Notice ID: ff72be1f24b74133b217238df0a3f376Special Notice

FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse

Responses closed . Full description on SAM.gov.

Overview

Response deadline
3:00 PM EST
Posted
November 3, 2026
Notice type
Special Notice
Set-aside
No Set aside used
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8501 OPL CONTRACTING AFSC/PZIO
Place of performance
Warner Robins, Georgia, 31098
Last updated
Nov 3, 2026
First published
Last updated on SAM.gov

Identifiers

Notice ID
ff72be1f24b74133b217238df0a3f376

Description

FA8501-27-RAPID-RPR RPL HVAC B301-OTA
Under the RAPID Umbrella Framework: UHHZ990029 RAPID RPR RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF 
(HEADHOUSE), BLDG 300 at Robins AFB, GA

Description
The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a.

The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to repair, modernize, and sustain critical HVAC and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia. The requirement includes replacement or modernization of end-of-life HVAC equipment; improvements necessary to provide reliable climate control and energy-efficient operations; and associated interior work to address accessibility barriers, lead-based paint, asbestos-containing flooring, degraded finishes, and workspace configuration. The supporting work is necessary to improve occupant safety, facility reliability, code compliance, and uninterrupted mission operations for Facility 300’s critical multi-tenant  organizations.

This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a.

Purpose
The purpose of this Area of Interest is to identify commercially viable, safe, resilient, and schedule-credible solutions to repair and modernize the heating, ventilation, and air-conditioning (HVAC) and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia.

The Government seeks an integrated approach that restores reliable environmental control; addresses end-of-life HVAC equipment; and supports remediation or modernization of affected interior conditions, including lead-based paint, asbestos-containing flooring, accessibility barriers, and degraded workspace configurations. The selected approach must sustain uninterrupted operations for Facility 300’s multi-tenant mission partners—including supply-chain management, network support, special operations/rotary-wing management, and C-5 cargo aircraft management—while improving energy performance, occupant safety, accessibility, maintainability, and compliance with applicable safety, energy, and Unified Facilities Criteria (UFC) requirements.

Solutions should provide a practical and phased path to execute the work with minimal disruption to occupied operations and with appropriate control of construction, environmental, safety, operational-continuity, and schedule risks.

The Government is interested in approaches that leverage commercial practices, innovative delivery methods, and demonstrable capabilities; any use of Other Transaction Authority (OTA) remains subject to confirmation of statutory authority, appropriate use criteria, and contracting/legal review.

Project Background and Existing Conditions
Facility 300 (constructed in 1942) is a critical multi-tenant facility supporting several key Department of War (DoW) missions, including the 448 SCMG (Supply Chain Management Group), 78 ABW IT (Zone 4/5 network support), LCMC/WIUW (Special Operations/Rotary management), and LCMC/WLS (C-5 cargo aircraft management). Sustainable, modern facility systems are essential to maintain uninterrupted operations for these critical national security and logistics missions. The building systems are severely degraded. The HVAC units have exceeded their lifecycle, resulting in frequent failures, high maintenance costs, and inadequate climate control. Walls have peeling lead-based paint, and degraded flooring under the carpet contains asbestos. The basement east section is currently inaccessible under ADA standards. This project repairs and modernizes Building 300 workspace to prevent safety hazards (slips/falls), optimize interior space configuration, improve occupant morale, and ensure compliance with energy, safety, and UFC codes.

The building 300 will remain in partial operation during the entire duration of the project.

Project Areas

OTA & RAPID Framework Approach
This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Build-Only execution approach under the standalone statutory authority of 10 U.S.C. § 2808a. Because the Government has provided a 100% completed design package and/or specific phasing and repair requirements, this project does not contain a collaborative design-builder phase. Instead, it transitions directly to rapid construction execution under an OTA structure to bypass administrative procurement lag.

Competitive Selection Process

Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration.

Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement.

Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 16 November 2026.

Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page via email to the designated point of contact listed.
Jimmy Ezzell – jimmy.ezzell.1@us.af.mil

Amelia Kelly - amelia.kelly@us.af.mil


The Solution Brief shall include:
A. Cover Page
     •  Company name
     •  UEI
     •  Mailing address
     •  Primary point of contact
     •  Email address and telephone number
     •  Identification of this RAPID AOI

B. Executive Summary
     •  Summary of the respondent’s qualifications and anticipated delivery capability;
     •  Identification of any material capability, staffing, access, bonding, or teaming assumptions.

C. Past Relevant Construction Experience

     •  Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on large commercial buildings and or Government facilities involving Repair/Replace of HVAC systems
     •  Focus: Historical performance in occupied facilities, managing congested site logistics, working in restricted areas (e.g., flightlines), and adhering to environmental and safety standards.

