GovChime
Notice ID: dca54e3594804ff498147e9a80c6ab15SolicitationArchived

Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501

Archived on September 15, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
August 10, 2026
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8137 AFSC PZIOC
Place of performance
0, Oklahoma, 73145
PSC
Z2PD: REPAIR OR ALTERATION OF WASTE TREATMENT AND STORAGE FACILITIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA813726R0043
Notice ID
dca54e3594804ff498147e9a80c6ab15

Description

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

UPDATE 04 - 10 AUGUST 2026

1) A revised Statement of Work labeled "240176_ATT02_STATEMENT OF WORK_Admendment 2" has been posted to the attachments sections of this solicitation

2) Revised drawings labeled "240176_ATT03_Amendment 2_Drawings" have been posted to the attachments section of this solicitation

3)  A revised Design Narrative labeled "240176_ATT01_Design Narrative_Amendment 2" has been posted to the attachments secitons of this soliciation

4) Proposals are due 31 August 2026 @ 1400 (2:00 PM) CST

5) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

UPDATE 03 - 31 JULY 2026

1) Prebid RFI Responses have been posted to the attachments section and are labeled: "WWYK240176 Pre Bid RFI's"

2) Proposals are due 31 August 2026 @ 1400 (2:00 pm) CST. 

3) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

UPDATE 02 - 23 JULY 2026

1) The Site Visit Sign In sheet has been posted in the attachments section

2) RFI responses from the previous solicitation have been posted in the attachments section

3) RFI's are due 27 July 2026 @ 1400 (2:00 pm). Please send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

UPDATE 01 - 22 JULY 2026

1) The site visit was conducted on 21 July 2026

2) RFI's are due 27 July 2026 @ 1400 (2:00 pm). Please send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil.

3) The site visit sign in sheet will be posted on 23 July 2026

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

Project Title: WWYK240176 - REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501

Rehabilitate or replace LS-6N&S (B2122). Consider future flows. Consider if LS-6N&S can be combined into a single LS. Consider if wet well structure can be combined, reused, and/or rehabilitated with a coating system or liner. The work to be performed under the terms of this order consists of furnishing all design/engineering services, material, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the demo and replacement of the industrial waste lift stations (IWLS) 6N and 6S at Tinker Air Force Base (AFB), Oklahoma. 

Project specific documents are attached to this posting.

If you experience any difficulty at receiving or accessing the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission sent to your email. In the email, please provide email addresses for Prime Contractors points of contact ONLY, to have a DoD Safe link sent to. Do not include any sub-contractor email addresses. 

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access.

After receipt of your RSVP and EAL if required, Initial Site Visit is set for Tuesday, 21 July, 2026 at 0900 (9:00 am). The meet up location for the site visit will be held near building 2122. Approximate coordinates are: 35°24'33.3"N 97°22'17.2"W. An attachment titled "Site Visit Meet-up Point" attached below gives the specific details and visual for the meet up point. 

You must attend the initial Site Vist for the project, to be considered eligible to propose. 

Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil".

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (122)

  • 240176_ATT03_Amendment 2_Drawings.pdf

    5.3 MBAdded in Solicitation version 6Posted
    Download
  • 240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf

    319 KBAdded in Solicitation version 6Posted
    Download
  • 240176_ATT01_Design Narrative_Amendment 2.pdf

    342 KBAdded in Solicitation version 6Posted
    Download
  • 240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf

    442 KBAdded in Solicitation version 4Posted
    Download
  • 240176_Site Visit Sign In.pdf

    3.8 MBAdded in Solicitation version 3Posted
    Download
  • 240176_PRE-BID RFI RESPONSES - COR Signed.pdf

    876 KBAdded in Solicitation version 3Posted
    Download
  • Solicitation - FA813726R0043.pdf

    680 KBAdded in Solicitation version 1Posted
    Download
  • Site Visit Meet-up Point.png

    2.0 MBAdded in Solicitation version 1Posted
    Download
  • Wage Determination - 18 May 2026.pdf

    143 KBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT10_Design_Narrative.pdf

    3.9 MBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT09_SOW.pdf

    316 KBAdded in Solicitation version 1Posted
    Download
  • 240176_STATEMENT OF WORK-Amendment 1.pdf

    318 KBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT12_ Drawings.pdf

    3.0 MBAdded in Solicitation version 1Posted
    Download
  • 240176_Amendment 1 Drawings.pdf

    3.3 MBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT 11_Submittal Register.xlsx

    20 KBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT 3_Green Procurement Statement.pdf

    278 KBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT 10_Design Narrative.pdf

    3.9 MBAdded in Solicitation version 1Posted
    Download
  • SOW Att 02a_Controlled Area Training.pptx

    651 KBAdded in Solicitation version 1Posted
    Download
  • SOW Att 02c_Controlled Area Training - Certificate.pdf

    467 KBAdded in Solicitation version 1Posted
    Download
  • SOW Att 01_Appointment of Security Representative Template 496.docx

