SOLE SOURCE RIEGL VZ-20001 3D TLS 2 YEAR MAINTENANCE
Awarded on April 13, 2026. Full description on SAM.gov.
Description
The government awarded Firm-Fixed-Price (FFP) sole source contract to Riegl USA (Cage Code 1RMP5), FA8201-26- P-0013. Riegl USA is the OEM and the only authorized service provider for the referenced scanner for the following requirement: 2 Year Maintenance for Riegl VZ-20001 3D TLS. See attached Sole Source Justification (SSJ).
Overview
Award Overview
Award Number
FA820126P0013
Award Amount (SAM.gov award notice)
Not specified
Award Date
Apr 13, 2026
Awardee
Not specified
Original Solicitation
Notice ID: 6bc37c48d79a4abc80b6ceb0f9b3bb61
Posted Date: Apr 16, 2026
Original Response Deadline: Not specified
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 1 of 1 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Justification | DEPT OF THE AIR FORCE | Apr 16, 2026 | 191.14 KB |
Lifecycle
FA820126P0013- Awarded
This opportunity has been awarded.
- Sole Source / J&ACurrentApr 16, 2026
SOLE SOURCE RIEGL VZ-20001 3D TLS 2 YEAR MAINTENANCE
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Login at https://piee.eb.mil and search for 'FA821426RB002' to obtain more details.* Documents related to this procurment are only available through PIEE. 1. Executive Summary: Background & Objective The U.S. Air Force has a critical requirement to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) by maintaining the operational readiness of the Missile Guidance Set (MGS) to meet warfighter requirements. Specifically, this effort supports the repair line for the Pendulous Integrated Gyroscopic Accelerometer (PIGA) Float Assembly. The PIGA Float is a critical and precise sub-assembly that serves as the heart of the PIGA instrument, enabling it to measure missile acceleration. Each MGS contains three separate PIGA instruments (each housing a PIGA Float). Without this critical component, the ICBM would cease to function properly. The PIGA Float repair effort is a continuous operation necessary to avoid mission degradation. Quality control and precision engineering are paramount due to the strategic importance of the MMIII weapon system. The contractor must maintain stringent quality assurance protocols to guarantee that each repaired PIGA Float meets the rigorous military specifications. 2. Scope of Work The contractor shall provide the necessary personnel, facilities, and expertise to support the PIGA Float Assembly repair line. The primary scope includes: Repair Operations - The re-manufacture, rebuild, and repair of PIGA Float Assemblies. Volume / Throughput - The repair of 96 PIGA Floats per year. Government Furnished Equipment (GFE) - The repair and/or replacement of GFE as required to support continuous operation of the PIGA Float repair line 3. Contract Structure & Period of Performance The Government anticipates awarding an Indefinite Delivery/Indefinite Quantity (IDIQ) contract utilizing a mix of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP) pricing arrangements. Contract Duration - 5-Year IDIQ Anticipated Ordering Period - 1 November 2026 – 31 October 2031 Task Order Structure - Annual issuance of new, two-year non-severable Task Orders 4. Acquisition Authority & Strategy In accordance with Revolutionary FAR Overhaul (RFO) Subpart 5.1, this solicitation is an intended sole-source procurement. The Government will solicit and negotiate with only one source: Honeywell Aerospace (CAGE: 09128). This action is taken under the authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1. Market research—including Sources Sought Synopsis FA821425CBPIGA (posted 29 May 2025)—concluded that Honeywell Aerospace is the only responsible source capable of fulfilling the Government’s requirement without causing unacceptable delays to the MMIII weapon system mission. Note: While this is not a request for competitive proposals, information received from other responsible sources identifying their interest and capability will be considered solely to determine whether to conduct a competitive procurement in the future, at the Government’s discretion. 5. Proposal Submission Instructions All proposals submitted in response to this solicitation must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No other methods of proposal submission (e.g., email, hard copy, DoD SAFE) will be accepted. Offerors must be registered in PIEE and have the appropriate roles activated to submit proposals via the Solicitation module prior to the proposal due date. Cost & Pricing Data: The Government requests that ProPricer models (version v9.5.105.2) be submitted in conjunction with all Certified Cost and Pricing Data. Mandatory Pricing Rubric: Submission of the attached Pricing Rubric is a mandatory requirement. Proposals submitted without a completed Pricing Rubric will be automatically rejected by the PIEE solicitation module and will not be considered for evaluation. Submission Cutoff: Proposals will not be accepted after the solicitation closes. Timely submission is the sole responsibility of the offeror, and late proposals will not be evaluated unless otherwise stated under RFO guidelines. | Solicitation | 334511 | No Set-Aside | 10/05/2026 | 12/03/2026 | 0, UT | |
