Read sections L and M of the SF1442! Failure to do so may result in disqualification from the bidding.

This project involves the tracing, cleanup, and removal of all existing telecommunications cables and equipment such as patch panels. Replacing these items with CAT6 is required upon completion of removal. The same actions of removal and replacement are to take place for the network drops throughout the buildings to match the CAT6 capabilities of the cabling and patch panels. Installation and population of vertical cable raceways/poles for cabling to be effectively utilized with existing cubicles and future modular furniture will be required. Existing cable routing equipment (i.e. cable trays, conduit, j-hooks) can be reused, or supplemented with new routing equipment by the contractor if necessary for the installation of the replacement cabling. Labeling of terminating ends, in accordance with the KAFB Comm Standards, is necessary for all instances of internal network infrastructure that is to be installed. Testing of all cabling is to be performed upon their installation in order to acquire final acceptance of the work performed. This will require the tracing, cleanup, and removal of all existing telecommunications cables and equipment such as patch panels. Replacing these items with CAT6 is required upon completion of removal. The same actions of removal and replacement are to take place for the network drops throughout the buildings to match the CAT6 capabilities of the cabling and patch panels. Installation and population of vertical cable raceways/poles for cabling to be effectively utilized with existing cubicles and future modular furniture will be required. Existing cable routing equipment (i.e. cable trays, conduit, j-hooks) can be reused or supplemented with new routing equipment by the contractor if necessary for the installation of the replacement cabling. Labeling of terminating ends, in accordance with the KAFB Comm Standards, is necessary for all instances of internal network infrastructure that is to be installed. See the SOW for more details.


The NAICS Code for this requirement is 238210 - "Electrical Contractors and Other Wiring Installation Contractors". NAICS Code 238210 has a Size Standard of $19M. The PSC Code for this effort is N059 - " Installation of Equipment—Electrical and Electronic Equipment Components Services".


377 MSG/PK anticipates a firm-fixed price contract. The acquisition will follow procedures set forth in FAR Part 14 “Sealed Bidding.” Bidders must ensure compliance with all solicitation requirements, as non-compliance may lead to disqualification.

As outlined by FAR 36.204, the anticipated magnitude for this effort is between $500,000 and $1,000,000.

See SOW and SF1442 for more details. 

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Air Force
Office:AIR FORCE GLOBAL STRIKE COMMAND.FA9401 377 MSG PK
Posted:February 4, 2026
NAICS:238210: Electrical Contractors and Other Wiring Installation Contractors
Last Updated:Aug 21, 2026
PSC:N059: INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Solicitation
Place of Performance:ROAD FORKS, New Mexico

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

Select documents to download

Showing 10 of 13 items

Document
Source
Agency
Posted Date
File Size
Actions
PresolicitationDEPT OF THE AIR FORCEFeb 4, 20262.56 MB
SolicitationDEPT OF THE AIR FORCEFeb 4, 20261.63 MB
SolicitationDEPT OF THE AIR FORCEFeb 4, 20262.56 MB
SolicitationDEPT OF THE AIR FORCEFeb 4, 2026264.25 KB
SolicitationDEPT OF THE AIR FORCEFeb 4, 20261.66 MB
SolicitationDEPT OF THE AIR FORCEFeb 4, 20261.63 MB
SolicitationDEPT OF THE AIR FORCEFeb 4, 20261.63 MB
SolicitationDEPT OF THE AIR FORCEFeb 4, 20261.25 MB
SolicitationDEPT OF THE AIR FORCEFeb 4, 2026194.36 KB
SolicitationDEPT OF THE AIR FORCEFeb 4, 2026363.38 KB

Showing 1 to 10 of 13 results

Lifecycle

Solicitation:FA940126B0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationDec 17, 2025

