Multiple Award Construction (MAC) Basic Ordering Agreement (BOA) 2026 Annual Synopsis
Archived on May 30, 2026. Original response deadline: . Full description on SAM.gov.
Description
UPDATE 4:
RFI round 2 responses are attached.
UPDATE 3:
This solicitation has not been amended. RFI responses should clarify all questions regarding the posted solicitation.
The Government will allow additional RFIs due no later than 1700 on 8 January 2026.
All RFIs received by the initial cut off are included in this posting.
Tinker AFB Standards (Electrical, Mechanical, and Facility) are included in this posting.
UPDATE 2:
The government reserves the right to establish a second round of RFIs after the Pre-BOA teleconference.
___________________________________________________________________________________________
UPDATE 1:
A Pre-BOA teleconference will be conducted on January 6, 2026 at 1300. Please register with Mrs. Sara Hinds at sara.hinds.2@us.af.mil by noon on January 5th if you will be attending. A TEAMS meeting link will be sent to you.
______________________________________________________________________________________________________
NOTICE OF INTENT/ANNUAL REQUIREMENTS SYNOPSIS
COMPETITIVE MULTIPLE AWARD CONSTRUCTION BASIC ORDERING AGREEMENT (BOA) (MACB)
This notice is for the Tinker Air Force Base (TAFB) Multiple Award Construction Basic Ordering Agreement (BOA) Program to provide a broad range of construction, repair, and maintenance of real property. The BOA program will include: 35% Design-Build, 100% Design-Build and Construction Only services at TAFB, OK.
This competitive acquisition approach will set-aside, for small businesses, Order Proposal Requests (OPRs) with a magnitude of construction less than or equal to $25M and on a full and open basis for OPR(s) with a magnitude of construction more than $25M. The North American Industry Classification System (NAICS) Code is 23621q0 Industrial Building Construction with corresponding annual size standard of $45,000,000.
As Identified in the BOA Source Sought Synopsis, the TAFB will procure all BOA requirements utilizing a phased procurement process outlined below:
Phase One- Competition for BOA Holders: Basic Ordering Agreement Invitation will be released at least once a year to allow interested contractors an opportunity to submit a proposal for evaluation to obtain an executed BOA. The Government will execute no-cost BOAs to offerors who are deemed responsible in accordance with (IAW) the FAR Part 9, as supplemented, whose proposal conforms to the BOA Invitation requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Instructions to Offerors and is assessed based on the evaluation factors and subfactors to be responsive, responsible, and qualified to the Government. The Government seeks to issue BOAs to offerors that gives the Air Force the greatest confidence they will best meet the requirements.
The BOAs will be valid for a period of up to five (5) years beginning from the effective date of the initial BOA execution. An annual synopsis for requirements falling under the scope of the MACB program will be released in sam.gov. The annual synopsis covers requirements related to Construction Services that are within the scope of, and designated for, the MACB program and that emerge within the year after the annual synopsis is published. The Government will not conduct a separate BOA synopsis for any such emergent requirement prior to issuing the applicable competitive OPR(s)
Phase Two- Competitive Requirement/Order Process within BOA Holder Pool: The Procuring Contracting Officer (PCO) will issue competitive OPRs for specific requirements falling under the scope of the MACB program. An offeror must be a qualified BOA holder as of the closing date of an OPR. The Government will confirm that an offeror is a qualified BOA holder by checking the effective date of an offerors BOA. All OPR(s) will result in order contracts. NOTE: The annual BOA Invitation may be the only opportunity contractors will have to obtain an executed BOA in order to propose on OPRs issued within the year; additional BOA proposals may not be solicited, accepted, and may not be executed, at any time other than during the annual BOA RFP, even for those emergent requirements not specifically identified in the annual synopsis. Therefore, if a contractor desires to participate in ANY future BOA OPR that may arise within the year, it is imperative that the contractor submit a proposal in response to the annual BOA Invitation.
A one-time Pre-BOA Invitation Conference teleconference will be conducted at Tinker AFB, OK. The exact date, time, and location of the Pre-BOA Invitation Conference will be provided on this post at a later date. Registration will be necessary, and all required information and details will be detailed here on sam.gov. Further, a formal BOA Invitation with supporting documents will be posted following to the pre-solicitation conference, thereby providing offerors the opportunity to thoroughly review and understand the requirement prior to proposal submission.
IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly recommended to review their information in SAM to validate that it is current and up to date. Failure to register in SAM makes an offeror ineligible for BOA Issuance and award of DoD contracts IAW FAR 4.1102 registered in SAM database (http://www.sam.gov/).
DISCLAIMER: The information being requested does not constitute a commitment on the part of the government to award a contract, nor to pay for any costs incurred as a result in replying to this notice. This notice should not be construed as a commitment by the government for any purpose.
Prospective contractor responses shall include the three attachments below completed in their entirety. All attachments are required by the 1300 CST 15 January 2026.
Attachment 1: Experience Matrix
Attachment 2: MACB Provision and Clause Matrix
Attachment 3: Section A_ Executive Summary
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 10 of 11 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 33.76 KB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 1.24 MB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 17.96 KB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 301.57 KB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 1.54 MB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 311.43 KB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 559.03 KB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 5.83 MB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 1.28 MB | |||
| Solicitation | DEPT OF THE AIR FORCE | Jan 12, 2026 | 24.31 KB |
Showing 1 to 10 of 11 results
Lifecycle
FA813726R0004- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 7×SolicitationCurrentDec 12, 2025
Multiple Award Construction (MAC) Basic Ordering Agreement (BOA) 2026 Annual Synopsis
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
October 7, 2026 The government is still working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 28 October, 2026, while the government finalizes documents. September 23, 2026 The government is sitll working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents. September 16, 2026 Complete RFI responses posted. Followup questions related to these RFIs can be submitted by September 21 at noon CST. The government is not accepting new questions. Any question submitted must be tied to an answer provided in the attachment. The proposal due date will remain unchanged but the government will continue to monitor the need to extend. September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible. September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose. | Solicitation | 236210 | Partial Small Business Set-Aside | 10/07/2026 | 10/28/2026 | 0, OK | |
September 23, 2026 The government is sitll working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents. September 16, 2026 Complete RFI responses posted. Followup questions related to these RFIs can be submitted by September 21 at noon CST. The government is not accepting new questions. Any question submitted must be tied to an answer provided in the attachment. The proposal due date will remain unchanged but the government will continue to monitor the need to extend. September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible. September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose. | Solicitation | 236210 | Partial Small Business Set-Aside | 09/23/2026 | 10/13/2026 | 0, OK | |
September 16, 2026 Complete RFI responses posted. Followup questions related to these RFIs can be submitted by September 21 at noon CST. The government is not accepting new questions. Any question submitted must be tied to an answer provided in the attachment. The proposal due date will remain unchanged but the government will continue to monitor the need to extend. September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible. September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose. | Solicitation | 236210 | Partial Small Business Set-Aside | 09/16/2026 | 09/25/2026 | 0, OK | |
September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible. September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose. | Solicitation | 236210 | Partial Small Business Set-Aside | 09/10/2026 | 09/25/2026 | 0, OK | |
September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose. | Solicitation | 236210 | Partial Small Business Set-Aside | 09/03/2026 | 09/25/2026 | 0, OK |
Additional Details
Solicitation Number
FA813726R0004
Archive Date
May 30, 2026
Office Address
TINKER AFB, OK, 73145-9125