D. Team Composition and Organization
     •  Focus: Adequacy of the proposed organizational structure and the qualifications of Key Personnel (Project Manager, full-time Site Superintendent, Site Safety and Health Officer, and Quality Control Manager).

E. Construction Execution and Phasing Approach

     •  Focus: Technical understanding of the 100% Government-furnished design, methodology for physical work execution, utility outage coordination, and the realism of the proposed master schedule. The evaluation will assess the team's ability to provide continuous on-site leadership and effectively coordinate with Government personnel daily.

F. Financial Capacity and Bonding
     •  A statement of financial capacity to perform the anticipated work
     •  Current single-project and aggregate bonding capacity, if bonds are anticipated;
     •  Name of surety
     •  Any other information necessary to demonstrate capacity to perform the anticipated project.

Evaluation & Selection Criteria
The Government will utilize a two-step, Best-Value selection process mapped to the RAPID framework to select the Company. The evaluation process consists of:
               Step 1: RAPID Phase 1 Equivalent
               Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. 
               Price is not evaluated in Step 1.


               Step 2: RAPID Phases 2 & 3 Equivalent
               Interactive Pitch Presentations/Interviews and evaluation of the Price Proposal (short-listed teams only) to determine the                   final best-value selection.

Step 1: Statement of Qualifications (SOQ) Evaluation Factors (Phase 1 above)

Factor 1: Past Relevant Construction Experience
o Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on Government runway/ taxiway projects that entail repair or replacement or new construction
o Focus: Historical performance in occupied facilities, managing congested site logistics, working 
in restricted areas (e.g., flightlines), and adhering to environmental and safety standards.

Factor 2: Team Composition and Organization

o Focus: Adequacy of the proposed organizational structure and the qualifications of Key Personnel (Project Manager, full-time Site Superintendent, Site Safety and Health Officer, and Quality Control Manager).

Factor 3: Construction Execution and Phasing Approach
o Focus: Technical understanding of the 100% Government-furnished design, methodology for physical work execution, utility outage coordination, and the realism of the proposed master schedule. The evaluation will assess the team's ability to provide continuous on-site leadership and effectively coordinate with Government personnel daily.

Step 2: Pitch Presentation and Price Evaluation (Phase 2/Final Down-Select)

The Government will invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided 
with invitation to the pitch day.

Factor 1: Constructability Review and Risk Management (Presentation) Focus:
o Capacity to identify potential field conflicts, manage supply chain volatility, and mitigate risk (e.g., unforeseen site conditions, hazardous materials, weather delays) using the provided 100% design and phasing plan.

Factor 2: Collaborative Execution and Problem-Solving (Presentation/Q&A)
o Focus: Ability to work cooperatively with base stakeholders and the Project Delivery Team to resolve real-time field conflicts, safety incidents, or schedule recovery actions.

Factor 3: Financial Capacity and Bonding
o Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity.
o The estimated magnitude of construction associated with this Area of Interest (AOI) is $20M to $40M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity 
required to support the subsequent construction agreement

Final Selection and Award (Phase 3)
The Government will make a final best-value down-select decision. The Company to be awarded is the company’s whose combined technical qualifications, execution pitch, and price proposal represent the most advantageous offer to the Government. The Government reserves the right to have more than one final down selectee to request proposals if necessary.

The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA.

Government Reservations
The Government reserves the right to:
     •  Invite, not invite, or limit respondents advancing to later phases;
     •  Conduct technical exchanges;
     •  Request clarifications or supplemental information;
     •  Negotiate with one or more respondents;
     •  Modify, suspend, or cancel this Special Notice;
     •  Issue additional notices or requests; and
     •  Make no award.
Attachments
1. B300 HVAC Bay A & Headhouse OTA_RUNWAY REPAIR SOO
2. UHHZ990029 Complete set of drawings
3. UHHZ990029 HAZMAT report
4. UHHZ990029 Updated Specifications
5. UHHZ990029 Submittal Register

Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization:
While the immediate requirement under this AOI is the HVAC at Bay A and the Headhouse at Building 300, offerors are advised that participation and successful evaluation under this AOI may provide significant strategic opportunities beyond the initial project.
 

