GovChime
Notice ID: 49f8a5bde6b54c149c3c05e52a04eca9Special NoticeArchived

Notice of Intent to Award a Sole Source: F20643-318 AFIT CE Furniture & Flooring Phase 2

Archived on February 10, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM EST
Posted
January 12, 2026
Notice type
Special Notice
NAICS
337214: Office Furniture (except Wood) Manufacturing
Agency
Department of WarDepartment of the Air Force

Notice details

Place of performance
Wright Patterson AFB, Ohio, 45433
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA860126Q0005
Notice ID
49f8a5bde6b54c149c3c05e52a04eca9

Description

The Air Force Life Cycle Management Center (AFLCMC/PZIBA), on behalf of the Air Force Institute of Technology (AFIT/CE), intends to award a sole-source, firm-fixed-price contract to Space and Asset Management Inc. dba Elements IV Interiors, 3680 Wyse Rd, Dayton, OH 45414, for the procurement and installation of systems furniture and flooring at Wright-Patterson Air Force Base, Ohio.

The requirement is for all supplies, labor, and services necessary to complete Phase 2 of a workspace modernization project. This is a follow-on project that requires new workstations to be physically compatible and fully interchangeable with the existing Haworth furniture system installed during Phase 1. The Government's market research indicates that Haworth products utilize proprietary physical connections, and no other manufacturer produces a compatible system that can meet the Government's essential need for a single, integrated, and reconfigurable workspace.

In accordance with FAR 5.207(c)(15), the justification for the lack of competition is that the required proprietary product is only available from a single authorized source. Therefore, this acquisition is being conducted under the authority of Federal Acquisition Regulation (FAR) 6.302-1.

Submission Instructions and Points of Contact:

Interested parties who believe they can satisfy the requirements must provide a capability statement with clear and convincing evidence of their ability to do so. The statement must demonstrate the vendor's capability to provide systems furniture that is 100% physically compatible and interchangeable with the existing Haworth system, including its proprietary connections. A simple statement of capability is not sufficient.

All responses, questions, and capability statements shall be submitted via email to the following points of contact no later than January 26, 2026, at 11:00 AM Eastern Time.

  • Contract Specialist: Brian Algeo, brian.algeo.1@us.af.mil
  • Contracting Officer: Candice Snow, candice.snow@us.af.mil

All correspondence sent via email must contain the subject line: “FA8601-26-Q-0005, F20643-318 AFIT CE Furniture & Flooring Phase 2.” Be advised that emails without this exact subject line or with prohibited attachments (.zip, .exe) may be blocked by network filters. Acceptable attachment formats are .PDF, .doc, and .xls.

This notice is not a request for competitive proposals or quotes. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.

Attachments:

  1. Statement of Work (SOW)
  2. Sole Source Justification (SSJ) Redacted

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (2)

  • SSJ-Single Source Justification-F20643-318 AFIT CE Furniture.Flooring ph2_Redacted.pdf

    593 KBAdded in Special Notice version 3Posted
    Download
  • Attachment 1 - SOW - F20643-318 AFIT CE Furniture-ph2.pdf

    374 KBAdded in Special Notice version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Special NoticeArchived

    Notice of Intent to Award a Sole Source: F20643-318 AFIT CE Furniture & Flooring Phase 2

    Notice 505cff3208dc411599949f65d036946a on SAM.gov

  2. 3
    Version 3Special NoticeArchivedCurrent

    Notice of Intent to Award a Sole Source: F20643-318 AFIT CE Furniture & Flooring Phase 2

    Notice 49f8a5bde6b54c149c3c05e52a04eca9 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Purpose of requirement is to supply Bldg. 2213 with office furniture in support of the 309th MMXG.
74%
Solicitation11/06/2026
Furniture
67%
Combined Synopsis09/16/2026
Office Furniture
67%
Combined Synopsis08/31/2026
Amended to add 7 days to solicitation. Office Furniture
67%
Combined Synopsis08/27/2026
Amended to include total small business set aside code. Office Furniture
67%
Combined Synopsis08/13/2026

Additional Details

Solicitation Number

FA860126Q0005

Archive Date

Feb 10, 2026