    101 KBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT 11_Submittal Register.pdf

    142 KBAdded in Solicitation version 1Posted
    Download
  • 240176_ATT 9_STATEMENT OF WORK.pdf

    316 KBAdded in Solicitation version 1Posted
    Download
  • 240176_Final_ Plan Set.pdf

    3.0 MBAdded in Solicitation version 1Posted
    Download
  • Industrial Waste Lines 1969.pdf

    9.4 MBAdded in Solicitation version 1Posted
    Download
  • 920203.pdf

    6.8 MBAdded in Solicitation version 1Posted
    Download
  • 02122M-EQ01.pdf 2024.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • 1995_IndWaste.pdf

    1.1 MBAdded in Solicitation version 1Posted
    Download
  • 1993_IndWaste.pdf

    1.1 MBAdded in Solicitation version 1Posted
    Download
  • Industrial Waste Distribution East of 18_36.pdf

    898 KBAdded in Solicitation version 1Posted
    Download
  • 1994_IndWaste.pdf

    1.2 MBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU502.pdf

    716 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU514.pdf

    617 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU507.pdf

    728 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU513.pdf

    344 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU501.pdf

    473 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU503.pdf

    367 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU500.pdf

    417 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU509.pdf

    358 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU512.pdf

    358 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU505.pdf

    574 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU510.pdf

    282 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU511.pdf

    412 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU508.pdf

    444 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU506.pdf

    420 KBAdded in Solicitation version 1Posted
    Download
  • WWYK143004_CU504.pdf

    384 KBAdded in Solicitation version 1Posted
    Download
  • Pages from 910139.pdf

    1.8 MBAdded in Solicitation version 1Posted
    Download
  • WWYK921223.pdf

    1.0 MBAdded in Solicitation version 1Posted
    Download
  • 20010298.pdf

    893 KBAdded in Solicitation version 1Posted
    Download
  • 20090026A.pdf

    212 KBAdded in Solicitation version 1Posted
    Download
  • 02119A-FP01-Model.pdf

    90 KBAdded in Solicitation version 1Posted
    Download
  • B02119.txt

    1.3 KBAdded in Solicitation version 1Posted
    Download
  • 730155.pdf

    355 KBAdded in Solicitation version 1Posted
    Download
  • 710238.pdf

    1.1 MBAdded in Solicitation version 1Posted
    Download
  • 710237.pdf

    384 KBAdded in Solicitation version 1Posted
    Download
  • 690255.pdf

    474 KBAdded in Solicitation version 1Posted
    Download
  • 610080.pdf

    473 KBAdded in Solicitation version 1Posted
    Download
  • 581021.pdf

    83 KBAdded in Solicitation version 1Posted
    Download
  • 551213.pdf

    121 KBAdded in Solicitation version 1Posted
    Download
  • 531005.pdf

    155 KBAdded in Solicitation version 1Posted
    Download
  • 480211.pdf

    445 KBAdded in Solicitation version 1Posted
    Download
  • 430515.pdf

    869 KBAdded in Solicitation version 1Posted
    Download
  • Combined As-Built Record Dwgs.pdf

    12 MBAdded in Solicitation version 1Posted
    Download
  • FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf

    4.2 MBAdded in Solicitation version 1Posted
    Download
  • FIRE SUPPRESSION TANK FIRE ALARM AS-BUILT SHOP DRAWINGS.pdf

    1.0 MBAdded in Solicitation version 1Posted
    Download
  • 2020 TAFB Facility Standard.pdf

    5.8 MBAdded in Solicitation version 1Posted
    Download
  • 2025 TAFB Mechanical Standard_Signed.pdf

    1.3 MBAdded in Solicitation version 1Posted
    Download
  • 2025 TAFB Electrical Standards - Signed.pdf

    559 KBAdded in Solicitation version 1Posted
    Download
  • 2023 TAFB Fire Protection Standard.pdf

    379 KBAdded in Solicitation version 1Posted
    Download
  • 00 72 00.pdf

    5.3 MBAdded in Solicitation version 1Posted
    Download
  • 00 71 00.pdf

    1.5 MBAdded in Solicitation version 1Posted
    Download
  • 01 78 00.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • 00 70 00.pdf

    897 KBAdded in Solicitation version 1Posted
    Download
  • 01 33 00.pdf

    856 KBAdded in Solicitation version 1Posted
    Download
  • 01 50 00.pdf

    300 KBAdded in Solicitation version 1Posted
    Download
  • Tinker General Requirements Specifications_Nov 2022_Change Log.pdf