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (7)

  • AOI_ FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BAY A and HEADHOUSE_110326.pdf

    254 KBAdded in Special Notice version 3Posted
    Download
  • 7. UHHZ990029 - Submittal Register.pdf

    469 KBAdded in Special Notice version 2Posted
    Download
  • 3b. UHHZ990029 - Corrected Final Specifications.pdf

    8.7 MBAdded in Special Notice version 2Posted
    Download
  • 3c. UHHZ990029 - HAZMAT Report.pdf

    8.4 MBAdded in Special Notice version 2Posted
    Download
  • 3a. UHHZ990029 - Complete Set of Drawings.pdf

    67 MBAdded in Special Notice version 2Posted
    Download
  • 2. UHHZ990029 - OTA SOO.pdf

    233 KBAdded in Special Notice version 2Posted
    Download
  • RAPID- Robins.pdf

    375 KBAdded in Sources Sought version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Sources Sought

    Robins RAPID Construction OTA Umbrella Notice

    Notice 8bd0389eea4c4ab4a02cccae6c55d91c on SAM.gov

  2. 2
    Version 2Special Notice

    Type changed from Sources Sought to Special Notice

    FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse

    Notice 71eb0984aee248d8809e4eb7953a00c4 on SAM.gov

  3. 3
    Version 3Special NoticeCurrent

    FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse

    Notice ff72be1f24b74133b217238df0a3f376 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a new requirement that will be awarded as a brand name competitive full and open contract. The contractor shall provide technical drawings, technical expertise, telephone support, on-site engineering support, liaison services for warranty management, and the training necessary to enable the Government to maintain and repair 100-ton HVAC system (Carrier), Human Machine Interface (HMI) control panel and exterior safety door located at Building 670 within the 402nd Commodities Maintenance Group (CMSX) at Robins Air Force Base. The proposed nine-month period of perfromance is expected to be 28 Dec 2026 to 24 Sep 2027. See PD Paragraph for full details on HVAC, HMI control panel, and exterior safety door.
-Combined Synopsis11/12/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items as supplemented with additional information included in this notice. This announcement and the attached Request for Quotation FA527026QB003 constitute the only solicitation being issued; the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Regulation. The associated North American Industrial Classification System (NAICS) code (238220) and applicable size standard for this procurement is listed in Block 10 on the face page of the attached RFQ. The United States Air Force – 18th Contracting Squadron, Kadena AB Japan (Okinawa) intends to award a Single Award, Requirements type Contract for HVAC MAINTENANCE SERVICE for Defense Communications Detachment Okinawa (DCDO) in Okinawa, Japan. This requirement will be for full and open competition. The period of performance for this contract will be 1 December 2026 – 30 November 2031. Attachment 4 - Directions to DCDO will be provided upon request. Please see the attached RFQ for additional details, and other terms and conditions. Amendment 0001 - amendment FA527027QB0030001 has been posted. The purpose of this amendment is to add a requirement for the submission of the certification to Addenda to FAR 52.212-1 IInstructions to Offeror - Commercial Items (Sep 2023) Amendment 0002 - amendment FA527027QB0030002 has been posed. The purpose of this amendment is to remove FAR 52.217-3, FAR 52.212-4 Alternate I, FAR 52.232-19, and FAR 52.228-3. Amendment 0003 - amendment FA527027QB0030003 has been posed. The purpose of this amendment is to extend the RFQ due date from 26 Oct 2026 to 28 Oct 2026. Amendment 0004 - Questions and Answers is posted.
-Combined Synopsis10/28/2026
The 502d Contracting Squadron (502CONS), on behalf of the 502d Civil Engineer Squadron (502CES), is conducting market research to determine: The availability and technical capability of industry sources (small and large businesses) to furnish and install 48 each 1.25-ton Dedicated Outside Air System (DOAS) Water-Source Heat Pumps (WSHP) which meet strict salient dimensions and environmental characteristics. The appropriate competitive acquisition strategy, including small business socio-economic set-aside determinations (RFO Part 19 Small Business - Rule of Two). Standard commercial practices, lead times, supply chain constraints, warranty terms, and pricing structures IAW RFO 10.002(b) Market Research. The contractor shall provide all personnel, management, equipment, tools, rigging, materials, and supervision necessary to execute the turnkey removal and replacement of 48 ceiling-suspended DOAS WSHP installed above exterior breezeway ceilings in B3631 and B3635 at JBSA Ft Sam Houston (FSH) San Antonio Military Medical Center (SAMMC) Dormitory Annex. This new requirement is projected to be a Firm-Fixed Priced (FFP) Purchase Order as a Commodity (Procurement) with incidental Services (Removal and Installation) buy. Key Salient Characteristics: Capacity: 1.25 Tons (15,000 BTUH nominal), airflow of 160 L/s (~340 CFM) at 50 Pa ESP. Configuration: Horizontal, ceiling-plenum suspended, right-hand return air arrangement. Access Dimension Constraint: Existing units are installed above metal panel breezeway ceilings accessible through structural door openings measuring approximately and replacement units must physically fit through these envelope openings without requiring structural building demolition. Refrigerant: Low-GWP refrigerant (e.g., R-454B or R-32). R-410A is strictly prohibited. Hydronic Pre-Heat Coil & Reheat: Integral 3.75 kW water-source pre-heat coil (3-way, 2-position control valve) and factory hot gas reheat (HGRH) / hot gas bypass (HGBP) for 100% outside air continuous dehumidification. Controls Integration: Complete integration into the installation's central Building Automation System (BAS via BACnet IP/MSTP).
