GovChime
Notice ID: 18cbdee1150c420db63a5eb11f2f81c9Combined Synopsis/SolicitationArchived

RFQ for Title II for Repair Jones Hall at Keesler AFB

Archived on July 28, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM CDT
Posted
June 25, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
NAICS
541330: Engineering Services
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AF INSTALLATION & MISSION SUPPORT CENTER.FA8903 772 ESS PK
Place of performance
Biloxi, Mississippi, 39534
PSC
C219: ARCHITECT AND ENGINEERING- GENERAL: OTHER
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA890326R0069
Notice ID
18cbdee1150c420db63a5eb11f2f81c9

Description

This RFQ notice is for the AE NEXT POOL 4 contractors for the Title II Services for Repair Jones Hall B6902 at Keesler AFB, MS requirement. Title II includes on-site Quality Assurance inspections, review and drafting Government responses for all construction submittals and RFIs, validating contractor schedules and earned-value progress, evaluating Time Impact Analyses and proposed PoP changes, and supplying professional A-E and cost-estimating support to ensure the construction contractor complies with the Statement of Work (SOW), specifications, and project requirements in support of the Governments planned Repair Jones Hall B6902 at Keesler AFB, MS. 

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (22)

  • SOW_Title_II_09022026.pdf

    252 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • RFQD-TII-Jones Hall - 17 Jun 2026.pdf

    301 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix A - Air Force Facilities Sustainability Requirements Scoresheet.xlsx

    542 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Appendix B - Air Force Sustainable Design and Development (SDD) Implementing Guidance.pdf

    669 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix C - Keesler AFB Installation Facilities Standards (IFS).pdf

    50 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix D - Keesler AFB Premise Wiring Guidance.pdf

    1.6 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix E - SWPPP Guidance Manual.pdf

    1.3 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix F - Keesler Architectural Compatibility Guide (ACG).pdf

    1.6 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix G - Jones Hall B6902 DD Form 1391.pdf

    321 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix H - Jones Hall SID Binder.pdf

    58 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix H - Jones Hall RLF Drawings Vol 1 of 2.pdf

    26 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix H - Jones Hall AFB Drawings Vole 2 of 2_optimized.pdf

    154 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix I - Jones Hall B6902 As-Built.pdf

    15 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix J - Jones Hall B6902 100 percent Specifications.pdf

    36 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix K - Jones Hall B6902 Hazardous Material Survey.pdf

    18 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix L - Arnold Hall B5901 Drawings.pdf

    5.0 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix M - Arnold Hall B5901 Restroom As-Builts.pdf

    673 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix N - Arnold Hall B5901 Specifications.pdf

    1.6 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix O - Arnold Hall B5901 Hazardous Material Survey.pdf

    9.0 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix P - Arnold Hall B5901 Asbestos Inspection Report.pdf

    465 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix Q - Jones Hall B6902 Hazardous Materials Report.pdf

    18 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Appendix R - Premise Wiring Guidance.pdf

    1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    RFQ for Title II for Repair Jones Hall at Keesler AFB

    Notice 553444ab21774454830dd086db8029fd on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    RFQ for Title II for Repair Jones Hall at Keesler AFB

    Notice 18cbdee1150c420db63a5eb11f2f81c9 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA890326R0069

Archive Date

Jul 28, 2026

Office Address

JBSA LACKLAND, TX, 78236-9861