Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
Active, responses due . Full description on SAM.gov.
Description
1. DESCRIPTION OF REQUIREMENT
This is a Solicitation Synopsis issued by the Department of the Air Force, Air Force Nuclear Weapons Center (AFNWC/NIKM), Hill AFB, UT. This solicitation is for the production and delivery of flight test kit replenishment spares for the Flight Test, Telemetry, and Termination (FT3) Program.
These kits directly support the Air Force Global Strike Command (AFGSC) Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) Force Development Evaluation Operational Test Launch (OTL) Program.
2. SOLE-SOURCE JUSTIFICATION
The Government intends to solicit and negotiate with only one source: The Boeing Company (CAGE: 0B0D7), located in Layton, UT, under the authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1 (Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements).
Market research, including a Sources Sought Synopsis (FA8214-25S-FT3PD) and Pre-solicitation Notice (FA821426RB004-PRESOL), concluded that Boeing is the only source with the unique technical data, specialized engineering expertise, and established manufacturing infrastructure required to meet the Government's strict performance schedules. Award to any other source would result in an estimated minimum duplication of $80M in costs and an unacceptable delay of at least three (3) years.
3. PROGRAM SCOPE & REQUIREMENTS
The resulting contract is anticipated to be a Firm-Fixed-Price (FFP) vehicle containing the following primary parameters:
- Quantity: Production and delivery of twenty-five (25) FT3 flight test kits.
- Delivery Schedule: Just-in-time delivery to Vandenberg Space Force Base, CA, precisely 120 days prior to scheduled Operational Test Launches (OTLs).
- Period of Performance: October 2027 through September 2035.
- Total Estimated Program Value: Approximately $955M (including potential future procurements executed under an approved Class J&A).
4. SUBMISSION INSTRUCTIONS & INTEREST
This notice is not a request for competitive proposals, and a written solicitation will be issued directly to The Boeing Company. However, any responsible source that believes it can meet these requirements may submit a capability statement, proposal, or quotation, which shall be considered by the agency.
Information received will be evaluated solely to determine whether to conduct a competitive procurement in the future. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.
All responses must be submitted electronically to the Points of Contact listed below no later than the Response Deadline indicated in this posting.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (8)
- Download
5. Solicitation - FA821426RB004.pdf
708 KBAdded in Solicitation version 2Posted - Download
3. FT3 Production Follow-On CDRL Package 24 Apr 2026.docx
258 KBAdded in Solicitation version 2Posted - Download
1. FT3 PWS_Production Follow-On_1 Jun 26v1.docx
103 KBAdded in Solicitation version 2Posted - Download
6. AFNWC-NIMS OPSEC Addendum.docx
44 KBAdded in Solicitation version 2Posted - Download
2. FT3 Production Follow-On GRID.docx
73 KBAdded in Solicitation version 2Posted - Download
4. FT3 Production Follow-On CLIN Structure_Draft May 26.xlsx
19 KBAdded in Solicitation version 2Posted - Download
7. FT3_VSFB_locations for shipping Attachment.xlsx
9.7 KBAdded in Solicitation version 2Posted - Download
FT3 Production Follow-On Request for Proposal Memo_updated 7 July 26.docx
245 KBAdded in Solicitation version 2Posted
Lifecycle
- 4Version 4PresolicitationArchived
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
- 2Version 2Solicitation
Type changed from Presolicitation to Solicitation
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
- 5Version 5SolicitationCurrent
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
1. DESCRIPTION OF REQUIREMENT This is a Solicitation Synopsis issued by the Department of the Air Force, Air Force Nuclear Weapons Center (AFNWC/NIKM), Hill AFB, UT. This solicitation is for the production and delivery of flight test kit replenishment spares for the Flight Test, Telemetry, and Termination (FT3) Program. These kits directly support the Air Force Global Strike Command (AFGSC) Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) Force Development Evaluation Operational Test Launch (OTL) Program. 2. SOLE-SOURCE JUSTIFICATION The Government intends to solicit and negotiate with only one source: The Boeing Company (CAGE: 0B0D7), located in Layton, UT, under the authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1 (Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements). Market research, including a Sources Sought Synopsis (FA8214-25S-FT3PD) and Pre-solicitation Notice (FA821426RB004-PRESOL), concluded that Boeing is the only source with the unique technical data, specialized engineering expertise, and established manufacturing infrastructure required to meet the Government's strict performance schedules. Award to any other source would result in an estimated minimum duplication of $80M in costs and an unacceptable delay of at least three (3) years. 