GovChime
AwardedArchived

Remanufacture of T-38 Defog Flow Selector

Awarded tounder FA8118-26-D-0036 (source: SAM.gov award notice)• $177.3K

Overview

Posted
June 16, 2026
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8118 AFSC PZABB
Last updated
Oct 29, 2026
First published
Last updated on SAM.gov
Award date
Jun 15, 2026
Award amount (SAM.gov award notice)
$177.3K

Identifiers

Solicitation number
FA8118-26-R-0020
Notice ID
e71c0323fbed4402942c5a7fed47ab30
Award number (PIID)
FA8118-26-D-0036

Description

PLEASE NOTE: Attached Amendment P00001 extends due date to 3-31-2026 at 1:00pm CST. 

REMANUFACTURE

A 5-YEAR ( 3-YEAR BASIC AND ONE 2-YEAR OPTION PERIOD) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.

NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1).  
52.232-18 Availability of Funds.  As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.  (End of clause)
(a)  A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required.  Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.

(b)  The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition.  The contractor shall also accomplish ALL necessary packing and preservation and packaging.  ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price.  The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
 
(c)  Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009.  Email: afsc.sb.workflow@us.af.mil  Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/.  DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE.

429SCMS.SASPO.Workflow@us.af.mil

For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/

As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.

(d)  In order to receive any technical data related to this acquisition, offerors must send an email request to dessie.breslin@us.af.mil AND amy.gil@us.af.mil .   Release of any data is subject to applicable data rights.  The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345.  The form, including instructions for completing the form, is available at:  http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html.  The Government is not responsible for incomplete, misdirected, or untimely requests.**

In order to receive drawings (previously done through JEDMICS), contractors will need to request access to the A-Team via a DD Form 2875. Requests will be made to wralc.tila.centra@us.af.mil .  The PCO listed above will be the government sponsor for the DD Form 2875.

(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).

(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further on any such items except after receipt of approval from the direction of the procurement contracting officer (PCO). Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the PCO.

Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.

(h) Condemned units shall not be counted as production.

(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.

(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.  The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.

(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.

(l)  Dates listed in clauses 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.

(m) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.

(n) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility.  DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a plan with their proposal to become compliant.
 

Full description on SAM.gov

Award Overview

Award Number

FA8118-26-D-0036

Award Amount (SAM.gov award notice)

$177.3K

Award Date

Jun 15, 2026

Awardee

Awardee UEI

U8ZKGNNR4YR8

Awardee CAGE Code

58078

Awardee Address

Tucson, AZ 85710, UNITED STATES

Original Solicitation

Notice ID: e71c0323fbed4402942c5a7fed47ab30

Posted Date: Jun 16, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • FA811822D0025
    AIRTRONICS, LLC
    Department of DefenseNAICS 336413
    —Signed Aug 21, 2026
  • FA811825F0204
    AIRTRONICS, LLC
    Department of DefenseNAICS 336413
    $132.7KSigned Aug 21, 2026
  • SPE4A625PV153
    AIRTRONICS, LLC
    Department of DefenseNAICS 336413
    $140.0KSigned Aug 19, 2026
  • FA811826D0038
    AIRTRONICS, LLC
    Department of DefenseNAICS 336413
    —Signed Aug 11, 2026
  • W58RGZ25F0217
    AIRTRONICS, LLC
    Department of DefenseNAICS 336413
    $104.0KSigned Aug 11, 2026

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (12)

  • FA8118-26-R-0020 P00001 Extension.pdf

    601 KBAdded in Solicitation version 6Posted
    Download
  • DID 80503 Shipping and Packaging Discrepancy.pdf

    278 KBAdded in Solicitation version 2Posted
    Download
  • SOW.pdf

    940 KBAdded in Solicitation version 2Posted
    Download
  • DID 80969 Surge Plan.pdf

    157 KBAdded in Solicitation version 2Posted
    Download
  • DID 80441D Govt Property Inventory Report.pdf

    149 KBAdded in Solicitation version 2Posted
    Download
  • DID 81995A CDM Monthly Report.pdf

    193 KBAdded in Solicitation version 2Posted
    Download
  • CDRL.pdf

    116 KBAdded in Solicitation version 2Posted
    Download
  • Item Description_Redacted.pdf

    61 KBAdded in Solicitation version 2Posted
    Download
  • Transportation Data.pdf

    88 KBAdded in Solicitation version 2Posted
    Download
  • Packaging Requirements.pdf

    72 KBAdded in Solicitation version 2Posted
    Download
  • DID 81838 CAV Reporting.pdf

    30 KBAdded in Solicitation version 2Posted
    Download
  • FA8118-26-R-0020.pdf

    27 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Remanufacture of T-38 Defog Flow Selector

    Notice 8b1c6667c0794ed4a8aa525896f2f824 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Remanufacture of T-38 Defog Flow Selector

    Notice e71c0323fbed4402942c5a7fed47ab30 on SAM.gov

Other notices for this solicitation

  1. SolicitationRelated noticeFeb 2, 2026

    Remanufacture of T-38 Defog Flow Selector

    Notice 1431b0916ef04dfeadfd70607377635c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

FA8118-26-R-0020

Archive Date

Jun 30, 2026

Office Address

TINKER AFB, OK, 73145-3303