GovChime
Notice ID: 98afe5e9cae74c03a40fba105b86ce95SolicitationArchived

TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

Archived on August 11, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM CDT
Posted
July 23, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8137 AFSC PZIOC
Place of performance
S Coffeyville, Oklahoma, 73145
PSC
Z2NE: REPAIR OR ALTERATION OF WATER SUPPLY FACILITIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA813726R0039
Notice ID
98afe5e9cae74c03a40fba105b86ce95

Description

This order proposal request is only available to current MACC-BOA holders.

The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the Design & Implement Monitoring & Control System For IWCS, B62516 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).

The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB.

The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.

Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.

This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. As such, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.

IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems.

Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.

Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner.  If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.

The site visit is scheduled for June 1st, 2026 at 10:00 A.M. at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP.

The due date for the RFIs arising from the site visit is currently set for June 5th, 2026 at 5:00 PM CST. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees.

This notice signifies the release of the formal RFP for Project No. WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516. The due date for proposals has been extended to July 27th, 2026 at 5:00 PM CST. Any further extensions granted to the proposal due date will be updated to this posting. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates.

In lieu of the physical CD, some additional documents have been added to the attachments section including the Project Docs, Facility Standards, As-Built Info, CAD Drawings, and some additional large files. Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the documents.

An accommodation has been made to extend the due date for proposals to July 27th, 2026 at 5:00 PM CST. This is to allow offerors additional time to incorporate the Government responses to the Requests for Information as well as supplemental information from key stakeholder Honeywell into their proposals. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information.

All RFI responses have been received and compiled. Please see the attachments for the RFI responses. Utilize these in continuing to formulate your proposals. If RFI responses prompt a need for an extension to the proposal due date, please communicate that to the primary and secondary points of contact, and any extensions granted will be updated to this posting.

An amendment to the formal RFP including a revision to Section C - Descriptions/Specifications/Statement of Work has been issued to correct a discrepancy among the solicitation, IFC Drawings, and Statement of Work. The scope of the solicitation and the subsequent order exclusively pertains to the four lift stations enumerated in the Statement of Work, IFC Drawings, and amended solicitation. The due date for proposals remains firm as July 27th, 2026, and all other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (24)

  • FA813726R0039-0001_Revised_Conformed.pdf

    650 KBAdded in Solicitation version 15Posted
    Download
  • FA813726R0039-0001_Revised_SF 30.pdf

    373 KBAdded in Solicitation version 15Posted
    Download
  • 240146_Compiled Pre-Bid RFIs_Gov Responses.pdf

    245 KBAdded in Solicitation version 11Posted
    Download
  • CTR CD_Project Docs_Att 1.zip

    52 MBAdded in Presolicitation version 2Posted
    Download
  • CTR CD_Project Docs_Att 1.zip

    52 MBAdded in Solicitation version 7Posted
    Download
  • CTR CD_Base Facility Stds_Att 2.zip

    2.0 MBAdded in Presolicitation version 2Posted
    Download
  • CTR CD_Base Facility Stds_Att 2.zip

    2.0 MBAdded in Solicitation version 7Posted
    Download
  • CTR CD_As-Built Info_Att 3.zip

    50 MBAdded in Presolicitation version 2Posted
    Download
  • CTR CD_As-Built Info_Att 3.zip

    50 MBAdded in Solicitation version 7Posted
    Download
  • CTR CD_CAD Drawings_Att 4.zip

    164 MBAdded in Presolicitation version 2Posted
    Download
  • CTR CD_CAD Drawings_Att 4.zip

    164 MBAdded in Solicitation version 7Posted
    Download
  • CTR CD_Large Files_Att 5.zip

    151 MBAdded in Presolicitation version 2Posted
    Download
  • CTR CD_Large Files_Att 5.zip

    151 MBAdded in Solicitation version 7Posted
    Download
  • FA813726R0039_Draft.pdf

    650 KBAdded in Presolicitation version 1Posted
    Download
  • FA813726R0039_Formal RFP.pdf

    647 KBAdded in Solicitation version 2Posted
    Download
  • 240146_Section L_Instructions to Offerors.pdf

    827 KBAdded in Presolicitation version 1Posted
    Download
  • 240146_Section L_Instructions to Offerors.pdf

    827 KBAdded in Solicitation version 2Posted
    Download
  • 240146_Section M_Evaluation Factors for Award.pdf

    394 KBAdded in Presolicitation version 1Posted
    Download
  • 240146_Section M_Evaluation Factors for Award.pdf

    394 KBAdded in Solicitation version 2Posted
    Download
  • EAL_CTR to Fill.xlsx

    62 KBAdded in Presolicitation version 1Posted
    Download
  • 240146_Drawings.pdf

    18 MBAdded in Solicitation version 2Posted
    Download
  • 240146_Drawings.pdf

    18 MBAdded in Presolicitation version 1Posted
    Download
  • 240146_SOW.pdf

    311 KBAdded in Solicitation version 2Posted
    Download
  • 240146_SOW.pdf

    311 KBAdded in Presolicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1PresolicitationArchived

    TAFB MACC-BOA | Initial Site Visit for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 92e682c94c6e4f0ba17f432215bc24c2 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice de135bc7510e486ebfae6d117d5fc91e on SAM.gov

  3. 3
    Version 3SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice ed15fd0b26a040d6a54231a3b646d5be on SAM.gov

  4. 4
    Version 4SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 5aef231a05f24173bd8a6bc0f81c7b2a on SAM.gov

  5. 5
    Version 5SolicitationCancelledArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 472d0b48f34e4b73bfe34d24afdb3727 on SAM.gov

  6. 6
    Version 6SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 7f1d97f4dc8e45cb9e14c32752df4ce6 on SAM.gov

  7. 7
    Version 7SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 7cf1eecd2eab4684b4c5ce0bb21938f5 on SAM.gov

  8. 8
    Version 8SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 9039115c285b49e48a2657044a88e0dc on SAM.gov

  9. 9
    Version 9SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 52ee1deaf1d64fc8861ac2aee56fec5f on SAM.gov

  10. 10
    Version 10SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice c0f1e13f6652495aab4d1ed1c4fa002c on SAM.gov

  11. 11
    Version 11SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 04cb2b0022e0447b80bac92f0f58a353 on SAM.gov

  12. 12
    Version 12SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 7e07440a54374a5dadbe51450925bd80 on SAM.gov

  13. 13
    Version 13SolicitationArchived

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice d56dbc2e09e84aaca3ac24d250290b72 on SAM.gov

  14. 15
    Version 15SolicitationArchivedCurrent

    TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

    Notice 98afe5e9cae74c03a40fba105b86ce95 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA813726R0039

Archive Date

Aug 11, 2026

Office Address

TINKER AFB, OK, 73145-9125