A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
Archived on April 8, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM MDT
- Posted
- April 8, 2026
- Notice type
- Solicitation
- NAICS
- 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8212 AFSC OLH PZABA
- PSC
- 1560: AIRFRAME STRUCTURAL COMPONENTS
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA8212-22-R-0025
- Notice ID
- fd09a169e37d4b7d930dfac0cfd9f682
Description
1. This is a formal solicitation or a Request For Proposal (RFP). The RFP is in accordance with Federal contract law.
2. IAW 5.207(c )(16), Synopsis Description, All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency and must be technically qualified for award (FAR 9.202).
3. Acquisition Type: Full & Open Competition to Qualified Manufacturers – No Set-Aside. If a large firm, subcontracting plan is required with the bid.
4. Contract Type: FFP Production Contract – Replenishment Parts – 5 YR IDIQ
5. REQUIREMENT A-10 SPARES:
- PN: 162J611521-1003A NSN: 1560-01-592-6923FJ, A-10 POD ASSY MLG Fairing LH (1EA First Article + 3EA Production Articles)
PLUS: Option Qty 8EA: Contractor shall state minimum qty per order (if applicable, if not applicable "N/A") Min Qty_8___. Unit price sheet for each out years (after FA acceptance, if required): Yr 1 (FY2023) $__2__; Yr 2 (FY2024) $_2___; Yr 3 (FY2025) $__2___; Yr 4 (FY2026) $__2___
- PN: 162J611521-1015A NSN: 1560-01-592-2577FJ, A-10 POD ASSY MLG Fairing RH ((1EA First Article + 3EA Production Articles)
PLUS: Option Qty 8EA: Contractor shall state minimum qty per order (if applicable, if not applicable "N/A") Min Qty_8___. Unit price sheet for each out years (after FA acceptance, if required): Yr 1 (FY2023) $__2__; Yr 2 (FY2024) $_2___; Yr 3 (FY2025) $__2___; Yr 4 (FY2026) $__2___
6. Higher level contract quality certification required. Potential offerors must submit AS9100 certification or higher with the bid and with the Source Approval Request (SAR), if not a qualified manufacturer.
7. Acquistion Threshold and Scope: Per the Independent Government Estimate (IGE) the total estimated acquisition value is greater than the $5M threshold but less than the $25 threshold. The Government does not have the authority and clearance to exceed this acquisition scope.
8. Projected Acquistion Schedule: Award within 60 days after RFP close-out date.
9. Export controlled data available only to DoD contractors that are potential offerors. Foreign participation is not permitted.
10. TDP. Offers shall be IAW the current TDP. The qualified manufacturer shall build and deliver on-time serviceable quality A-10 parts to the USAF. To meet the requirement the qualified manufacturer is responsible for reviewing the entire TDP before bidding on the requirement and identifying any discrepancies in the TDP preventing the manufacturer from meeting the inspection clause(s) of delivering serviceable assets in reasonable time to resolve the discrepancies and bid on-time.
11. TDP Access: The PCO is the point of contact for TDP access. The current TDP is attached to SECTION J of the RFP/Contract. The zip files must be downloaded from SAM.gov. To download the zip files from SAM.gov search for the RFP# FA8212-22-R-0025 and e-mail the PCO to approve access request to the controlled files. The request must be for official business only. DoD contractors must provide their CAGE code and if they are interested in bidding on the requirement before the PCO can approve the access request. The pre-award PCO is leslie.evans.1@us.af.mil and for post-award, the assigned PCO.
Data Package (Bid Sets)
NSN
PR
IMAGE COUNT
LOCATION
1560-01-591-6923FJ
1560-01-592-2577FJ
FD2020-22-00584
756
SAM.GOV
11. Acquisition Subject to Qualification Requirement. Replenishment parts must be acquired so as to ensure the safe, dependable, and effective operation of the military aircraft, the A-10s, and thus the spares are subject to qualification requirements per FAR 17.7, Acquisition of Replenishment Parts and FAR 9.2, Qualification Requirements. All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency; however, only a qualified responsible manufacturer may receive the award per FAR 9.2. Qualification Requirements, and FAR 9.1, Responsible Prospective Contractor. New sources may submit a Source Approval Request (SAR) per the attached Source Qualification Statement Spares (SQSS). If the offeror is not a qualified manufacturer at the time of bidding and has not submitted a SAR yet, the bid must include a complete SAR package in order to be accepted as a complete bid and be considered for award. Please note, the Govt intends to award as soon as possible, within 30 days after the RFP closed and the Govt has up to contract award to qualify new sources; however, contract award shall not be delayed to qualify new sources per FAR 9.202 (e). The Contracting Officer need not refer challenges to the qualification requirements to the Small Business Administration (SBA) per FAR 9.202(d).