    IT Infrastructure for Former DOE Buildings

    Notice ac10d402fd7d413f8f7366bee7205f8b on SAM.gov

  2. 8×
    SolicitationCurrentJan 2, 2026

    IT Infrastructure for Former DOE Buildings

    Notice 4218335b0a1242c3ba7f9e7098d57fbf on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
Project Title: B405 Fiber Re-WireProject Location: Kirtland AFB- In accordance with FAR 36.204, the disclosure of the magnitude of construction projects is: Between $250,000 and $500,000.- This solicitation will be awarded in accordance with FAR Part 13, Simplified Acquisition Procedures. Your attention is directed to Section L and M of the solicitation on the evaluation criteria with how the award will be made. Please ensure you review the entire solicitation and attachments.- Refer to FAR provision 52.236-27 Site Visit (Construction) to coordinate site visits and/or obtain base passes.- Contractor shall submit all questions by close of business 13 February 2026. The government will consolidate and post all questions and answers via amendment. Amendment 0001 issued, see update.
Combined Synopsis238210Total Small Business Set-Aside02/25/202603/10/2026-
Project Title: B405 Fiber Re-WireProject Location: Kirtland AFB- In accordance with FAR 36.204, the disclosure of the magnitude of construction projects is: Between $250,000 and $500,000.- This solicitation will be awarded in accordance with FAR Part 13, Simplified Acquisition Procedures. Your attention is directed to Section L and M of the solicitation on the evaluation criteria with how the award will be made. Please ensure you review the entire solicitation and attachments.- Refer to FAR provision 52.236-27 Site Visit (Construction) to coordinate site visits and/or obtain base passes.- Contractor shall submit all questions by close of business 13 February 2026. The government will consolidate and post all questions and answers via amendment.
Combined Synopsis238210Total Small Business Set-Aside01/29/202603/02/2026-
Construction to upgrade electrical and HVAC components, near Building 191000 classrooms. This solicitation will be awarded in accordance with Revolutionary FAR Overhaul (RFO) Part 12 - Acquisition of Commercial Products and Commercial Services procedures. Your attention is directed to Section L and M for site visit information, quote preparation instructions, and evaluation criteria for award in the solicitation. Offerors are responsible for reviewing the entirety of the solicitation, attachments, and submitting quotes no later than the date/time specified. Offerors quotes and all associated documents called forth in the solicitation shall be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Quotes and all associated documents received outside the PIEE Solicitation Module will not be accepted by the U.S. Government and will be ignored. Amendment 0001 - See Attachments/Links to pull SF-30 amendment and associated attachments.
Combined Synopsis238210Total Small Business Set-Aside08/24/202608/28/2026-
Construction to upgrade electrical and HVAC components, near Building 191000 classrooms. This solicitation will be awarded in accordance with Revolutionary FAR Overhaul (RFO) Part 12 ? Acquisition of Commercial Products and Commercial Services procedures. Your attention is directed to Section L and M for site visit information, quote preparation instructions, and evaluation criteria for award in the solicitation. Offerors are responsible for reviewing the entirety of the solicitation, attachments, and submitting quotes no later than the date/time specified. Offeror?s quotes and all associated documents called forth in the solicitation shall be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Quotes and all associated documents received outside the PIEE Solicitation Module will not be accepted by the U.S. Government and will be ignored.
Combined Synopsis238210Total Small Business Set-Aside07/29/202608/28/2026-
Construction to upgrade electrical and HVAC components, near Building 191000 classrooms. This solicitation will be awarded in accordance with Revolutionary FAR Overhaul (RFO) Part 12 - Acquisition of Commercial Products and Commercial Services procedures. Your attention is directed to Section L and M for site visit information, quote preparation instructions, and evaluation criteria for award in the solicitation. Offerors are responsible for reviewing the entirety of the solicitation, attachments, and submitting quotes no later than the date/time specified. Offeror's quotes and all associated documents called forth in the solicitation shall be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Quotes and all associated documents received outside the PIEE Solicitation Module will not be accepted by the U.S. Government and will be ignored.
Combined Synopsis238210Total Small Business Set-Aside07/29/202608/28/2026-

Additional Details

Solicitation Number

FA940126B0001

Archive Date

Feb 24, 2026

Office Address

KIRTLAND AFB, NM, 87117-0001