    94 KBAdded in Solicitation version 1Posted
    Download
  • 000_TABLE OF CONTENTS.pdf

    70 KBAdded in Solicitation version 1Posted
    Download
  • 01 45 00.00 10.pdf

    36 KBAdded in Solicitation version 1Posted
    Download
  • 01 33 16.00 10.pdf

    86 KBAdded in Solicitation version 1Posted
    Download
  • 01 32 16.00 20.pdf

    28 KBAdded in Solicitation version 1Posted
    Download
  • 00 80 05.pdf

    10 KBAdded in Solicitation version 1Posted
    Download
  • 00 80 00.pdf

    8.2 KBAdded in Solicitation version 1Posted
    Download
  • 01 78 23.pdf

    34 KBAdded in Solicitation version 1Posted
    Download
  • 01 42 00.pdf

    10 KBAdded in Solicitation version 1Posted
    Download
  • HAZMAT Reporting at Tinker AFB FEB 2025.pdf

    23 KBAdded in Solicitation version 1Posted
    Download
  • UMRL.pdf

    686 KBAdded in Solicitation version 1Posted
    Download
  • ERDCITL_TR12-1_r2.pdf

    3.4 MBAdded in Solicitation version 1Posted
    Download
  • ERDCITL_TR12-6_r6.pdf

    1.5 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_260_01_2019_c1.pdf

    70 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_535_01_2017_c4.pdf

    20 MBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_INRMP.pdf

    16 MBAdded in Solicitation version 1Posted
    Download
  • EM_385-1-1.pdf

    10 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_600_01_2016_c6.pdf

    9.9 MBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_INRMP_App G.pdf

    4.6 MBAdded in Solicitation version 1Posted
    Download
  • dafman91-203.pdf

    3.8 MBAdded in Solicitation version 1Posted
    Download
  • dafi21-101_afmcsup_afmcgm2023-01.pdf

    2.8 MBAdded in Solicitation version 1Posted
    Download
  • dafi21-101.pdf

    2.5 MBAdded in Solicitation version 1Posted
    Download
  • afi91-202_afmcsup.pdf

    2.7 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_601_02_2021.pdf

    2.1 MBAdded in Solicitation version 1Posted
    Download
  • dafi91-202.pdf

    1.9 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_260_04_2018.pdf

    2.3 MBAdded in Solicitation version 1Posted
    Download
  • tinkerafbi13-204.pdf

    1.8 MBAdded in Solicitation version 1Posted
    Download
  • dafi13-213.pdf

    1.2 MBAdded in Solicitation version 1Posted
    Download
  • afman32-7003.pdf

    1.3 MBAdded in Solicitation version 1Posted
    Download
  • afman48-148.pdf

    1.0 MBAdded in Solicitation version 1Posted
    Download
  • afman40-201.pdf

    1.1 MBAdded in Solicitation version 1Posted
    Download
  • dafi13-213_tinkerafbsup.pdf

    687 KBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_HWMP.pdf

    1016 KBAdded in Solicitation version 1Posted
    Download
  • TAFB_SOP_outages_v2.pdf

    473 KBAdded in Solicitation version 1Posted
    Download
  • afman91-203_oc-alcsup.pdf

    389 KBAdded in Solicitation version 1Posted
    Download
  • dodio-2000.16v1_afi10-245-o.pdf

    37 KBAdded in Solicitation version 1Posted
    Download
  • afi48-104.pdf

    317 KBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_INRMP_App E.pdf

    225 KBAdded in Solicitation version 1Posted
    Download
  • tinkerafbi21-100.pdf

    213 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch13_AF487.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • 007000_Attch1_TAFB Outage Request Form.pdf

    186 KBAdded in Solicitation version 1Posted
    Download
  • 007100_Attch1_Airfield Construction Waiver.pdf

    192 KBAdded in Solicitation version 1Posted
    Download
  • 013300_Attch1_TAFBF3000.pdf

    234 KBAdded in Solicitation version 1Posted
    Download
  • 017800_Attch1_DD1354.pdf

    93 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch14_Information for New Boilers.pdf

    144 KBAdded in Solicitation version 1Posted
    Download
  • 017800_Attch2_DD1354 Checklist.docx

    44 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch7a_AF3952.pdf

    40 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch9_EMS Awareness Training.pdf

    86 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501

    Notice 8d6e4c8cc0f24fe3b99f62b0a5500494 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501

    Notice 781344f7c7c44646aef00e0487cf57c4 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501

    Notice cf80627fc71a479e981c5d14da12c725 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501

    Notice 672bf61980b34fdeb04cafd6f4c44b5f on SAM.gov

  5. 6
    Version 6SolicitationArchivedCurrent

    Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501

    Notice dca54e3594804ff498147e9a80c6ab15 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA813726R0043

Archive Date

Sep 15, 2026

Office Address

TINKER AFB, OK, 73145-9125