 square feet of existing space to meet applicable ICD-705 requirements. Perform sustainment work on approximately 50,000 square feet, including roof repairs and existing office space improvements. Repair and/or replace components of the existing fire protection and fire alarm systems; air-handling units (AHUs), air-cooled condensing units (ACCUs), and associated HVAC infrastructure; bathroom fixtures and plumbing; plus associated incidental work required to complete the planned improvements. Estimated program magnitude: $60–100 million. Construction funding for both facilities is anticipated for obligation in FY27, subject to availability of funds and applicable approvals. This Sources Sought is the Government’s primary tool to assess industry interest, capability, and preferred commercial practices before finalizing the acquisition approach. ACQUISITION APPROACH UNDER EVALUATION Industry feedback will help refine potential agreement structure, project phasing, pricing approach, governance, risk allocation, and other commercial terms. Potential Phase 1 – Design and Preconstruction The Government and selected contractor would collaborate to refine project requirements, develop the design, conduct constructability reviews, identify long-lead equipment, evaluate phasing and operational constraints, obtain subcontractor input, develop cost estimates, and mitigate technical and execution risks. Feedback is requested on the design maturity, site investigations, pricing information, and agreement terms needed to establish a reliable construction cost and schedule baseline. Potential Phase 2 – Construction Following design development and resolution of key technical and commercial risks, the contractor may be asked to propose a construction price, potentially including a Guaranteed Maximum Price (GMP) if appropriate to the final structure. Any transition to construction would be subject to the terms of the resulting agreement, Government acceptance, availability of funds, and required approvals. The Government seeks practical recommendations for off-ramp provisions, design deliverables, compensation, and transition arrangements should the parties be unable to reach agreement on construction pricing or other required terms. Alternative acquisition strategies that industry believes would better support the program’s security, technical, schedule, cost, and operational requirements are welcome and encouraged. INDUSTRY DAY A Virtual Industry Day is to be determined. The SAM.gov posting will be updated with registration instructions and meeting information when available. Interested firms are strongly encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive timely updates, including Industry Day details. INFORMATION REQUESTED FROM INDUSTRY Your candid, detailed feedback is critical to shaping a successful acquisition. The Government’s primary mechanism for obtaining market research is the Industry Questionnaire, which addresses capability and capacity, relevant experience, Progressive Design-Build experience, open-book pricing, technical capabilities (ICD-705, CPS, secure facilities), real estate and construction considerations in the Republic of Korea, schedule, security, risk, governance, and recommended commercial practices. 1. Complete the Industry Questionnaire: Access the Questionnaire Here (https://forms.osi.apps.mil/Pages/ResponsePage.aspx?id=unZN_HzxUEy5p48xY9J1gkOXdBFTSSpJlGbZL6EFB8NUN1FSQ0pXMEE3TU05UzlUQ09QNjNMSjNTTyQlQCN0PWcu) or complete the questionnaire attached. 2. Submit a Capability Statement (not to exceed 12 pages). Include: Company name and address, CAGE code and/or Unique Entity Identifier (UEI) from your SAM.gov registration. Clearly identify if you are a foreign firm, partner, or subsidiary located outside the United States. Business size status and any applicable socioeconomic categories under NAICS Code 236220 – Commercial and Institutional Building Construction (small business size standard: $45 million). Two completed projects of similar nature and complexity (examples: ICD-705 controlled spaces, collective protection system installation or modernization, secure facility conversion, complex HVAC/CPS upgrades in operational military facilities, or comparable high-security construction). For each project state whether you were Prime, Subcontractor, or partnering Architect-Engineer firm, and provide: start and end dates of construction, project cost, complexity of the work, and any significant challenges (e.g., coordination with multiple partners/agencies, operational constraints, climate, terrain, or host-nation requirements). The Government especially values recommendations on commercial practices, agreement terms, project phasing, risk sharing, open-book pricing approaches, governance structures, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. HOW TO RESPOND Interested firms should complete the Industry Questionnaire and submit any supplemental Capability Statement via email no later than 2:00 p.m. Korea Standard Time (KST), Tuesday, 17 November 2026. Primary Point of Contact(s): Eugene A. Gibbs | Eugene.A.Gibbs@usace.army.mil Mike M. Miyagi | Michael.M.Miyagi@usace.army.mil Email subject line: W912UM27S0TA1 / [Your Company Name] Response Add your firm to the Interested Vendors List on SAM.gov associated with this announcement to ensure you receive all future updates, including Industry Day registration details.
-Market Research11/17/2026

Additional Details

Solicitation Number

FA524022B0002

Archive Date

Oct 7, 2022

Place of Performance Country

USA

Office Address

APO, AP, 96543-4040