3. PROGRAM SCOPE & REQUIREMENTS The resulting contract is anticipated to be a Firm-Fixed-Price (FFP) vehicle containing the following primary parameters: Quantity: Production and delivery of twenty-five (25) FT3 flight test kits. Delivery Schedule: Just-in-time delivery to Vandenberg Space Force Base, CA, precisely 120 days prior to scheduled Operational Test Launches (OTLs). Period of Performance: October 2027 through September 2035. Total Estimated Program Value: Approximately $955M (including potential future procurements executed under an approved Class J&A). 4. SUBMISSION INSTRUCTIONS & INTEREST This notice is not a request for competitive proposals, and a written solicitation will be issued directly to The Boeing Company. However, any responsible source that believes it can meet these requirements may submit a capability statement, proposal, or quotation, which shall be considered by the agency. Information received will be evaluated solely to determine whether to conduct a competitive procurement in the future. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. All responses must be submitted electronically to the Points of Contact listed below no later than the Response Deadline indicated in this posting. | Solicitation | 336419 | No Set-Aside | 07/07/2026 | 01/05/2027 | - | |
SOURCES SOUGHT NOTICE: This is not a solicitation but rather a Sources Sought to seek new qualified and responsible manufacturers to produce spare F-16 parts in support of the United States Air Force (USAF). This is not a Request for Proposal (RFP) and does not construe as a commitment by the Government. Subject: F-16 Transparencies, NSN: 1560-01-462-2040, NSN: 1560-01-462-4551, NSN: 1560-01-497-5078, NSN: 1560-01-497-5956, NSN: 1560-01-497-5959, NSN: 1560-01-497-6599 The USAF is seeking out additional manufacturing sources capable of producing F-16 transparencies and interested in becoming qualified to do so. Currently PPG Aerospace is the sole qualified manufacturing source. The Government owns the specifications. New sources interested in becoming qualified must meet the requirements in the MQR and EDL that are attached. The EDL and Engineering Instructions are the same for all 6 NSNs. The Government's objective is to expand the qualified industrial manufacturing base by identifying and qualifiing additional sources. Anticipated Acquistion Strategy for the Follow-on Contract: The Government anticipates a follow-on Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated award timeframe of September 2027. The effort is planned for a 5-year ordering period supporting both USAF and Foreign Military Sales (FMS) requirements. The Government anticipates a monthly demand of approximately 40 to 50 quantities over the course of this timeframe. The acquistion is anticipated to include on-ramping provisions to allow newly qualified Contractors to be added to the multiple-award vehicle post-award once qualification requirements are satisfied. Keep in mind, this is subject to change... See the attached attachments attached to this Sources Sought for additional information concerning this Sources Sought. Requests for technical data must be requested through the points of contact below. Requests must include a copy of your JCP printout or DD 2345. If the POC requesting access is not identified on the DD 2345 or the JCP printout, it will be rejected. The requestor must be identified on the DD 2345 in order to be granted access. All interested foreign parties shall let the Contracting Officers (CO) know that they are a foreign party so that the COs can clear them access to the drawings through the foreign disclosure office (FDO). | Market Research | 336400 | No Set-Aside | 10/22/2026 | 02/16/2027 | - | |
SOURCES SOUGHT NOTICE: This is not a solicitation but rather a Sources Sought to seek new qualified and responsible manufacturers to produce spare F-16 parts in support of the United States Air Force (USAF). This is not a Request for Proposal (RFP) and does not construe as a commitment by the Government. Subject: F-16 Transparencies, NSN: 1560-01-462-2040, NSN: 1560-01-462-4551, NSN: 1560-01-497-5078, NSN: 1560-01-497-5956, NSN: 1560-01-497-5959, NSN: 1560-01-497-6599 The USAF is seeking out additional manufacturing sources capable of producing F-16 transparencies and interested in becoming qualified to do so. Currently PPG Aerospace is the sole qualified manufacturing source. The Government owns the specifications. New sources interested in becoming qualified must meet the requirements in the MQR and EDL that are attached. The EDL and Engineering Instructions are the same for all 6 NSNs. The Government's objective is to expand the qualified industrial manufacturing base by identifying and qualifiing additional sources. Anticipated Acquistion Strategy for the Follow-on Contract: The Government anticipates a