UPDATE: Revised RFI Attachment dated 1 October 2026, Please Review. Unmanned Threat Emitter (UMTE) X Band Transmitter The Government is conducting market research to identify potential industry sources capable of providing solutions to consolidate and replace obsolete, single-function transmitter systems. Currently, the Government relies on multiple ground-based threat emitter platforms (designated TK-1, TK-2 and TK-4) which utilize legacy transmitters. See attached RFI document for more information. The drawings are CUI and require approval for access to unclassified military technical data. UPDATE 6/24/2026: Questions from Industry and Government Answers and Blower Drawing are included in the attachments. | Market Research | 334511 | No Set-Aside | 10/01/2026 | 10/21/2026 | Hill Air Force Base, UT | |
NOTICE: This is not a solicitation but rather a Sources Sought Synopsis to determine potential sources for information and planning purposes only. Any information submitted by respondents to this source sought synopsis is voluntary and will not be returned. The Government will not reimburse any costs incurred or associated with the submission of information in response to this notice. 1. Purpose The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist and to assist in determining whether this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Classification Systems (NAICS) Code is 334511 – Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing, with a corresponding size standard of 1,350 employees. The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small business categories to include 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned small business concerns. Interested parties are requested to identify their small business status relative to the identified NAICS code, any anticipated teaming arrangements, and a description of similar services offered to the Government and commercial customers within the past three years. Any responses involving teaming agreements should delineate between the work accomplished by the prime and the work accomplished by the teaming partners. 2. Program Details AFLCMC/WAMJ, F-16 System Program Office, Foreign Military Sales (FMS) Section, Hill AFB, UT is seeking information about potential sources interested in and capable of providing an AN/APG-83 AESA radar processor, part number 5210346-005. 2.1 Scope of Work The contractor shall produce AN/APG-83 AESA radar processor, part number 5210346-005, maintaining Form, Fit, and Function (FFF) compatibility with the existing system configuration. 2.2 In-Scope Materiel AN/APG-83 AESA Radar Processor, P/N 5210346-005 2.3 IDIQ Contract Structure This contract is structured as an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract pursuant to FAR 16.504. All work is ordered through individual Delivery Orders (DOs) issued by the Contracting Officer. No work shall commence without an executed delivery order citing the applicable FMS case funding and authorized work scope. 2.4 Specified Tasks The contractor shall perform the following tasks: Project Management: Develop and maintain an Integrated Master Schedule (IMS) detailing all major tasks, milestones, and deliverables. Processor Procurement: Procure, lot acceptance test and deliver units of item listed in Section 2.2. Verification and Validation: Develop a lot acceptance testing plan and execute bench-level functional testing on the LRUs. Testing shall verify that the units meet all FFF requirements and interface correctly within the next higher assembly. 2.5 Deliverables Hardware: Identify all available units of item listed in Section 2.2. Units will be retained at the contractor's facility. Data: Key data deliverables are listed in the Contract Data Requirements List (CDRL) below. CDRL No. Title Due Date A001 Project Management Plan / IMS 30 Calendar DAC* A002 Monthly Status Report 15th of each month A003 Fulfillment Status Report 30 Calendar DAC* A004 Remaining Processor Stock 30 Calendar DAC* *Days After Contract Award 3. Questions for Contractors / Information to be Provided in Response Interested parties are requested to provide responses to the following: Provide your suggested NAICS code. Do you anticipate your company will serve as a prime contractor or subcontractor? Do you anticipate a teaming arrangement? If so, delineate the expected work to be accomplished by the prime versus the teaming partners. Does your company have an established relationship or agreement with Raytheon? If so, please provide a copy of the agreement or a description of the relationship. Please describe your capability to perform bench-level qualification testing and functional verification of LRUs. Please describe your experience handling Controlled Unclassified Information (CUI) and complying with NIST SP 800-171 and DFARS 252.204-7012 cybersecurity requirements. What is your estimated schedule to identify all available processors? Please provide any additional information regarding surge capabilities or constraints. 4. Government Points of Contact All responses and inquiries shall be submitted via email to the following points of contact no later than 1 September 2026. Responses must be limited to 20 pages. Role Name / Email Phone Primary POC Capt Andrew Westphal andrew.westphal.1@us.af.mil TBD Contracting Officer / PCO George Bell george.bell.2@us.af.mil TBD Program Manager Capt Andrew Westphal andrew.westphal.1@us.af.mil Capt Noah Coil noah.coil.1@us.af.mil TBD Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CTI). Other requests for this document must be referred to AFLCMC/WAMI. | Market Research | 334511 | No Set-Aside | 08/17/2026 | 09/01/2026 | - | |
