South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)
Awarded on September 29, 2026. Full description on SAM.gov.
Overview
- Posted
- October 13, 2026
- Notice type
- Award Notice
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- International Boundary and Water Commission
Notice details
- Office
- INTERNAT BOUNDARY AND WATER COMM
- Place of performance
- San Ysidro, California, 92173
- PSC
- Y1ND: CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 29, 2026
- Award amount (SAM.gov award notice)
- $552.4M
Identifiers
- Solicitation number
- 191BWC24C0008P00012
- Notice ID
- fb3dc2bfe38f4cadad0b01ec41e87e68
- Award number (PIID)
- 191BWC24C0006P00001
Description
The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:
Early Work Package (EWP) 1C – Replacement In Kind
Final Construction Price: $13,147,453
Scope includes:
- Removal and replacement of existing roofs.
- Replacement of process equipment and piping.
- Replacement of electrical equipment.
- Replacement of odor control media.
- Installation of new window sealants.
- Replacement of coiling doors.
- Replacement of emergency showers and eyewashes.
- Painting and coating of existing facilities.
Early Work Package (EWP) 3B – Early Procurement
Final Construction Price: $25,693,528
Scope includes procurement of critical long-lead equipment, including:
- Standby generators and associated switchgear.
- Medium-voltage switchgear.
- Positive displacement blowers.
- Submersible solids-handling pumps.
- Dewatering centrifuges.
- Stainless steel slide gates.
- Stop logs.
Early Work Package (EWP) 4 – Major Concrete Structures
Final Construction Price: $37,468,188
Scope includes:
- Construction of major concrete structures for new Headworks facilities.
- Primary Sedimentation Tanks 6 and 7.
- Storage Warehouse.
- New influent and drainage infrastructure.
- Associated piping, carpentry, architectural, mechanical, electrical, and support features.
Phase 1 Base Construction Expansion
Final Construction Price: $369,613,306
Scope includes:
- New Headworks facility with integrated pump station.
- Screening and grit removal systems.
- Primary sedimentation expansion.
- Centralized odor control facilities.
- Waste activated sludge thickening and storage facilities.
- Dewatering upgrades.
- Lime storage/feed and truck loadout facilities.
- Storage warehouse.
- Chlorination storage facility.
- Administrative building expansion.
- Multiple electrical buildings.
- New electrical service, generators, utility distribution systems, process piping, and site work.
- Rehabilitation of existing activated sludge tanks and lime silos.
- Engineering services during construction and procurement of the effluent meter and bypass piping.
Construction Allowances
The contract also increases CLIN 008 Construction Allowances by $9,804,886, increasing the allowance amount from $1,783,374 to $11,588,260 to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]
Period of Performance
The base construction period of performance has been revised to 1,643 calendar days (54 months) from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion.
Award Value
- Previous Contract Value: $106,449,546
- Modification Increase: $445,922,475
- Revised Total Contract Value: $552,372,021
Award Overview
Award Number
191BWC24C0006P00001
Award Amount (SAM.gov award notice)
$552.4M
Award Date
Sep 29, 2026
Awardee
Awardee Address
Tempe, AZ 85284, UNITED STATES
Original Solicitation
Notice ID: fb3dc2bfe38f4cadad0b01ec41e87e68
Posted Date: Oct 13, 2026
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 1Version 1Award NoticeCurrent
South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)
Similar Opportunities
Additional Details
Solicitation Number
191BWC24C0008P00012
Archive Date
Oct 28, 2026
Office Address
El Paso, TX, 79902