GovChime
Notice ID: 646efa6c93bd4fb683d7e2b3c3a91bccCombined Synopsis/Solicitation

X-Ray Producing System Maintenance

Archived on September 2, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
August 2, 2023
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA8132 AFSC PZIMC
Place of performance
Tinker AFB, OK, 73145
Last updated
Dec 4, 2025

Identifiers

Solicitation number
FA813223Q0036
Notice ID
646efa6c93bd4fb683d7e2b3c3a91bcc

Description

AWARD NOTICE: X-Ray Producing System Maintenance, Solicitation #FA813223Q0036 Technical Services Group, Inc. Snellville, GA FA813223P0036 Total Evaluated Price (TEP): $34,866.50 Award Amount: $150,717.24 PREVENTIVE AND REMEDIAL MAINTENANCE FOR X-RAY PRODUCING SYSTEM *AMENDMENT 4: Any reference to International Fluid Power Society (IFPS) Certifications has been removed. This is NOT a requirement for this solicitation. The due date for quotes has been extended to 26 Jun 2023 in the event any changes are needed for quotes already submitted. *AMENDMENT 3: The closing date for this Combined Synopsis Solictation has been extended to 23 Jun 2023 by 12:00PM (noon) CDT. *AMENDMENT 2: Mandatory clause 52.204-27, Prohibition on a ByteDance Covered Application, has been added to the solicitation. Please see the attached CSS Amendment 2 for full details. *AMENDMENT 1: Questions and Answers below; Correction to Section C., Capability and Experience Document, in the CSS in response to Question 2(please see attached CSS, Amd 1) * QUESTIONS AND ANSWERS 1. Question: The required training listed under section 1.50 PWS. How many hours of training is this? Answer: The training listed under PWS 1.50 is given by the Contracting Officers Representative (COR), and can be accomplished in approximately 1 hour. 2. Question: Inf the RFQ it has the following: C. Capability and Experience Document the Offeror will provide the Government with information about their experience performing the same or similar type of work on an IFPS-certified Level 3 industrial hydraulic systems within the last 5 years. Information should include, but is not limited to: i. The ability to obtain and provide employees with International Fluid Power Society (IFPS) Certification commensurate to the size and complexity of this system (see the attached Performance Work Statement or PWS para. 1.3.2 for details). The above credential has nothing to do with maintaining Xray systems, is this a mistake? Also section 1.3.2 doesnt exist in the PWS. Answer: This was an error on my part. Please see the CSS, Amendment 1 for the correct information. 3. Question: The statement for RM (Rate must be a fully-burdened labor rate). Does that mean travel to and from is included in the hourly rate? Answer: No travel is not included. Fully Burdened Hourly Labor Rate means an hourly rate that includes all salary, overhead costs, general and administrative expenses, and profit. Its the total cost to a company for hiring and maintaining an employee. The fully burdened labor rate is higher than the basic labor rate because it includes that employees portion of overhead, etc. ***See attached Combined Synopsis Solicitation, Performance Work Statement, Equipment List, Wage Determination and Quote sheet for more details.***

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:FA813223Q0036
  1. Combined Synopsis
  1. 7×
    Combined SynopsisCurrentMay 19, 2023

    X-Ray Producing System Maintenance

    Notice 646efa6c93bd4fb683d7e2b3c3a91bcc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

FA813223Q0036

Archive Date

Sep 2, 2023

Office Address

TINKER AFB, OK, 73145-3303