AJJY 23-2009 Repair War Reserve Materiel (WRM) Storage B51104

Archived on August 17, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC+10:00
Posted
September 12, 2023
Notice type
Solicitation
Set-aside
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA5240 36 CONS LGC
Place of performance
Yigo, GU, 96929
Last updated
Dec 6, 2025

Identifiers

Solicitation number
FA524023B0001
Notice ID
62f4b36f58c5437b9d615086eb3d1a27

Description

Project No. AJJY 23-2009, Andersen Air Force Base, Guam has a bid-build construction requirement to Construct Repairs on WRM Storage B51104. DESCRIPTION OF WORK: The contractor shall provide multiple repairs, which include demolition and construction for Repair of War Reserve Materiel (WRM) Storage Building 51104. Site Improvements include demolition of an existing mechanical enclosure and equipment pad. The work includes removing all existing Heating, Ventilation, and Air Conditioning (HVAC) system and other related equipment, as well as concrete in-fill of the existing openings on the roof and wall. Existing motorized roll-up doors will be replaced. Existing interior walls, ceilings and floor will be patched and repaired to receive new finish, including new striping. Electrical work includes power for motorized roll up doors, new HVAC system, and mechanical ventilation in accordance with all the applicable codes, guidance, policy to include but not limited to Unified Facilities Criterias and Andersen Air Force Base Architectural Compatibility and Base Design Standards (ACBDS). Tentative period of performance is 300 days. MAGNITUDE FAR 36.204: $1,000,000. and $5,000,000. LOCATION OF WORK: Andersen AFB, Guam PERIOD OF PERFORMANCE: 300 Calendar Days RESTRICTION TO SMALL BUSINESS: This acquisition is being competed as a Historically Underutilized Business Zone (HUBZone) Small Business set-aside. The applicable North American Industry Classification System (NAICS) code for this acquisition is 236220 Commercial and Institutional Building Construction with a small business size standard of $45 million. CONTRACT TYPE: Firm-Fixed Price (FFP) SITE VISIT: 25 Aug 2023 at 0930 ChST (See Attachment 5) REQUEST FOR INFORMATION: Any Requests for Information (RFIs) regarding this solicitation are due on or before 05 September 2023 at 2:00pm hours ChST and shall be submitted electronically via email to the notice POCs. The Government does not intend to respond to inquiries submitted after this deadline. All questions will be answered via Q&A format and amended into the solicitation. It is the offeror's responsibility to monitor SAM.gov for any amendments or changes. Subject line for all correspondence shall contain FA524023B0001, Construct Repairs on War Repair Materiel (WRM) Storage Building 51104. BID SUBMISSION: Bids shall be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) at the link below. See Section L and the Proposal Manager Instructions (Attachment 7). NOTICE TO OFFERORS: The Government reserves the right to cancel this solicitation, either before or after closing of receipt of bids. https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=FA524023B0001 (End of SAM Solicitation Posting) CONTACTS: Ms. June G. Borja; june.borja@us.af.mil SSgt. Shawndae E. Wilkins; shawndae.wilkins@us.af.mil Ms. Katrina J. Pangelinan; Email: katrina.pangelinan@us.af.mil

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:FA524023B0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJul 24, 2023

