GovChime
Notice ID: cb5d9146896346bca640b01489fc8b7cSources Sought

COBRA DANE Recompete Follow-On

Archived on May 9, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−06:00
Posted
March 24, 2026
Notice type
Sources Sought
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA8723 SSC BCK-CO
Last updated
Nov 2, 2026

Identifiers

Solicitation number
FA8723-26-R-B00X
Notice ID
cb5d9146896346bca640b01489fc8b7c

Description

This contract will provide non-personal services to manage, operate, maintain and sustain the COBRA DANE radar system at optimum performance levels identified in an approved COBRA DANE System Requirements Document (SRD), 24 hours/day, 365 days/year, in support of multiple national radar missions including Missile Defense and Space Domain Awareness. The contractor will provide operations and support of site equipment and facilities in accordance with the referenced Performance Work Statements (PWSs) to meet AN/FPS-108 sensor function on a continuous basis. Further, the Contractor shall continue to operate and maintain the system in the event of a national emergency, to include declared or undeclared state of war. The Contractor will be the primary system integrator, and will also provide depot spares management, logistic support and Depot Maintenance Support Activity (DMSA). The Contract Overarching Scope provides scope for on-site operations of the COBRA DANE AN/FPS-108 radar and associated systems to satisfy contract requirements. Individual Task Orders (TOs) or Delivery Orders (DOs) will identify the specific tasks. This contract provides scope for on-equipment Organizational Level (O-Level) maintenance; off-equipment evaluation and troubleshooting maintenance services at the appropriate levels; operations support services; travel services for personnel traveling for temporary additional duty (TAD) or temporary duty (TDY); transportation for personnel and packaging, handling, shipping and transportation (PHS&T) for moving equipment and supplies; coordination with and information to the EAS Base Operations Support (BOS) contractor; Depot Level (D-Level) maintenance; maintenance support for Unprogrammed Depot Maintenance; management of all aspects of the contract; quality control activities, ensuring the performance of products, subcontractors and vendors; entering into Associate Contractor Agreements (ACAs); integrated systems engineering and sustaining engineering support; integrated product support; cybersecurity support; acquire, format, assemble, reproduce, package, ship, manage, provide and store all required deliverable data as specified in the contract and/or TO/DO requirements document(s) as applicable; execute data repository services; training services, devices, accessories, aids, equipment and parts used to facilitate instruction through which personnel will learn to operate and maintain the COBRA DANE AN/FPS-108 radar and associated systems; Systems Integration Lab services; obtain and/or validate engineering data on the performance of hardware, software and firmware changes; procure spares, warranties and licenses for hardware, software and firmware, communications networks and infrastructure associated with hardware and software modifications; equipment replacement and repair; demilitarization and disposal; plan, organize, direct, coordinate, execute, control, approve, document and report on all assigned actions to execute projects the Government establishes by issuing TOs/Dos; and transition phase-in and phase-out. The System Requirements Document (SRD) Appendix B document may be provided upon request.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 4 of 4 items

Document
Source
Agency
Posted Date
File Size
Actions
Sources SoughtDEPT OF THE AIR FORCEMar 24, 202622.66 MB
Sources SoughtDEPT OF THE AIR FORCEMar 24, 2026165.13 KB
Sources SoughtDEPT OF THE AIR FORCEMar 24, 20263.02 MB
COBRA DANE OPERATIONS AND MAINTENANCE PERFORMANCE WORK STATEMENT.pdf
Sources SoughtDEPT OF THE AIR FORCEMar 24, 202625.31 MB

Lifecycle

Solicitation:FA8723-26-R-B00X
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. 2×
    Market ResearchCurrentMar 24, 2026

    COBRA DANE Recompete Follow-On

    Notice cb5d9146896346bca640b01489fc8b7c on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA8723-26-R-B00X

Archive Date

May 9, 2026

Office Address

PETERSON AFB, CO, 80914-2900