WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Archived on October 5, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 AM CDT
- Posted
- September 25, 2026
- Notice type
- Solicitation
- Set-aside
- SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA8137 AFSC PZIOC
- Place of performance
- Tinker AFB, Oklahoma, 73145
- PSC
- Z1AA: MAINTENANCE OF OFFICE BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA813726R0026
- Notice ID
- fab48287b120443580db895f24929d73
Description
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 08 - 25 September 2026
1) This Solicitation has been canceled due to developing site conditions.
2) This requirement will be re-solicited on a later date, not yet known at this time.
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 08 - 26 August 2026
1) 2nd round of Prebid RFI Responses have been posted to the attachments section and are labeled: "250063_Pre-Bid RFI_Responses Round 2 COR"
2) The proposal due date has been extend from August 31st 2026 @ 2:00 pm (1400) to September 4th 2026 @ 2:00 pm (1400)
3) The solicitation amendmnet has been posted to the attachments section and is labeled: "Solicitation Amendment FA813726R00260001 SF 30".
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 07 - 11 August 2026
1) Due to the revised Statement of Work, and Drawings, this solicitation will be opened up for a second round of RFI's
2) RFI's will be due 13 August 2026 @ 1400 (2:00 pm)
3) RFI's are to be sent to SSgt Isaac Demmers at isaac.demmers@us.af.mil
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 06 - 5 August 2026
1) A revised Statmenet of Work labeled "250063_ATT01_SOW_Amend_01" has been posted to the attachments section of this solicitation.
2) Revised drawings labeled "250063_ATT02_Drawings_Amend_01" have been posted to the the attachments section of this solicitation.
3) Proposals are due 31 August 2026 @ 1400 (2:00 PM) CST
4) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 05 - 31 JULY 2026
1) Prebid RFI Responses have been posted to the attachments section and are labeled: "250063_Prebid RFI Responses"
2) Proposals are due 31 August 2026 @ 1400 (2:00 pm) CST.
3) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 04 - 23 JULY 2026
1) An updated Site Visit Sign in Sheet has been posted.
2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 03 - 20 JULY 2026
1) Due to several missed RSVP's an additional site visit will be held 21 July 2026 @ 1230 (12:30 PM)
2) If you attended the first site visit you are not required to attend the additional site visit
3) If you wish to attend the additional site visit please send an RSVP to SSgt Isaac Demmers at isaac.demmers@us.af.mil by 1800 (6:00 pm) on 20 July 2026
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 02 - 20 JULY 2026
1) The site visit for this requirement was conducted on 20 July 2026
2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST
3) The site visit sign in sheet has been posted in the attachments
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 01 - 13 JULY 2026
1) The official solicitation document for this requirement labeled (Solicitation - FA813726R0026) has been replaced to refelct an issue date of: 13 Jul 2026
2) All other terms and conditions remain the same
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access.
After receipt of your RSVP and EAL if required, Initial Site Visit is set for Monday, 20 July, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point.
You must attend the initial Site Vist for the project, to be considered eligible to propose.
Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil".
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (108)
- Download
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf
386 KBAdded in Solicitation version 13Posted - Download
Solicitation Amendment FA813726R00260001 SF 30.pdf
219 KBAdded in Solicitation version 11Posted - Download
250063_Pre-Bid RFI_Responses Round 2 COR.pdf
290 KBAdded in Solicitation version 11Posted - Download
250063_ATT02_Drawings_Amend_01.pdf
14 MBAdded in Solicitation version 8Posted - Download
250063_ATT01_SOW_Amend_01.pdf
374 KBAdded in Solicitation version 8Posted - Download
250063_Prebid RFI Responses.pdf
224 KBAdded in Solicitation version 7Posted - Download
Site Visit Sign in Sheet - WWYK250063.jpg
27 KBAdded in Solicitation version 6Posted - Download
