Notice ID: b37235562b2941ca96c5e97171325e1eSolicitation
Spectrum Beacon Tower
Archived on July 22, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM UTC−04:00
- Posted
- June 30, 2021
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA9301 AFTC PZIO
- Place of performance
- Edwards, CA, 93524
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- FA930121R0003
- Notice ID
- b37235562b2941ca96c5e97171325e1e
Description
The purpose of this amendment is to update the SOW, RFI answers, and extent the proposal response due date to 07 July at 4:00 PM PST. The purpose of this amendment is to extend the response due date from 24 June 2021 at 4:00 PM PST to 02 July 2021 at 4:00 PM PST. The purpose of this amendment is include the revised Statement of Work (SOW) at Attachment 1, include solicitation Amendment, pictures, approved drawings, and RFI Answers, and to extend the proposal due date to 24 June 2021 at 4:00 pm. ACQUISITION INFORMATION: Edwards AFB, CA has a new requirements to replace the outdated and aging beacon tower which has reached the end of its serviceable life. The project is to replace the outdated and aging beacon tower which has reached the end of its serviceable life. The current tower is a 108-foot self-supporting, four-legged beacon tower that was constructed in 1959 and is beyond its useful life. The new self-supporting, (aka Spectrum Beacon), tower will allow the 412th Communications Squadron and AF Plant 42 to better manage the agencies use of radio frequency spectrum management to perform vital operations that supports our mission. Improved Spectrum management will provide the technical engineering expertise needed to perform specific spectrum resources assessments and will create an efficient and more effective conflict resolution capability. The tower MUST NOT exceed 180 feet (AGL) in height then external protuberance (antennas, lightning rod and/or other accessories) are attached to the top of the structure. Additionally, the Contractor is to perform the deconstruction, demolition and disposal of the previous Beacon Tower. This description of work is for general information only. It is not our intention to describe every feature of items of work or to define the scope of work. The solicitation will be a Request for Proposal (RFP), Lowest Price Technically Acceptable (LPTA) source selection process. The proposed project is a Total Small Business SET-ASIDE. This is a source selection where best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-price factors. The NAICS Code for this project is 237130. The magnitude of this project is between $500,000.00 and $1,000,000.00. The performance period will be 180 days after the Notice to Proceed is issued. The responsible offeror must be registered in sam.gov to receive an award. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
FA930121R0003- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 4×SolicitationCurrentMay 17, 2021
Spectrum Beacon Tower
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Attached is a list of attendees to the Pre-Proposal Conference held on March 21, 2013 for DE-SOL-0005262. No amendment is necessary. This is for information only | 42% | Special Notice | Open |
AMENDMENT 0017, issued on 2/12/26, requests FPRs from Phase Two Offerors ONLY. AMENDMENT 0016, issued on 2/12/26, Closes Discussions. AMENDMENT 0014, issued on 1/26/26, Opens Discussions with Phase Two Offerors ONLY. Please note that Phase Two is only open to Offerors who successfully qualified during Phase One of the subject solicitation. This acquisition will result in an unrestricted full and open Firm-Fixed-Price (FFP) Design-Build (DB) contract for the design and construction of Design-Build (DB) P-1241 Low Altitude Radio Communication System (LARCS) Communication Towers for Marine Air Ground Task Force Training Command (MAGTFTC) Twentynine Palms, California. The project scope constructs new communication towers and restores and modernizes existing communication towers on remote mountaintops or hilltops. With the exception of Bearmat Hill, work sites are only accessible by helicopter and are without any utilities such as electricity, water, and sewer. The contractor shall provide necessary utilities to the site as required. The project will require coordination and collaboration of multiple Government/Department of Defense (DOD) commands in performing all tasks and work as described in this RFP. Naval Sea Systems Command (NAVSEA) and its contractors shall provide LARCS and other communication infrastructure support, collateral, and Government Furnished Equipment (GFE) to be installed by the P-1241 project as Government Furnished – Contractor Installed (GF-CI) on all Operating Position (OP) sites in the immediate vicinity of the communication tower work items. NAVSEA shall provide oversight for installation, construction, testing, and commissioning leading to LARCS and MAGTFTC training range System of Systems (SoS) acceptance. | 41% | Solicitation | 02/18/2026 |
This contract was awarded on November 12, 2026 to Martin Brothers Construction for $26,711,770.00. | 40% | Awarded | Open |
Amendment Summary / Description of Changes: The Performance Work Statement (PWS) has been updated to incorporate revisions identified from vendor Request for Information (RFI) questions, ensuring all requirements are clearly defined. See attached revised PWS v4. | 39% | Solicitation | 11/18/2026 |
The U.S. Army Corps of Engineers (USACE), Tulsa District, is issuing this Sources Sought synopsis to conduct market research for the repair of transmission tower foundations at the Sam Rayburn Switchyard in Sam Rayburn, Texas. The purpose is to identify interested and capable firms, particularly within the small business community, to determine the acquisition strategy for this project. Interested and capable firms are invited to respond to this notice. The full Sources Sought announcement and the mandatory Questions and Responses form are available for download via the PIEE Solicitation Module link provided herein in this notice. Responses must follow the instructions detailed in the full announcement. | 39% | Market Research | 03/11/2026 |
Additional Details
Solicitation Number
FA930121R0003
Archive Date
Jul 22, 2021
Office Address
EDWARDS AFB, CA, 93524-1185