    AJJY23-2009 Repair WRM Storage Bldg B51104

    Notice 2ab5d713ea574461859e5d1c398123a5 on SAM.gov

  2. 4×
    SolicitationCurrentAug 18, 2023

    AJJY 23-2009 Repair War Reserve Materiel (WRM) Storage B51104

    Notice 62f4b36f58c5437b9d615086eb3d1a27 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is an Indefinite Deliver, Indefinite Quantity contract for construction efforts at Hill AFB, UT (Davis County); the Carter Creek Recreational Property at Evanston WY; Utah Test and Training Range (UTTR); Little Mountain Test Annex, UT. NV Boulder Seismic Site, WY. Each construction project will be awarded by individual task order) TO) issued against the basic contract and specifying work in support of real property maintenance, repair, alteration, and new construction.
-Solicitation11/16/2026
This is a follow-on Multiple Award Construction Contract (MACC) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for design-build, design-bid-build, and Progressive Design Build (PDB) construction projects, which are specific to WPAFB, and applicable to individual Task Orders. Work will consist of a broad range of maintenance, repair, alteration and/or new construction work on various real property. Type of work the contractor can expect (not inclusive): new construction of buildings and structures; alteration and repair of buildings, structures, roads, airfields, ground, roofs; specialty construction; utilities; and miscellaneous services including remediation/hazardous waste removal (i.e. asbestos, lead paint etc.). Contractor efforts may also include design/build from concept to 100% design. Amendment 0001 incorporates the most recent round of Requests for Information (RFIs) and updates Attachments 1, 2, 3, 5, 8, 9, 10. Attachment 4 is removed from the solicitation. Remaining open and unanswered RFIs will be addressed in another amendment to the solicitation.
-Solicitation12/11/2026
FA8501-27-RAPID-CIRCUIT F1-170129-OTA Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129 Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia. The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks. Project Background and Existing Conditions Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations. The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties. Project Areas Phase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open-book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO. Phase 2 (Final Design & Construction Execution) Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO. Project-Specific Objectives and Phasing Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas. OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. § 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page. Email is the official form of submission for responses. Surety letters may be attached without counting towards 5 page limit. Page format should be 8.5 x 11. The Solution Brief shall include: Cover Page Company name UEI Mailing address Primary point of contact Email address and telephone number Identification of this RAPID AOI Executive Summary, Team Composition, and Organization Summary of the respondent’s qualifications and anticipated delivery capability Explanation of why the team is qualified for the anticipated requirement The team’s understanding of the Robins Air Force Base operational environment The team’s experience working in occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards. (e.g., hazardous material abatement, and experience with Department of War/Air Force Standards). The team’s proposed approach to Phase 1 collaboration and risk reduction Identification of any material capability, staffing, access, bonding, or teaming assumptions. Past Relevant Construction Capability and Experience Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, adhering to environmental and safety standards.(e.g., hazardous material abatement, and experience with Department of Defense/Air Force Standards). Note that while DoD experience is considered, it will not be a deciding factor in determining a firm more qualified. Financial Capacity and Bonding A statement of financial capacity to perform the anticipated work Current single-project and aggregate bonding capacity, if bonds are anticipated; Name of surety Any other information necessary to demonstrate capacity to perform the anticipated project. Construction Execution and Phasing Approach Methodology for physical work execution Utility outage coordination Evaluation & Selection Criteria The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based on qualifications, experience, and collaborative capabilities. Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications Evaluation Factors Factor 1: Past Relevant Experience Minimum Requirement: The Design-Builder (and/or key teaming partner) must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force Standards). Note: while DoW experience is considered, it will not be a deciding factor in determining a firm more qualified. Factor 2: Team Composition and Organization Focus: The government will evaluate the proposed organization structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project managers ability to oversee operations and coordinate with the Government daily. Factor 3: Project Approach and Understanding Focus: The Government will assess the firm’s understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design and Preconstruction) and Phase 2 (Final Design & Construction). This includes the firm’s strategy for open-book estimating, schedule development, and manage site-specific constraints at Robins AFB (e.g. restricted area access, flightline requirements, and utility outage coordination). Step 2: Pitch Presentation and Price Evaluation (Final Down-Select) The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Collaborative Capability and Cultural Fit Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders. Factor 2: Real-Time Problem-Solving and Risk Management Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on response to real-time scenarios presented during the Q&A. Factor 3: Innovative Design-Build Solutions Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government’s mission objectives. Factor 4: Financial Capacity and Bonding Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement. Final Selection and Award Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder. The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: Invite, not invite, or limit respondents advancing to later phases; Conduct technical exchanges; Request clarifications or supplemental information; Negotiate with one or more respondents; Modify, suspend, or cancel this Special Notice; Issue additional notices or requests; and Make no award. Attachments UHHZ170129 - 01005 - SOO - PDB with OTHER TRANSACTIONAL AUTHORITY F1 Binder UHHZ170129 REV 22-02 base power grid F1 REV 22-02 base power grid 0111 REV 22-02 base power grid-Model F1 compact Send all submissions to: angela.whitley@us.af.mil and kristen.denlinger@us.af.mil Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization; While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project.
