Closed Loop Wash Rack System
Archived on March 13, 2026. Original response deadline: . Full description on SAM.gov.
Description
• Item Description – Portable Wash Rack
o Must include on and off ramp
o Must include pull through capabilities - entry/exit doors on opposite ends so that the vehicle can pass through the wash rack after washing
o Must be wind rated to withstand winds up to 25m/s
o Must have inputs for water
o Must catch and separate oil and water i.e. have a oil-water sperator
o Needs to be 240/415V
o 50 hertz
o Must be at least 10 feet in width
o Must be rated to support 16,000 lbs
o Must be portable
o Must be delivered to W62G2T
W1 AS DLA DIST SAN JOAQUIN
25600 S CHRISMAN ROAD, REC WHSE 57
TRACY, CA 95304-5000
o Will require installation at Al Udeid Air Base to include site prep, utility hookup, and testing
QTY - 1
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Showing 4 of 4 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Feb 20, 2026 | 114.4 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Feb 20, 2026 | 125.04 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Feb 20, 2026 | 113.36 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Feb 20, 2026 | 17.98 KB |
Lifecycle
FA570226DM0001- Combined Synopsis
- 2×Combined SynopsisCurrentFeb 19, 2026
Closed Loop Wash Rack System
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
FA570226DM0001
Archive Date
Mar 13, 2026
Place of Performance Country
QATAR
Office Address
APO, AE, 09309-0000