Login at https://piee.eb.mil and search for 'FA821426RB002' to obtain more details.* Documents related to this procurment are only available through PIEE. 1. Executive Summary: Background & Objective The U.S. Air Force has a critical requirement to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) by maintaining the operational readiness of the Missile Guidance Set (MGS) to meet warfighter requirements. Specifically, this effort supports the repair line for the Pendulous Integrated Gyroscopic Accelerometer (PIGA) Float Assembly. The PIGA Float is a critical and precise sub-assembly that serves as the heart of the PIGA instrument, enabling it to measure missile acceleration. Each MGS contains three separate PIGA instruments (each housing a PIGA Float). Without this critical component, the ICBM would cease to function properly. The PIGA Float repair effort is a continuous operation necessary to avoid mission degradation. Quality control and precision engineering are paramount due to the strategic importance of the MMIII weapon system. The contractor must maintain stringent quality assurance protocols to guarantee that each repaired PIGA Float meets the rigorous military specifications. 2. Scope of Work The contractor shall provide the necessary personnel, facilities, and expertise to support the PIGA Float Assembly repair line. The primary scope includes: Repair Operations - The re-manufacture, rebuild, and repair of PIGA Float Assemblies. Volume / Throughput - The repair of 96 PIGA Floats per year. Government Furnished Equipment (GFE) - The repair and/or replacement of GFE as required to support continuous operation of the PIGA Float repair line 3. Contract Structure & Period of Performance The Government anticipates awarding an Indefinite Delivery/Indefinite Quantity (IDIQ) contract utilizing a mix of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP) pricing arrangements. Contract Duration - 5-Year IDIQ Anticipated Ordering Period - 1 November 2026 – 31 October 2031 Task Order Structure - Annual issuance of new, two-year non-severable Task Orders 4. Acquisition Authority & Strategy In accordance with Revolutionary FAR Overhaul (RFO) Subpart 5.1, this solicitation is an intended sole-source procurement. The Government will solicit and negotiate with only one source: Honeywell Aerospace (CAGE: 09128). This action is taken under the authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1. Market research—including Sources Sought Synopsis FA821425CBPIGA (posted 29 May 2025)—concluded that Honeywell Aerospace is the only responsible source capable of fulfilling the Government’s requirement without causing unacceptable delays to the MMIII weapon system mission. Note: While this is not a request for competitive proposals, information received from other responsible sources identifying their interest and capability will be considered solely to determine whether to conduct a competitive procurement in the future, at the Government’s discretion. 5. Proposal Submission Instructions All proposals submitted in response to this solicitation must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No other methods of proposal submission (e.g., email, hard copy, DoD SAFE) will be accepted. Offerors must be registered in PIEE and have the appropriate roles activated to submit proposals via the Solicitation module prior to the proposal due date. Cost & Pricing Data: The Government requests that ProPricer models (version v9.5.105.2) be submitted in conjunction with all Certified Cost and Pricing Data. Mandatory Pricing Rubric: Submission of the attached Pricing Rubric is a mandatory requirement. Proposals submitted without a completed Pricing Rubric will be automatically rejected by the PIEE solicitation module and will not be considered for evaluation. Submission Cutoff: Proposals will not be accepted after the solicitation closes. Timely submission is the sole responsibility of the offeror, and late proposals will not be evaluated unless otherwise stated under RFO guidelines. | Solicitation | 334511 | No Set-Aside | 08/11/2026 | 10/05/2026 | - | |
Login at https://piee.eb.mil and search for 'FA821426RB002' to obtain more details.* | Solicitation | 334511 | No Set-Aside | 08/10/2026 | 10/05/2026 | - |
Additional Details
Solicitation Number
FA820126P0013
Archive Date
May 16, 2026
Office Address
HILL AFB, UT, 84056-5805