-Market Research10/26/2026
Construct and install two maintenance pads to house all condensing units and provide single line as built drawings, install a two sided screen block at the front of the building matching the existing CMU block color and style, use solid and vented CMU blocks to ensure sufficient airflow around all condensing units, and build screen block walls two rows higher than the condensing units; the contractor shall supply a weatherproof 120V maintenance receptacle for each pad, core drill the existing wall of Building 119, install a 3 inch PVC pipe sealed with acoustical seal to maintain ICD 705 compliance per Tech Spec 1.5.1, install insulation on all line sets entering Building 119, run all electrical from Room 119s electrical mechanical room using panel EDH 1 3 rated at 480/277V and 800 amps, tie all new HVAC systems to the existing generator for backup power, surface mount electrical conduits in Room 119 and the exterior HVAC yard, run conduits underground to each maintenance pad, and supply a weatherproof disconnect for each condensing unit; the contractor shall install new cassette type HVAC systems in Rooms 112, 113, 114, and 132 using the existing suspended ceiling grid with added support, provide a 1 ton HVAC system with a separate controller for Room 112, provide 2 ton HVAC systems with separate controllers for Rooms 113 and 114, and provide a 4 ton HVAC system with a separate controller for Room 132; all design and construction shall comply with the current International Building Code, UFC standards, all applicable public laws, executive orders, CFR requirements, DOD instructions and directives, Nellis ID2 standards, and Clark County, Nevada, and federal codes and laws, and any discrepancies between codes or standards and contract documents shall be immediately reported to the Contracting Officer, with the more stringent requirement applying unless otherwise directed. 26 WPS request this HVAC installation and testing be accomplish within, 160 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/4/2026 at 0830 AM PDT, meeting in front of building 119 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/24/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/18/2026 at 2:00 PDT. Answers will be provided via a solicitation amendment.
-Solicitation08/20/2026
*****Amend 0003 - The purpose of Amend 0003 is to revise the requirement removing temporary cooling and to extend the quote due date to 7 July 2026 at 10:00 AM EDT.***** *****Amend 0002 - The purpose of Amend 0002 is to include Attach 8 - RFIs with Answers and Attach 9 - Attachment to RFI Answers. The quote due date is extended to 24 June 2026 at 10:00 am EDT. ***** *****Amend 0001 - The purpose of Amend 0001 is to incorporate photos from the Site Visit as Attach 7 - Site Visit Photos. ***** The 911th Airlift Wing, Air Reserve Station (ARS) has a project to replace the chiller in Building 418 in Coraopolis, PA. Solicitation FA671226Q0010 is issued as a Request for Quote (RFQ). ***This is the re-release of FA671226Q0003.*** The solicitation document, with the incorporated clauses and provisions, will be issued in accordance with the Federal Acquisition Regulation (FAR) Parts 12 and 36 and will be incorporated in the awarded firm-fixed price contract. Interested vendors should reference the solicitation documents for all terms and conditions. All interested and eligible parties are responsible for monitoring this website to ensure they have the most current information (i.e. Amendments) for the solicitation. No paper solicitation will be available. Procurement is solicitation as a one hundred percent (100%) Small Business set-aside. The solicitation will result in a Firm-Fixed Price (FFP) contract. The North American Industry Classification System (NAICS) code is 238220 with a small business size standard of $19 Million. The magnitude of construction for this procurement is estimated to be between $250,000 and $500,000. Site Visit: An organized site visit will be held at the project location. See solicitation for details. In order to attend the site visit, you are required to pre-register. Attendance at the site visit will be limited to no more than two (2) representatives per company. The site visit will be held for the purpose of providing contractors with the opportunity to familiarize themselves with the site which may be helpful in the preparation of offers. Attendance at the site visit is not mandatory for offer submission; however, failure to visit the site will not relieve or mitigate the successful contractors responsibility and obligation to fully comply with the terms, conditions, and specifications contained and/or referenced in this document. Telephone requests for information will not be accepted or returned. In order to submit an offer on this project, your company must be registered in the System for Award Management (SAM) and maintain an active registration. Please see the attached solicitation and supporting documents.
-Combined Synopsis07/07/2026

Additional Details

Solicitation Number

FA8501-27-RAPID-990029_RPR_RPL_HVAC_SYSTEM_BLDG_300

Archive Date

Dec 1, 2026

Office Address

ROBINS AFB, GA, 31098-1672