-Special Notice11/20/2026
SUBJECT: — Robins Agile Practices for Infrastructure Development (RAPID) Umbrella Program Notice (10 U.S.C. § 2808a Other Transaction Authority) 1. BOTTOM LINE UP FRONT (BLUF) The Department of the Air Force, specifically the 78th Civil Engineer Group (78 CEG) at Robins Air Force Base (AFB), Georgia, is publishing this Umbrella Program Notice to announce the establishment of the Robins Agile Practices for Infrastructure Development (RAPID) acquisition framework. Operating under the innovative statutory authority of 10 U.S.C. § 2808a, RAPID seeks to completely modernize base infrastructure and execute facility repair and construction projects using flexible, commercial-style Other Transaction Agreements (OTAs). Traditional Federal Acquisition Regulation (FAR) rules do not apply, enabling the Air Force to engage directly with local, regional, and national commercial builders who have limited or no prior federal contracting experience. 2. PROGRAM STRUCTURE & TIMELINE Rather than a single, one-off project solicitation, this Notice establishes the RAPID Umbrella Program, which will remain active for one (1) full year from the date of this posting. During this 12-month period, the Government will periodically publish project-specific solicitations, referred to as Areas of Interest (AOIs), directly under this umbrella. Each independent AOI will outline: The specific facility construction, repair, or modernization project requirements. The exact response date, time, and instructions for submitting Solution Briefs. The collaborative delivery model designated for that project, such as Progressive Design-Build (PDB) utilizing open-book Guaranteed Maximum Price (GMP) pricing, or Build-Only (BO) commercial delivery. Program ParameterDetailsStatutory Authority10 U.S.C. § 2808a (Standalone Facility Construction or Repair Authority)Umbrella Active Period12 Months (Continuous Open Notice)Execution VehicleProject-Specific Areas of Interest (AOIs) & Other Transaction Agreements (OTAs)Key FlexibilitiesNo FAR boilerplate clauses, standard commercial accounting (No CAS), negotiable termsFollow-on AuthorityEligible for non-competitive, sole-source follow-on production construction under § 2808a(c) 3. ELIGIBILITY & PARTICIPATION The RAPID framework actively seeks to lower barriers to entry. Unlike prototype OTAs, 10 U.S.C. § 2808a carries no statutory Nontraditional Defense Contractor (NDC) prerequisites and zero cost-share mandates. Commercial general contractors, specialty trades, design-build firms, and joint ventures are all fully eligible and strongly encouraged to monitor this notice and participate. 4. ACTION REQUIRED FOR INTERESTED VENDORS Interested commercial builders and designers should take the following immediate steps to prepare for upcoming RAPID projects: Monitor This Posting: Bookmark this SAM.gov notice. All project-specific AOIs will be posted as amendments or linked notices here. Register on SAM.gov: Ensure your company has an active, completely free registration and Unique Entity ID (UEI) on SAM.gov. Form Teaming Alliances: Begin networking with regional design firms, general contractors, and trade subcontractors to build integrated design-build consortia capable of executing rapid, commercial-style projects.
-Market Research12/01/2027
SUBJECT: — Robins Agile Practices for Infrastructure Development (RAPID) Umbrella Program Notice (10 U.S.C. § 2808a Other Transaction Authority) 1. BOTTOM LINE UP FRONT (BLUF) The Department of the Air Force, specifically the 78th Civil Engineer Group (78 CEG) at Robins Air Force Base (AFB), Georgia, is publishing this Umbrella Program Notice to announce the establishment of the Robins Agile Practices for Infrastructure Development (RAPID) acquisition framework. Operating under the innovative statutory authority of 10 U.S.C. § 2808a, RAPID seeks to completely modernize base infrastructure and execute facility repair and construction projects using flexible, commercial-style Other Transaction Agreements (OTAs). Traditional Federal Acquisition Regulation (FAR) rules do not apply, enabling the Air Force to engage directly with local, regional, and national commercial builders who have limited or no prior federal contracting experience. 2. PROGRAM STRUCTURE & TIMELINE Rather than a single, one-off project solicitation, this Notice establishes the RAPID Umbrella Program, which will remain active for one (1) full year from the date of this posting. During this 12-month period, the Government will periodically publish project-specific solicitations, referred to as Areas of Interest (AOIs), directly under this umbrella. Each independent AOI will outline: The specific facility construction, repair, or modernization project requirements. The exact response date, time, and instructions for submitting Solution Briefs. The collaborative delivery model designated for that project, such as Progressive Design-Build (PDB) utilizing open-book Guaranteed Maximum Price (GMP) pricing, or Build-Only (BO) commercial delivery. Program ParameterDetailsStatutory Authority10 U.S.C. § 2808a (Standalone Facility Construction or Repair Authority)Umbrella Active Period12 Months (Continuous Open Notice)Execution VehicleProject-Specific Areas of Interest (AOIs) & Other Transaction Agreements (OTAs)Key FlexibilitiesNo FAR boilerplate clauses, standard commercial accounting (No CAS), negotiable termsFollow-on AuthorityEligible for non-competitive, sole-source follow-on production construction under § 2808a(c) 3. ELIGIBILITY & PARTICIPATION The RAPID framework actively seeks to lower barriers to entry. Unlike prototype OTAs, 10 U.S.C. § 2808a carries no statutory Nontraditional Defense Contractor (NDC) prerequisites and zero cost-share mandates. Commercial general contractors, specialty trades, design-build firms, and joint ventures are all fully eligible and strongly encouraged to monitor this notice and participate. 4. ACTION REQUIRED FOR INTERESTED VENDORS Interested commercial builders and designers should take the following immediate steps to prepare for upcoming RAPID projects: Monitor This Posting: Bookmark this SAM.gov notice. All project-specific AOIs will be posted as amendments or linked notices here. Register on SAM.gov: Ensure your company has an active, completely free registration and Unique Entity ID (UEI) on SAM.gov. Form Teaming Alliances: Begin networking with regional design firms, general contractors, and trade subcontractors to build integrated design-build consortia capable of executing rapid, commercial-style projects.
-Special Notice09/16/2027

Additional Details

Solicitation Number

FA524023B0001

Archive Date

Aug 17, 2024

Office Address

APO, AP, 96543-4040