Notice ID: ee31f85e6143414cae8caffe7a53b60dCombined Synopsis/Solicitation
MAKINO T1 PALLETS
Archived on September 30, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- September 8, 2023
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 333248: All Other Industrial Machinery Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA8571 MAINT CONTRACTING AFSC PZIM
- Place of performance
- Warner Robins, GA, 31098
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- FA857123Q0133
- Notice ID
- ee31f85e6143414cae8caffe7a53b60d
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This solicitation is being conducted under Simplified Acquisition Procedures (SAP) as a Request for Quote (RFQ) No. FA857123Q0133. This requirement is being solicited as sole source IAW FAR 13.106-1(b)(1) to OEM below. Contractor name: Technical Equipment Sales, LLC Address:10165 International Blvd Cincinnati, OH 45246 Cage Code: 6B653 Type Business: Large This requirement is being solicited as sole source under NAICS 333248 with size standard of 750 Number of Employees. Please submit quote via email to Elijah Maurice at elijah.maurice@us.af.mil no later than 15 September 2023 at 2:00 PM EST. Please be sure to include all cost associated with this purchase including, but not limited to: shipping and any other costs related to this acquisition. Price adjustment will not be made at time of award for any additional fees. Please see attachments for details.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
FA857123Q0133- Combined Synopsis
- Combined SynopsisCurrentSep 8, 2023
MAKINO T1 PALLETS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
See solicitation and it's attachments | - | Solicitation | 11/19/2026 |
The 76th CMXG Maintenance Group is looking for an AMT Equipment Maintenance and shall meet the specifications refereced below and in the attachment. 1. Period of Performance: The Contractor shall provide a Base Year and 2 Option Years 2. AMT HyperCare Maintenance Agreement (Applicable to: SF100, S/N: 4149003000751): This plan shall include, at a minimum: a) Support Help Desk Access: Direct access to AMT's expert support team for troubleshooting. b) Unlimited Service Visits: Covers all service visits due to machine errors (operator errors are excluded). c) Unlimited Parts Replacement: Covers replacements for parts that fail due to machine error. d) Ancillary Coverage: Coverage extends to included ancillary systems. e) Yearly Preventative Maintenance (PM): Schedule and perform one (1) comprehensive on-site PM inspection and optimization visit per contract year. 1) Annual Carbon Filter Replacement: Supply and install replacement carbon filters during the scheduled annual PM visit to maintain safety and efficiency 2) The Contractor shall provide a copy of the annual preventative maintenance (PM) schedule to the Government Point of Contact (GPOC) within ten (10) business days after contract award. 3) The Contractor shall notify the GPOC at least seven (7) business days prior to the actual scheduled PM visit to coordinate on-site arrival and base access. f)The Contractor shall be responsible for ensuring all services, replacement parts, and OEM components provided under this contract conform to the manufacturer's equipment specifications and are in accordance with (IAW) the terms and conditions outlined in this SOW. g) The Contractor must meet all requirements outlined IAW this SOW. h) The Contractor shall make all necessary adjustments to the work performed under the AMT Equipment Maintenance Service Agreement until the item/s are fully operational IAW the Original Equipment Manufacturer (OEM) specifications and to what is stated in this SOW. 3. One-Time PM Reinstatement Kit (Base Year Only) SF100, S/N: 414900300075 is currently out of warranty, Contractor shall provide all parts and labor required to allow equipment to be put on Hypercare Maintenance Agreement. | - | Market Research | 10/30/2026 |
The Warner Robins Air Logistics Center (ALC) is hosting an Industry Day on 9 December 2026, to solicit feedback from interested industry representatives regarding an initiative by AFLCMC/ROZ to sustain the Halvorsen Aircraft Loader (ACL) system. If your company is interested in participating in the Industry Day, please review the attached invitation which provides more details. ATTACMENTS: Industry Day Invitation DRAFT Performance Work Statement (PWS) | - | Special Notice | 12/02/2026 |
* UPDATE 7 October 2026* Extend the response due date to 5 November 2026 5:00 PM EST *UPDATE* 30 September 2026 - Add Attachment 6 - DRAFT PWS - Update retrieval instructions for Attachment 2 - Technical Manual Operations Instructions (Please see attachment section below for retrieval instructions) 24 September 2026 This market survey is being conducted to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for qualification laid out in the PWS of the Halvorsen 25k Aircraft Cargo Loader for use by United States Air Force (USAF) personnel. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey. *All responses are due by 5 November 2026* *Please note all of the attachments will not be attached. Please see below for instructions: ATTACHMENTS: Attachment 1: THPO Report Attachment 2: Technical Manual Operations Instructions (please see page 2, instruction #5 on Sources Sought Synopsis to request this attachment) Attachment 3: Technical Manual Work Package Operator and Maintenance Instructions (please see page 2, instruction # 5 on Sources Sought Synopsis to request this attachment) Attachment 4: Halvorsen OIM 623-4300-OI, 2019 (please see page 2, instruction #5 on Sources Sought Synopsis to request this attachment) Attachment 5: Halvorsen Follow-On Sources Sought Synopsis Attachment 6: DRAFT Performance Work Statement (PWS) | - | Market Research | 11/05/2026 |
This RFQ is being issued to solicit a firm-fixed-price quote for the turn-key fabrication, installation, testing, and integration of a certified Fall Protection/Fall Arrest System (FAS) for C-130 programmed depot maintenance (PDM) operations in Building 91 (Option Requirement, encompassing Bay 7 Option), including the design revision, fabrication and delivery of the engineered Mobile Rainbow Fitting Stand. EXP is requested to provide a proposal engineering, materials, parts, tools, equipment, labor, shipping, travel, and supervision required to engineer, fabricate, install, and certify a complete Fall Protection System (FAS) in Building 91 Bay Option Complete turnkey package for Bay 7: Site Visit, dock-specific structural engineering design, fabrication/procurement, delivery, installation, integration, testing, and final documentation. In conjunction with the FAS installation, the Contractor shall revise the design drawing, fabricate, test, to the current engineered Mobile Rainbow Fitting Stand as well as any other stands called out under this contract as specified and be constructed in accordance with drawing specifications (dated 27 October 2026) incorporating the following mandatory redline modifications. | - | Combined Synopsis | 11/10/2026 |
Additional Details
Solicitation Number
FA857123Q0133
Archive Date
Sep 30, 2023
Office Address
ROBINS AFB, GA, 31098-1672