TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
Archived on October 1, 2026. Original response deadline: . Full description on SAM.gov.
Description
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Updated 16 June 26
1) Amendment 3 issued. The purpose of this amendment is to reflect changes to the following line items: FIRST - The addition of "Construction" to the description of CLIN 0001. SECOND - The addition of "Design" to the description of CLIN 0002. THIRD - Except as provided herein, all terms and conditions of the document of the document remains unchanged and in full force and effect.
Please include signed solicitation and amendments with the proposal package.
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Updated 12 June 26
1) Amendment 2 issued to change the proposal due date from 4:00pm on 19 June 2026 to 2:00pm on 22 June 2026. Please include signed solicitation and amendments with the proposal package.
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Updated 9 June 26
1) Amendment 1 issued. The purpose of this amendment is to reflect the following: FIRST - Addition of RFO clause 52.228-1 Bid Guarantee. SECOND - Addition of government response to pre-bid RFIs to Section J; THIRD - Except as provided herein, all terms and conditions of the document remains unchanged and in full force and effect.
Please include signed solicitation and amendment with the proposal package.
2) Government response to Pre-Bid RFIs are attached.
3) Proposals are due Friday, June 19 at 1600CST (4:00p)
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Updated 4 May 26
1) RFIs are due Thursday, May 7 at 1600CST (4:00pm)
2) Sign in sheet has been added to attachments
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Project Solicitation Number: FA813726R0023
Project Title: WWYK230053 - Replace Vault and Fuel Tank, B3202
Project Location: Tinker AFB, B3202
IAW FAR 36.101-3 the magnitude of this project is between $1,000,000 and $5,000,000
IAW FAR 52.232-18 Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
The work to be performed under the terms of this contract consists of furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the installation of a new above-ground diesel tank inside B3202 at Tinker Air Force Base (AFB), Oklahoma (reference the project SOW and drawings for additional information).
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or accessing the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission sent to your email. In the email, please provide email addresses for Prime Contractors points of contact ONLY, to have a DoD Safe link sent to. Do not include any sub-contractor email addresses.
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received by noon on 27 April 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access.
After receipt of your RSVP and EAL if required, Initial Site Visit is set for Tuesday, 28 April, 2026 at 1300 (1:00pm) CST on Tinker AFB, B3202. Meeting location will be the fuel tank on the east side of B3202.
You must attend the initial Site Vist for the project to be considered eligible to propose.
Requests for Information (RFIs) are due Thursday, 7 May, 2026 @ 1600 (4:00pm)
Please submit your RSVP to Sara Hinds at "sara.hinds.2@us.af.mil" and Megan Donaghe at "megan.donaghe@us.af.mil."
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (19)
- Download
Solicitation Amendment FA813726R00230003 SF 30 Page 1 - fillable.pdf
367 KBAdded in Presolicitation version 5Posted - Download
Solicitation Amendment FA813726R00230003 SF 30.pdf
395 KBAdded in Presolicitation version 5Posted - Download
Solicitation Amendment FA813726R00230002 Page 1 - fillable.pdf
65 KBAdded in Presolicitation version 5Posted - Download
Solicitation Amendment FA813726R00230002 SF 30.pdf
387 KBAdded in Presolicitation version 5Posted - Download
Solicitation Amendment FA813726R00230001 Page 1 - fillable.pdf
256 KBAdded in Presolicitation version 5Posted - Download
Solicitation Amendment FA813726R00230001 SF 30.pdf
390 KBAdded in Presolicitation version 5Posted - Download
WWYK230053 Pre-Bid RFIs COR Signed.pdf
1.5 MBAdded in Presolicitation version 5Posted - Download
WWYK230053 Site Visit Sign In Sheet.pdf
133 KBAdded in Presolicitation version 5Posted - Download
Solicitation - FA813726R0023 Pgs 1-4 - fillable.pdf
557 KBAdded in Presolicitation version 5Posted - Download
Solicitation - FA813726R0023.pdf
772 KBAdded in Presolicitation version 5Posted - Download
Att10a_230053_RMDF.pdf
300 KBAdded in Presolicitation version 5Posted - Download
Att9_230053_Liquidated Damages Spreadsheet.pdf
102 KBAdded in Presolicitation version 5Posted - Download
Wage Determination.pdf
60 KBAdded in Presolicitation version 5Posted - Download
Att11_230053_Design Narrative.pdf
9.1 MBAdded in Presolicitation version 5Posted - Download
230053_Green Procurement Statement.pdf
188 KBAdded in Presolicitation version 5Posted - Download
230053_Ozone Depleting Statement.pdf
103 KBAdded in Presolicitation version 5Posted - Download
Att12_230053_Submittal_Register.pdf
174 KBAdded in Presolicitation version 5Posted - Download
Att13_230053 Drawings.pdf
5.0 MBAdded in Presolicitation version 5Posted - Download
Att10_230053_STATEMENT OF WORK.pdf
302 KBAdded in Presolicitation version 5Posted
Lifecycle
- 1Version 1PresolicitationArchived
TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
- 2Version 2PresolicitationArchived
TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
- 3Version 3PresolicitationArchived
TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
- 4Version 4PresolicitationArchived
TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
- 5Version 5PresolicitationArchived
TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
- 7Version 7PresolicitationArchivedCurrent
TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
FA813726R0023
Archive Date
Oct 1, 2026
Office Address
TINKER AFB, OK, 73145-9125