GovChime
Notice ID: e4897147d5a44b9a8d3b08e31ffcb6afCombined Synopsis/Solicitation

DIGAR Low-Power Mode

Archived on April 14, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−06:00
Posted
February 26, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
NAICS
541715: Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE LIFE CYCLE MANAGEMENT CENTER.FIGHTER AND ADVANCED AIRCRAFT.FA8232 AFLCMC WWMK
PSC
AC12: NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH
Last updated
Aug 21, 2026

Identifiers

Solicitation number
FA8232-26-DIGA
Notice ID
e4897147d5a44b9a8d3b08e31ffcb6af

Description

DIGAR Low-Power Mode

  1. Action Code:                                                                              
  2. Date: 26 February
  3. Year: 2026
  4. Contracting Office ZIP Code: 84056
  5. Product or Service Code: AC12
  6. Subject: Engineering Investigation for DIGAR-200 Automated Flight Mode and Thermal Management enhancements for F-16 Integration
  7. Proposed Solicitation Number: FA8232-26-DIGA
  8. Closing Response Date: 30 March 2026
  9. Contracting Officer: Benjamin Price
  10. Contract Award and Solicitation Number: FA8232
  11. Contract Award Dollar Amount: $150,000
  12. Line Item Number: 2
  13. Contract Award Date: 30 April 2026
  14. Contractor: BAE Systems Inc.
  15. Description:
    1. NOTICE: This is a combined synopsis/solicitation as required by FAR 5.203(a)(2) & FAR 12.603. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Sub part 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only synopsis. Additionally, this proposed contract action is for services/supplies for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. The anticipated source for this procurement is identified as following:

BAE Systems Inc

7825 6th Street SW

 Cedar Rapids, IA 52404

              1.0 Synopsis

The Department of Air Force (DAF), F-16 System Program Office (SPO), is conducting market research to identify source capable of performing an engineering investigation to enhance the thermal management of the BAE Systems Inc. Digital GPS Anti-Jam Receiver (DIGAR)-200 for F-16 Integration.

The purpose of this effort is to address operational limitations where the DIGAR-200’s internal temperatures approach critical limits during extended ground operations. The Government seeks to formalize a thermal management strategy by implementing an autonomous, temperature-based mode-switching logic.

The Period of Performance is anticipated to be six (6) months from contract award. The Government will provide up to three (3) DIGAR-200 units as Government Furnished Material (GFM) for the investigation.

2.0 Core Requirements

The Contractor shall conduct an engineering investigation to validate and refine a thermal management logic based on the DIGAR-200’s internal temperature, using a Government-provided thermal survey and MIL-STD-810 as a baseline. Key objectives include:

  • Defining a Three-Band Thermal Logic: The investigation will finalize the precise temperature thresholds for:
    • GREEN Band: Full Anti-Jam (AJ) Mode.
    • YELLOW Band: Low-Power Mode (while maintaining continuous Positioning, Navigation, and Time (PNT) data).
    • RED Band: An autonomous Recovery “safe mode” that allows the system to cool and gracefully restart without an external power cycle.
  • Meeting Key Performance Goals: The proposed solution must be demonstrated through analysis to meet a combined 90-minute ground operational performance requirement. This scenario includes an uninterrupted 20-minute Pre-flight System Checkout in the GREEN Band, followed by 70 minutes of extended ground operations where the system must not enter the RED Band.
  • Principal Deliverable: The primary deliverable is a formal Engineering Investigation Report (EIR) containing thermal analysis, trade studies, risk analysis, and actionable recommendations for a potential follow-on implementation phase.

While the SOW provides a baseline technical approach, interested sources are encouraged to propose alternative or improved solutions that meet or exceed the Government’s performance objectives.

3.0 Separate Pass-Through Requirement

This effort also includes a separate, pass-through task for the one-time delivery of an existing production-coded Operational Flight Program (OFP) for the GEM VII-2 SAASM-EGI receiver card. This software is already developed, and this task is for delivery only.

4.0 Information Requested from Interested Sources

Interested parties are requested to submit a capabilities statement or white paper (not to exceed 10 pages) that demonstrates their ability to perform the work described. The response should include:

  1. Company Information: Company name, address, CAGE code, and primary point of contact (name, email, and phone number)
  2. Business Size/Status: Business size (Small or Large) and any applicable socio-economic categories (e.g., 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business, etc.)
  3. Relevant Experience: A summary of recent and relevant contracts or projects (within the last 5 years) that demonstrate experience with:
    • Avionics thermal analysis and management.
    • F-16 systems integration and MIL-STD-1553.
    • GPS/PNT Systems.
    • Software/firmware analysis for embedded systems.
  4. Technical Understanding: A brief discussion of your understanding of the challenges and your company’s potential approach to the investigation.

              PSC: AC12

The Government anticipated awarding a 500-hour T&M Contract to satisfy the requirement.

              CLIN 0001: Program Manager/Engineer Hourly Rate

              CLIN 0002: Data, NSP

Authority 10 U.S.C. 2304 (C)(1): Services required under this combined synopsis/solicitation are available from only one responsible source and no other type of services will satisfy agency requirements.

All responsible sources may submit a capability statement, proposal, or quotation, which will be considered by the agency.

Foreign contractor participation is not permitted at the prime contractor level.

The proposed contract action is one for which the Government intends to solicit and negotiate with only one source under the Authority of FAR 6.302-1. If your firm does not agree with this determination, please provide evidence of your firm’s capabilities and experience in providing the above services for evaluation. A decision by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.

  1. Place of Contractor Performance: BAE Systems Inc.
  2. Set-aside Status: None, Sole-Source
  3. NAICS Code: 541715

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationDEPT OF THE AIR FORCEFeb 26, 2026127.16 KB

Lifecycle

Solicitation:FA8232-26-DIGA
  1. Combined Synopsis
  1. Combined SynopsisCurrentFeb 26, 2026

    DIGAR Low-Power Mode

    Notice e4897147d5a44b9a8d3b08e31ffcb6af on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA8232-26-DIGA

Archive Date

Apr 14, 2026

Office Address

HILL AFB, UT, 84056-5820