Site Visit Sign In Sheet.jpg
93 KBAdded in Solicitation version 4Posted - Download
Solicitation - FA813726R0026.pdf
703 KBAdded in Solicitation version 2Posted - Download
Site Visit Meet Up Location.png
1.5 MBAdded in Solicitation version 1Posted - Download
250063_ATT 4_ODS.pdf
157 KBAdded in Solicitation version 1Posted - Download
250063_ATT 10_Submittal Register.pdf
360 KBAdded in Solicitation version 1Posted - Download
250063_ATT 9_SOW.pdf
373 KBAdded in Solicitation version 1Posted - Download
250063_ATT 11_Drawings.pdf
14 MBAdded in Solicitation version 1Posted - Download
WWYK250063-04March2026 1.docx
425 KBAdded in Solicitation version 1Posted - Download
WWYK250063-04March2026.pdf
76 KBAdded in Solicitation version 1Posted - Download
2020 TAFB Facility Standard.pdf
5.8 MBAdded in Solicitation version 1Posted - Download
2026 TAFB Mechanical Standard_signed.pdf
1.2 MBAdded in Solicitation version 1Posted - Download
2026 TAFB Electrical Standard - Signed.pdf
523 KBAdded in Solicitation version 1Posted - Download
2026 TAFB FIRE PROTECTION STANDARD.pdf
341 KBAdded in Solicitation version 1Posted - Download
SOW Att 02a_Controlled Area Training.pptx
651 KBAdded in Solicitation version 1Posted - Download
SOW Att 02c_Controlled Area Training - Certificate.pdf
467 KBAdded in Solicitation version 1Posted - Download
250063_ATT 3_RMDF.pdf
265 KBAdded in Solicitation version 1Posted - Download
SOW Att 01_Appointment of Security Representative Template 496.docx
101 KBAdded in Solicitation version 1Posted - Download
250063_ATT 10_Submittal Register.xlsx
70 KBAdded in Solicitation version 1Posted - Download
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx
16 KBAdded in Solicitation version 1Posted - Download
26 05 73 POWER STUDIES.pdf
4.6 MBAdded in Solicitation version 1Posted - Download
22 00 00.pdf
359 KBAdded in Solicitation version 1Posted - Download
23 00 00.pdf
245 KBAdded in Solicitation version 1Posted - Download
23 07 00.pdf
233 KBAdded in Solicitation version 1Posted - Download
28 31 76.pdf
200 KBAdded in Solicitation version 1Posted - Download
23 31 13.00 40.pdf
182 KBAdded in Solicitation version 1Posted - Download
26 20 00.pdf
187 KBAdded in Solicitation version 1Posted - Download
23 09 23.02.pdf
168 KBAdded in Solicitation version 1Posted - Download
23 08 00.pdf
163 KBAdded in Solicitation version 1Posted - Download
03 01 00.pdf
148 KBAdded in Solicitation version 1Posted - Download
09 90 00.pdf
139 KBAdded in Solicitation version 1Posted - Download
23 64 26.pdf
165 KBAdded in Solicitation version 1Posted - Download
23 09 13.pdf
171 KBAdded in Solicitation version 1Posted - Download
23 05 15.pdf
151 KBAdded in Solicitation version 1Posted - Download
21 13 13.pdf
103 KBAdded in Solicitation version 1Posted - Download
09 67 23.15.pdf
90 KBAdded in Solicitation version 1Posted - Download
26 51 00 INTERIOR LIGHTING.pdf
101 KBAdded in Solicitation version 1Posted - Download
23 36 00.00 40.pdf
90 KBAdded in Solicitation version 1Posted - Download
08 81 00.pdf
57 KBAdded in Solicitation version 1Posted - Download
08 71 00.pdf
59 KBAdded in Solicitation version 1Posted - Download
06 41 16.00 10.pdf
57 KBAdded in Solicitation version 1Posted - Download
10 22 13.pdf
22 KBAdded in Solicitation version 1Posted - Download
10 14 00.20.pdf
30 KBAdded in Solicitation version 1Posted - Download
05 40 00.pdf
42 KBAdded in Solicitation version 1Posted - Download
07 14 00.pdf
40 KBAdded in Solicitation version 1Posted - Download
10 14 00.10.pdf
42 KBAdded in Solicitation version 1Posted - Download
08 33 23.pdf
47 KBAdded in Solicitation version 1Posted - Download
23 05 48.00 40.pdf
49 KBAdded in Solicitation version 1Posted - Download
23 05 93.pdf
57 KBAdded in Solicitation version 1Posted - Download
08 51 23.pdf
38 KBAdded in Solicitation version 1Posted - Download
08 11 13.pdf
39 KBAdded in Solicitation version 1Posted - Download
07 84 00.pdf
32 KBAdded in Solicitation version 1Posted - Download
10 44 16.pdf
14 KBAdded in Solicitation version 1Posted - Download
07 92 00.pdf
43 KBAdded in Solicitation version 1Posted - Download
05 05 23.16.pdf
34 KBAdded in Solicitation version 1Posted - Download
07 21 16.pdf
26 KBAdded in Solicitation version 1Posted - Download
23 03 00.pdf
25 KBAdded in Solicitation version 1Posted - Download
00 72 00.pdf
