AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
Cancelled on SAM.gov (notice posted August 27, 2026). Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM MDT
- Posted
- August 27, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8224 AFSC OL H PZIM
- Place of performance
- Hill Air Force Base, Utah, 84056
- PSC
- N041: INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA822426Q0003_1
- Notice ID
- 89c6f745733a4803a526b8423ab40f9d
Description
The purpose of this Amendment 0002 is to : Block 14 (Description of Amendment/Modification):
SUBJECT: CANCELLATION OF SOLICITATION
- This amendment is issued to formally cancel Solicitation FA822426Q0003_0002, "AMXG Group Air Compressors, Cooling System & Pump Stations Installation," in its entirety.
- This action is taken in accordance with FAR 14.404-1(c)(2), as the Government has determined that it is in the public interest to fulfill this requirement using in-house Government resources.
- No award will be made under this solicitation. The Government appreciates the time and effort of all offerors who submitted a quote.
- All other terms and conditions of the original solicitation are hereby rescinded.
The purpose of this Amendment 0001 is to: Block 14 (Description of Amendment/Modification):
1. Provide the Government's official responses to all contractor questions received.
2. Formally amend the Statement of Work (SOW) Section 2.1. The required Installation Completion Deadline is hereby changed from 12 August 2026 (as originally stated on the SOW) to 17 August 2026.
3. Incorporate the attached Question & Answer table.
All other terms and conditions of the solicitation remain unchanged. Offerors must acknowledge receipt of this amendment with their quotation.
Reference the newly attached supporting amemdment documents:
1. SF 1442
2. Attachment_1_SOW_AMXG26036(Amended)REVISED_24Jul2026.
3. FA822426Q0003_Amendment_0001
The Air Force is soliciting a 100% Small Business Set-Aside for a contractor to install and integrate a Government-furnished compressor and cooling system at Hill AFB, Utah.
Key Project Details:
-
The Work: The contractor will provide the labor, tools, and standard materials (piping, wiring, epoxy) to physically install two government-owned Ingersoll Rand compressors, dryers, and glycol coolers into Building 269 and connect them to the base's 460V power and air loop.
-
The Constraints: All primary machinery is Government Furnished Property (GFP). Facility drawings are Controlled Unclassified Information (CUI) requiring vetted SAM.gov access. Davis-Bacon prevailing wages apply.
-
Critical Deadlines:
-
Site Visit RSVP Deadline: 20 July 2026
-
Pre-Quote Site Visit: 23 July 2026
-
Contractor Q&A Deadline: 27 July 2026
-
Quotes Due: 05 August 2026
-
Mandatory Completion: On or before 17 August 2026 (Strict deadline to preserve the manufacturer's warranty).
-
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
Solicitation Amendment FA822426Q00030002 SF 30_Signed.pdf
261 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
SF1442.pdf
467 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment_1_SOW_AMXG26036(Amended)REVISED_24Jul2026.pdf
9.8 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA822426Q0003_Amendment_0001.pdf
2.0 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
2. Appendix A (AMXG26036 Piping Sketch & Drawings).png
51 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
RFQ_Solicitation_FA822426Q0003_Updated_71526.pdf
131 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
1. STATEMENT OF WORK_17 June 2026.pdf
112 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
3. Government Furnished Property (GFP) Attachment.pdf
34 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
4. Davis-Bacon Wage Determination (Davis County, UT).pdf
54 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
- 3Version 3Combined Synopsis/SolicitationArchived
AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
- 4Version 4Combined Synopsis/SolicitationArchived
AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
- 5Version 5Combined Synopsis/SolicitationArchived
AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
- 6Version 6Combined Synopsis/SolicitationArchived
AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
- 7Version 7Combined Synopsis/SolicitationCancelledArchivedCurrent
AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
Similar Opportunities
Additional Details
Solicitation Number
FA822426Q0003_1
Archive Date
Aug 20, 2026
Office Address
HILL AFB, UT, 84056-5805