Aerospace Systems Technical Research & Operations Support Services II (ASTROS II)
Archived on July 10, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM PDT
- Posted
- June 16, 2026
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- NAICS
- 541330: Engineering Services
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE TEST CENTER.FA9300 AFTC PZR
- Place of performance
- California, 93524
- PSC
- AC35: NATIONAL DEFENSE R&D SVCS; DEFENSE-RELATED ACTIVITIES; R&D FACILITIES & MAJ EQUIP
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA930027R6000-RFI02
- Notice ID
- 382b028cc2694f5c99ced6bb5255dbb6
Description
RELATED NOTICE: This RFI #2 is a continuation of market research initiated under RFI #1 (Notice ID: [FA930027R6000]), which is currently closed/inactive.
For the purposes of this Request for Information (RFI), this requirement is temporarily designated as 'ASTROS II.' The Government advises interested parties to track this requirement via the SAM.gov Notice ID, as the official program name is subject to change prior to the issuance of a formal solicitation.
AFRL Det 7/SST is conducting market research to provide follow-on capability to evaluate, engineer, reconfigure, modify experimental research test equipment, stands [(Property, Plant, & Equipment) PP&E] and systems, perform research and development test operations and test operation support, maintain special test equipment and support infrastructure as required.
The tasks associated with this requirement, also captured in paragraph 4 of the attached Draft PWS, demand specialized knowledge of all aspects of rocket propulsion testing. The scale of testing ranges from small bench-scale liquid engine components and tactical motors to launch booster-class engines and strategic rocket motors. Practical knowledge regarding all intermediate devices including combined cycle designs, spacecraft propulsion, and space and missile propulsion system component testing will also be required. These tasks require a holistic working knowledge of the systems to ensure successful design, integration, test and data collection of integrated advanced propulsion systems and their associated equipment (PP&E) to include, but not limited to steam and mechanical-driven altitude test systems, thrust measurement systems, instrumentation and control systems, equipment deluge and fire retardation systems, special test equipment, additional support infrastructure. Incidental alterations to Real Property (e.g., utility tie-ins, pad penetrations, structural mounting) are authorized only when inextricably linked to, and necessary for, the primary engineering modification of the PP&E test stands. All such ancillary Real Property alterations must be approved by the Contracting Officer and EAFB Civil Engineering. The contractor shall engineer, integrate, modify, activate, operate, and deactivate fuel and oxidizer propellant systems for toxic, storable, hypergolic, cryogenic, high pressure, explosives, and hydrocarbon propellant system assets. In addition, the contractor shall handle, transport and store these propellants and explosives.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (1)
- Download
ASTROS II RFI Version 3 Package_v3.pdf
1.5 MBAdded in Sources Sought version 3Posted
Lifecycle
- 1Version 1Sources SoughtArchived
Aerospace Systems Technical Research & Operations Support Services II (ASTROS II)
- 3Version 3Sources SoughtArchivedCurrent
Aerospace Systems Technical Research & Operations Support Services II (ASTROS II)
Similar Opportunities
Additional Details
Solicitation Number
FA930027R6000-RFI02
Archive Date
Jul 10, 2026
Office Address
EDWARDS AFB, CA, 93524-1185