Remanufacture B-1 Horizontal Stabilizer Servo-Cylinder
Archived on April 2, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM CDT
- Posted
- February 18, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8118 AFSC PZABB
- PSC
- 1650: AIRCRAFT HYDRAULIC, VACUUM, AND DE-ICING SYSTEM COMPONENTS
- Last updated
- Nov 3, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA811825R0084
- Notice ID
- 17666fddfa6e4a27baefd036a92f848c
Description
NOTE: AMENDMENT 0002 - EXTENDS CLOSE DATE TO 3/18/26 AT 1:00PM CST.
NOTE: AMENDMENT 0001 - EXTENDS CLOSE DATE TO 2/18/26 AT 1:00PM CST.
REMANUFACTURE
A 5-YEAR FIRM-FIXED PRICE REQUIREMENTS CONTRACT IS CONTEMPLATED.
NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1).
52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (End of clause)
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009. Email: afsc.sb.workflow@us.af.mil Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/. DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE.
429SCMS.SASPO.Workflow@us.af.mil
For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Breslin at dessie.breslin@us.af.mil AND Amy Gil at amy.gil@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.**
In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link.
(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further on any such items except after receipt of approval from the direction of the procurement contracting officer (PCO). Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the PCO.
Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.
(h) Condemned units shall not be counted as production.
(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.
(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.
(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.
(l) Dates listed in clauses 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.
(m) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond economical repair of limits specified in the Work Specification and/or Technical Orders. All cost for work performed by the contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(n) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.
(o) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a plan with their proposal to become compliant.
Award Overview
No prior contract identified
No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (24)
- Download
Amendment 0002.pdf
467 KBAdded in Solicitation version 4Posted - Download
Amendment 0001.pdf
467 KBAdded in Solicitation version 2Posted - Download
FA811825R0084.pdf
8.5 MBAdded in Solicitation version 1Posted - Download
DI MGMT 80503 Report of Shipping Packaging Discrepancy.pdf
278 KBAdded in Solicitation version 1Posted - Download
Transportation Data Report.pdf
92 KBAdded in Solicitation version 1Posted - Download
Special Packaging Instructions _1787.pdf
180 KBAdded in Solicitation version 1Posted - Download
IUID_1788_Redacted.pdf
62 KBAdded in Solicitation version 1Posted - Download
ItemDescription_1788_Redacted.pdf
59 KBAdded in Solicitation version 1Posted - Download
CAV AF Reporting Requirements.pdf
302 KBAdded in Solicitation version 1Posted - Download
DI MGMT CDM Montly Production Report.pdf
193 KBAdded in Solicitation version 1Posted - Download
DI MGMT Govt Property Inventory Report.pdf
149 KBAdded in Solicitation version 1Posted - Download
DI MGMT Production Surge Plan.pdf
157 KBAdded in Solicitation version 1Posted - Download
IUID_3024_Redacted.pdf
62 KBAdded in Solicitation version 1Posted - Download
ItemDescription_3024_Redacted.pdf
59 KBAdded in Solicitation version 1Posted - Download
IUID_4395_Redacted.pdf
62 KBAdded in Solicitation version 1Posted - Download
CDRL.pdf
116 KBAdded in Solicitation version 1Posted - Download
IUID_7848_Redacted.pdf
62 KBAdded in Solicitation version 1Posted - Download
ItemDescription_7848_Redacted.pdf
61 KBAdded in Solicitation version 1Posted - Download
JQRR.pdf
107 KBAdded in Solicitation version 1Posted - Download
Packaging Requirements.pdf
72 KBAdded in Solicitation version 1Posted - Download
ItemDescription_4395_Redacted.pdf
56 KBAdded in Solicitation version 1Posted - Download
SOW.pdf
1.1 MBAdded in Solicitation version 1Posted - Download
GFP.pdf
3.8 KBAdded in Solicitation version 1Posted - Download
DI_MGMT_CAV_Reporting.pdf
30 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Remanufacture B-1 Horizontal Stabilizer Servo-Cylinder
- 2Version 2SolicitationArchived
Remanufacture B-1 Horizontal Stabilizer Servo-Cylinder
- 4Version 4SolicitationArchivedCurrent
Remanufacture B-1 Horizontal Stabilizer Servo-Cylinder
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Additional Details
Solicitation Number
FA811825R0084
Archive Date
Apr 2, 2026
Office Address
TINKER AFB, OK, 73145-3303