follow-on Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated award timeframe of September 2027. The effort is planned for a 5-year ordering period supporting both USAF and Foreign Military Sales (FMS) requirements, with an estimated total ceiling of $85M. The acquistion is anticipated to include on-ramping provisions to allow newly qualified Contractors to be added to the multiple-award vehicle post-award once qualification requirements are satisfied. Keep in mind, this is subject to change... See the attached attachments attached to this Sources Sought for additional information concerning this Sources Sought. Requests for technical data must be requested through the points of contact below. Requests must include a copy of your JCP printout or DD 2345. If the POC requesting access is not identified on the DD 2345 or the JCP printout, it will be rejected. The requestor must be identified on the DD 2345 in order to be granted access. All interested foreign parties shall let the Contracting Officers (CO) know that they are a foreign party so that the COs can clear them access to the drawings through the foreign disclosure office (FDO). | Market Research | 336400 | No Set-Aside | 10/21/2026 | 02/16/2027 | - | |
SOURCES SOUGHT NOTICE: This is not a solicitation but rather a Sources Sought to seek new qualified and responsible manufacturers to produce spare F-16 parts in support of the United States Air Force (USAF). This is not a Request for Proposal (RFP) and does not construe as a commitment by the Government. Subject: F-16 Transparencies, NSN: 1560-01-462-2040, NSN: 1560-01-462-4551, NSN: 1560-01-497-5078, NSN: 1560-01-497-5956, NSN: 1560-01-497-5959, NSN: 1560-01-497-6599 The USAF is seeking out additional manufacturing sources capable of producing F-16 transparencies and interested in becoming qualified to do so. Currently PPG Aerospace is the sole qualified manufacturing source. The Government owns the specifications. New sources interested in becoming qualified must meet the requirements in the MQR and EDL that are attached. The EDL and Engineering Instructions are the same for all 6 NSNs. The Government's objective is to expand the qualified industrial manufacturing base by identifying and qualifiing additional sources. Anticipated Acquistion Strategy for the Follow-on Contract: The Government anticipates a follow-on Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated award timeframe of September 2027. The effort is planned for a 5-year ordering period supporting both USAF and Foreign Military Sales (FMS) requirements, with an estimated total ceiling of $85M. The acquistion is anticipated to include on-ramping provisions to allow newly qualified Contractors to be added to the multiple-award vehicle post-award once qualification requirements are satisfied. Keep in mind, this is subject to change... See the attached attachments attached to this Sources Sought for additional information concerning this Sources Sought. Requests for technical data must be requested through the points of contact below. Requests must include a copy of your JCP printout or DD 2345. If the POC requesting access is not identified on the DD 2345 or the JCP printout, it will be rejected. The requestor must be identified on the DD 2345 in order to be granted access. All interested foreign parties shall let the Contracting Officers (CO) know that they are a foreign party so that the COs can clear them access to the drawings through the foreign disclosure office (FDO). | Market Research | 336400 | No Set-Aside | 10/21/2026 | 02/16/2027 | - | |
SOLICITATION – F-16 Antilock Brake Sensor 1. REQUIREMENT OVERVIEW The Department of the Air Force (FA8203) is issuing Solicitation FA820326Q0015 for the procurement of: Noun: F-16 Landing Gear, Antilock Brake Sensor National Stock Number (NSN): 1630015253372LE This requirement supports Foreign Military Sales (FMS). The total potential procurement quantity is up to 64 Each. 2. NOTICE OF INTENT TO SOLE SOURCE The Government intends to negotiate and award a contract on a sole-source basis to the Original Equipment Manufacturer (OEM), Hydro-Aire Aerospace Corp (CAGE: 81982), or an authorized vendor. Hydro-Aire Aerospace Corp owns the proprietary rights for this NSN and has indicated that Blue Aerospace (CAGE: 1WZW9) is the only authorized vendor for this NSN. However, all responsible sources may submit a capability statement, proposal, or quotation by the closing date of this announcement, which shall be considered by the agency. If another source proves they are authorized and capable of providing the exact part, the Government may evaluate that source for this or future procurement actions. 3. RESPONSE DEADLINE All quotes and capability statements must be submitted via email no later than Friday, October 16, 2026, at 12:30 MDT. | Solicitation | 336413 | No Set-Aside | 10/05/2026 | 10/16/2026 | - |
Additional Details
Solicitation Number
FA821426RB004
Archive Date
Mar 5, 2027
Office Address
HILL AFB, UT, 84056-5837