Notice ID: ab04820badc8424f9062644e600f0b7cSolicitation
Metallic Seal NSN 2840003438336NZ
Archived on July 18, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−05:00
- Posted
- June 6, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 336412: Aircraft Engine and Engine Parts Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA8121 AFSC PZAAA
- Place of performance
- Tinker AFB, 73145
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- FA812124R0022
- Notice ID
- ab04820badc8424f9062644e600f0b7c
Description
6/6/2024: Solication Amendment to remove "Serial Number Requirement" from Physical Item Markings on Item 0001. PR Number: FD20302400181 - New Manufacture of Seal, Metallic, Aircraft NSN 284003438336NZ P/N 4032669 The United States Air Foce through the Air Force Sustainment Center (AFSC) at the Oklahoma City Logistics Center (OC-ALC) is soliciting for a one-time spares buy for the Seal, Metallic Aircraft. This is a TOTAL SMALL BUSINESS SET ASIDE. Proposals will be accepted on before the closing date of 3 JUL 2024, 12:00 PM CDT. First Article Requirements/Special Production Facilities: The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered. Qualification Requirements: Sources must be qualified prior to being considered for award. To be eligible for contract award, the offeror must be an approved source IAW FAR 52.209-1, Qualification Requirements. The Government is not required to delay contract award to review prnding Source Approval Requests (SARs). Therefore offerors are encouraged to submit SARs as soon as possible. If the Government has not completed review of a SAR when the contract is awarded, the SAR will be retained and the source will be reviewed as a possible source for future awards. For questions regarding the Tinker SAR process or related issues, these inquiries should be submitted to the AFSC Small Business Office at: AFSC/SB 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK, 73145-3009. Email: afsc.sb.workflow@us.af.mil or https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE https://safe.apps.mil/. DoD Safe is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the POC email addresses below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the POC email addresses below and ask that they “Request a Drop-Off” to your email address via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE. Email: 29SCMS.SASPO.Workflow@us.af.mil and stacy.cochran@us.af.mil. Requests for technical data in response to this solicitation should be submitted to the Tinker TO Public Sales Office at AFLCMC.ezgtp.PubSale@us.af.mil along with a justification letter identifying specific drawing(s) and specification(s) on company letterhear and an approved DD Form 2345. See attachments for detailed additional solicitation information. Previous Awards: FA812124P0008, awarded 5 Apr 2024 FA812122C0009, awarded 19 Jul 2022 FA812118F0227, awarded 18 Sep 2018
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
FA812124R0022- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentJun 3, 2024
Metallic Seal NSN 2840003438336NZ
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The US Air Force Life Cycle Management Center (AFLCMC) F100 Program intends to issue a sole source “C”-type contract (named F100 Engine Exchange) to Pratt & Whitney (P&W), a Division of RTX Corporation for a “no-cost” exchange of property whereby the Government will deliver 51 F100-PW-220 engines to the Contractor, in exchange for the Contractor delivering 13 F100-229 new engine augmentor modules to the Government. A Sources Sought Synopsis (SSS) FA8124-RFI-AUG-2026 was posted from 4 August 2026 through 3 September 2026. Results from the SSS did not indicate any source other than P&W could perform the work under this contract at the prime level without the government incurring unacceptable delays and substantial duplication of costs not recoverable through competition. The government is awarding this contract under the authority of RFO 6.103-1,"Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." A Justification and Approval (J&A) for using Other Than Full and Open Competition was approved on 23 October 2026. All responsible sources may submit a capability statement to the Contracting Officer by the date listed in this notice to be considered by the agency. Respondents shall specify status as a large business, small business, small disadvantaged business, 8(a) concern, women-owned small business, economically disadvantaged women-owned small business, HUBZone small business, veteran-owned small business, or service-disabled veteran-owned small business. This synopsis does not constitute an Invitation for Bids (IFB) or a Request for Proposals (RFP), nor does it restrict the Government to an ultimate acquisition approach. The government will not reimburse any costs associated with preparing or submitting a response to this notice. Due to security access requirements, foreign participation is not permitted at the prime contractor level. Contracting Activity: AFLCMC/LPK, 3001 Staff Dr, Tinker AFB, OK 73145. | - | Pre-Solicitation | 11/17/2026 |
Solicitation Amendment 03: The purpose of the amendment is to update CLIN 0011 (POST AWARD CONFERENCE) from NSP to FFP, establish it as the minimum order for the contract, and attach pricing matrix. Solicitation Amendment 02: The purpose of the amendment is to attach an updated Statement of Work (SOW) and update the CLIN structure for solicitation FA8122-26-R-0007. Solicitation Amendment 01: The purpose of the amendment is to correct National Stock Number (NSN) associated with LPT Stage I Blade subCLINs 0001AB – 4001AB (USAF) and 0002AB – 4002AB (Navy) and add Inspection/Acceptance and Quality Assurance information to subCLINs 0001AB – 4001AB (USAF). Solicitation Noun: F108 Module 13/15 & 14 LPT Assembly (USAF/USN) Remanufacture NSN: 2840-01-229-5786PN (13/15 USAF); 2840-01-484-3913PN (13/15 USN); 2840-01-189-2941PN (14 USAF); 2840-01-483-8785PN (14 USN) P/N: 305-482-301-0 (13/15 USAF); 305-482-301-0 (13/15 USN); 301-316-158- 0 (14 USAF); 301-316-158-0 (14 USN) This is a competitive acquisition to qualified sources. Please see attached. Mod 14 (USAF/USN): No. 4 Bearing is included in remanufacture. Two additional subCLINs have been added for Shaft and Stub Shaft replacement. Mod 13/15 (USAF/USN): SubCLIN has been added for Stage I Blades. 105 blades will be paid for each USAF module and 141 blades for each USN module. | - | Solicitation | 09/15/2026 |
NSN: 2840-01-625-7346NZ NOUN: SEAL, METALLIC, AIRCR TOP DRAWING: 4088961 EDL REVISION & DATE: 2 / 10 APR 2026 MDC CODE: WCF IM NAME: LOVELACE, BRENT S | - | Special Notice | 08/19/2027 |
NSN: 2840-01-445-4017NZ NOUN: SEAL, AIR, AIRCRAFT G TOP DRAWING: 4083716-01 EDL REVISION & DATE: 8 / 19 MAR 2025 MDC CODE: W9J IM NAME: DOBBINS, MICHELLE E | - | Special Notice | 06/10/2027 |
NSN: 2840-01-357-1941PR NOUN: AUGMENTOR NOZZLE SE TOP DRAWING: 9538M95G05 EDL REVISION & DATE: 16 / 27 APR 2026 MDC CODE: AAJ IM NAME: ROACH, REBECCA L | - | Special Notice | 05/06/2027 |
Additional Details
Solicitation Number
FA812124R0022
Archive Date
Jul 18, 2024
Office Address
TINKER AFB, OK, 73145-3303