GovChime
Notice ID: f1e4d5f9b54e44e084e426eaed84a2deCombined Synopsis/SolicitationArchived

TINKER AFB MAC BOA WWYK190099 INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE B3708

Archived on May 1, 2026. Original response deadline: . Full description on SAM.gov.

Description

***** THIS PROJECT IS CANCELED *****

No responses required from MAC BOA Holder GC's that attended site visit.

Only the MAC BOA Holder GCs that attended Site Visit on 15 April 2026 will be able to continue forward toward the award.

Updated 20 April 2026

Initial site visit sign in sheet attached.  Reminder that RFIs are due 21 April 2026.

Only the MAC BOA Holder GCs that attended Site Visit on 15FApril 2026 will be able to continue forward toward the award.

Only the MAC BOA Holder GCs that attended Site Visit on 15 April 2026 will be able to continue forward toward the award.

Updated 15 April 2026

Solicitation Rev1 is attached, proposals due 18 May 2026

Solicittion Section L & M are attached

Initial site visit sign in sheet attached.  Reminder that RFIs are due 21 April 2026.

As built drawings attached.

If a Prime MAC BOA GC is in need of any other documents to provide a proposal, please contact the CO.

Only the MAC BOA Holder GCs that attended Site Visit on 15FApril 2026 will be able to continue forward toward the award.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

Project Solicitation Number:  FA813726R0017

Project Title: WWYK190099 – INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE
Project Location: Tinker AFB - B3708

The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the replacement of the chilled water piping insulation in B3708 at Tinker Air Force Base (AFB), Oklahoma

The estimated project value is below $25M and is restricted to SB MAC BOA holders only.

Project specific documents are attached to this posting.

If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.

Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 3 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.   ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.

Initial Site Visit is currently set for 15 April 2026 at 0900 CT, we will meet at the North entrance for B3708.

You must attend the Initial Site Visit for the project to be considered eligible to propose.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Air Force
Office:AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8137 AFSC PZIOC
Posted:April 29, 2026
NAICS:236220: Commercial and Institutional Building Construction
Last Updated:Oct 28, 2026
PSC:Z1AA: MAINTENANCE OF OFFICE BUILDINGS
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Combined Synopsis/Solicitation
Place of Performance:S Coffeyville, Oklahoma, 73145

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 10 of 13 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 2026289.75 KB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 2026136.83 KB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 20261.5 MB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 2026335.13 KB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 2026622.39 KB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 20262.41 MB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 202627.15 KB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 20261.4 MB
1989-OrigConst.pdf
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 202640.6 MB
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEApr 29, 20264.61 MB

Showing 1 to 10 of 13 results

Lifecycle

Solicitation:FA813726R0017
  1. Combined Synopsis
  1. 5×
    Combined SynopsisCurrentApr 7, 2026

    TINKER AFB MAC BOA WWYK190099 INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE B3708

    Notice f1e4d5f9b54e44e084e426eaed84a2de on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

FA813726R0017

Archive Date

May 1, 2026

Office Address

TINKER AFB, OK, 73145-9125