5.3 MBAdded in Solicitation version 1Posted - Download
00 71 00.pdf
1.5 MBAdded in Solicitation version 1Posted - Download
01 78 00.pdf
1.4 MBAdded in Solicitation version 1Posted - Download
01 33 00.pdf
856 KBAdded in Solicitation version 1Posted - Download
00 70 00.pdf
897 KBAdded in Solicitation version 1Posted - Download
01 50 00.pdf
300 KBAdded in Solicitation version 1Posted - Download
01 33 16.00 10.pdf
86 KBAdded in Solicitation version 1Posted - Download
000_TABLE OF CONTENTS.pdf
70 KBAdded in Solicitation version 1Posted - Download
01 45 00.00 10.pdf
36 KBAdded in Solicitation version 1Posted - Download
01 78 23.pdf
34 KBAdded in Solicitation version 1Posted - Download
01 32 16.00 20.pdf
28 KBAdded in Solicitation version 1Posted - Download
00 80 00.pdf
8.2 KBAdded in Solicitation version 1Posted - Download
00 80 05.pdf
10 KBAdded in Solicitation version 1Posted - Download
01 42 00.pdf
10 KBAdded in Solicitation version 1Posted - Download
UMRL.pdf
686 KBAdded in Solicitation version 1Posted - Download
afi48-104.pdf
317 KBAdded in Solicitation version 1Posted - Download
image (1).png
243 KBAdded in Solicitation version 1Posted - Download
image.png
66 KBAdded in Solicitation version 1Posted - Download
250063 React VII_Hardware schedule 25MAR26 JL.xlsx
17 KBAdded in Solicitation version 1Posted - Download
PILE SCHEDULE.xlsx
11 KBAdded in Solicitation version 1Posted - Download
JOIST SPECIAL INSPECTIONS.xlsx
9.7 KBAdded in Solicitation version 1Posted - Download
ELECTRICAL PANEL SCHEDULE U18L.xlsx
23 KBAdded in Solicitation version 1Posted - Download
HELICAL PILES NOTES.docx
15 KBAdded in Solicitation version 1Posted - Download
Mechanical Schedules.xls
1.3 MBAdded in Solicitation version 1Posted - Download
Door_Window_Schedule.xlsx
18 KBAdded in Solicitation version 1Posted - Download
Room finish schedule.xlsx
10 KBAdded in Solicitation version 1Posted - Download
esvperf_singledual_2023_V2.pdf
670 KBAdded in Solicitation version 1Posted - Download
DESV_Submittal.pdf
457 KBAdded in Solicitation version 1Posted - Download
lrad331965pd_spec.pdf
384 KBAdded in Solicitation version 1Posted - Download
REACT VII SA-01.pdf
340 KBAdded in Solicitation version 1Posted - Download
z415-bz1.pdf
286 KBAdded in Solicitation version 1Posted - Download
esvEH_singledual_2023_V2.pdf
267 KBAdded in Solicitation version 1Posted - Download
HE05IN_Dimension_Drawing.pdf
194 KBAdded in Solicitation version 1Posted - Download
lk406gn05t4_spec.pdf
220 KBAdded in Solicitation version 1Posted - Download
z400i.pdf_safe.pdf
121 KBAdded in Solicitation version 1Posted - Download
2_-_HE05-JINV-S11EE---GNT---L_001.pdf
55 KBAdded in Solicitation version 1Posted - Download
ERV Schedule_TAFB B9001_O-212477.xlsx
8.5 KBAdded in Solicitation version 1Posted - Download
TAFB B9001 VAV Schedule.pdf
5.6 KBAdded in Solicitation version 1Posted - Download
ELECTRICAL COMBINED.pdf
53 MBAdded in Solicitation version 1Posted - Download
ARCH-COMBINED.pdf
41 MBAdded in Solicitation version 1Posted - Download
4500-S.pdf
14 MBAdded in Solicitation version 1Posted - Download
4500-CIVIL.pdf
14 MBAdded in Solicitation version 1Posted - Download
4500-MUG.pdf
14 MBAdded in Solicitation version 1Posted - Download
220042 As Built Drawings.pdf
12 MBAdded in Solicitation version 1Posted - Download
overall plan 04.15.2021.pdf
184 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 2Version 2SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 3Version 3SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 4Version 4SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 5Version 5SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 6Version 6SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 7Version 7SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 8Version 8SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 9Version 9SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 11Version 11SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 12Version 12SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 13Version 13SolicitationArchived
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 14Version 14SolicitationArchivedCurrent
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Similar Opportunities
Additional Details
Solicitation Number
FA813726R0026
Archive Date
Oct 5, 2026
Office Address
TINKER AFB, OK, 73145-9125