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (54)
- Download
FA821222R0025_05 Extend RFP to 4AUG2022.pdf
455 KBAdded in Solicitation version 11Posted - Download
FA821222R0025-04 Update Required Delivery Times.pdf
1.2 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TD_162J611521-1003A_02_Part_2_of_3.zip
91 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TD_162J611521-1003A_02_Part_1_of_3.zip
89 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TD_162J611521-1003A_02_Part_3_of_3.zip
35 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611528-2099_04.zip
3.6 MBAdded in Solicitation version 11Posted - Download
EDL_015916923_update_with_3_TPRS_REV_8_8JUN2022.pdf
2.8 MBAdded in Solicitation version 11Posted - Download
FA8212-22-R-0025-0003 Update SECTION J.pdf
456 KBAdded in Solicitation version 11Posted - Download
Updated EDL 015922577 Rev 3.pdf
190 KBAdded in Solicitation version 11Posted - Download
EDL REV LIST FA821222R0025.pdf
142 KBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
162J611527-1001A_01_UGMASTER.zip
539 BAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
UGMASTER_160D611566-11_MAS.zip
14 KBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
UGMASTER_160C611001-3_MAS.zip
334 BAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162J611521-1003A_02.pdf
52 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611565-5001_02.zip
1.8 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611553-2019_02.zip
1.8 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
S987_K.pdf
1.6 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
PR_162J611527-1001A_01.zip
48 KBAdded in Solicitation version 11Posted - Download
FA8212-22-R-0025-0002.pdf
456 KBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611522-2003_04.zip
2.6 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611541-2001_02.zip
1.9 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611522-2015_02.zip
1.8 MBAdded in Solicitation version 11Posted - Download
FA8212-22-R-0025-0001.pdf
456 KBAdded in Solicitation version 11Posted - Download
SECTION_L_FA8212_7JUN2022.pdf
192 KBAdded in Solicitation version 11Posted - Download
EDL 015916923 update with 3 TPRS.pdf
168 KBAdded in Solicitation version 11Posted - Download
SECTION_M_FA8212_7JUN2022.pdf
167 KBAdded in Solicitation version 11Posted - Download
ATTACH_1_V2_6JUN2022.docx
15 KBAdded in Solicitation version 11Posted - Download
RFP FA821222R0025 Bids Due 28JUN2022.pdf
467 KBAdded in Solicitation version 11Posted - Download
Attachment 1 Contractor Responsibility Determination Questionnaire.docx
15 KBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611710-2001_05.zip
39 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611553-2021_02.zip
38 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TD_162J611521-1015A_02_PSE_Part_6.zip
6.0 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611555-2005_03.zip
37 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611521-2017_05.zip
37 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
Unmarked_Eng_Data_2022.pdf
513 KBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611526-2007_03.zip
24 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611529-2011_04.zip
19 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TPR_162D611528-2037_02.zip
18 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
591-6923.zip
29 MBAdded in Solicitation version 11Posted - Requires SAM.gov sign-in
TD_162D611565-5001_02.zip
2.6 MBAdded in Solicitation version 11Posted - Download
6923FJ_Procurement_Statements.pdf
249 KBAdded in Solicitation version 11Posted - Download
2577FJ_Procurement_Statements.pdf
249 KBAdded in Solicitation version 11Posted - Download
6923FJ_IUID.pdf
62 KBAdded in Solicitation version 11Posted - Download
2577FJ_IUID.pdf
62 KBAdded in Solicitation version 11Posted - Download
6923FJ_Item_Description.pdf
58 KBAdded in Solicitation version 11Posted - Download
2577FJ_Engineering_Instructions.pdf
154 KBAdded in Solicitation version 11Posted - Download
6923FJ_Production_Quality_Requirements.pdf
85 KBAdded in Solicitation version 11Posted - Download
2577FJ_Production_Quality_Requirements.pdf
85 KBAdded in Solicitation version 11Posted - Download
2577FJ_FA_Requirement (2).pdf
92 KBAdded in Solicitation version 11Posted - Download
2577FJ_FA_Requirement (1).pdf
93 KBAdded in Solicitation version 11Posted - Download
Foreign_Disclosure_Review.pdf
397 KBAdded in Solicitation version 11Posted - Download
CDRL_A001_FATR.pdf
198 KBAdded in Solicitation version 11Posted - Download
Transportation_Funds.pdf
90 KBAdded in Solicitation version 11Posted - Download
Packaging_Instructions.pdf
73 KBAdded in Solicitation version 11Posted
Lifecycle
- 12Version 12PresolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 3Version 3SolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 4Version 4SolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 5Version 5SolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 6Version 6SolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 7Version 7SolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 8Version 8SolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 9Version 9SolicitationArchived
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
- 11Version 11SolicitationArchivedCurrent
A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ
Similar Opportunities
Additional Details
Solicitation Number
FA8212-22-R-0025
Archive Date
Apr 8, 2026
Office Address
HILL AFB, UT, 84056