Notice ID: 7140f2c96a1a4c399e33fe5fb2659e04Special Notice
FD2020-22-00894-00
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 AM EDT
- Posted
- June 21, 2022
- Notice type
- Special Notice
- Agency
- Department of WarDEFENSE LOGISTICS AGENCY
Notice details
- Office
- DLA AVIATION AT OGDEN, UT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FD2020-22-00894-00
- Notice ID
- 7140f2c96a1a4c399e33fe5fb2659e04
Description
1620-01-030-7948 COLLAR,TORQUE,LANDI
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Files (2)
- Download
UNMARKED STATEMENT.pdf
532 KBAdded in Special Notice version 1Posted - Requires SAM.gov sign-in
030-7948.zip
198 KBAdded in Special Notice version 1Posted
Lifecycle
- 1
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This notice is a combined Request for Information and Synopsis. The primary purposes of this notice are as follows: Conduct market research to determine if other sources capable of satisfying the agency’s requirements exist and if commercial items or non-developmental items are available that meet the agency’s requirements. Improve small business access to acquisition information. Enhance competition by identifying contracting and subcontracting opportunities. This announcement is not a Request for Proposal or an Invitation for Bid, nor is it to be construed as a commitment by the Government. The Government does not intend to contract based on this request or otherwise pay for any information solicited herein. Interested parties should contact Ryan Peacock at 385-591-0239 or email Ryan.peacock.2@us.af.mil Detailed Information Noun: INSERT,ELECTRICAL,H NSN: 1620-01-185-3806 P/N: 4G12051-101A Estimated Quantity: 37 EA; Plus 1 EA First Article Destination: FB2029 Estimated Delivery Schedule: 01 FEB 2029 Set-aside: It is NOT expected that this requirement will be set-aside for small businesses Statements Based upon market research, the Government is not planning on using policies contained in Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services. However, interested parties may identify to the contracting officer their interest and capability to satisfy the Government's requirement with a commercial item within 15 days of this notice. All responsible sources may submit a capability statement, proposal, or quotation which shall be considered by the agency. This part required engineering source approval by the design control activity to maintain the quality of the part. Existing unique design capability, engineering skills and manufacturing knowledge by the qualified source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity’s procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. Award will be made only if the offeror, the product/service, or the manufacturer meets qualification requirements at the time of award in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements are cited in each individual solicitation. One or more of the items under this acquisition is subject to Free Trade Agreements. | - | Market Research | 11/30/2026 |
417th SCMS Landing Gear Depot Support (LGDS) Request for Information This announcement constitutes an official Request for Information (RFI). This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government. The Government will not pay for any information provided in response to this RFI. Scope The 417th Landing Gear Supply Chain Management Squadron (417 SCMS), Enterprise Hill Commodity Council (EHCC) and Defense Logistics Agency (DLA) are developing a strategy to support Ogden Air Logistics Complex (OO-ALC) Depot production goals associated with the B-52, C-5, C-130, KC-135, and E-3 platforms. This strategy will subsume the workload currently supported under the Landing Gear Performance Based Logistics (LG-PBL1) contract, while expanding support to the B-52 and C-5 platforms. The primary goals of this future contract are to provide: 1.) Complete Component Parts Kits: Support Depot remanufacture of landing gear Depot Level Reparables (DLRs) for all five weapon systems, 2.) Remanufacture Support: Fulfill remanufacturing requirements based on the delta between supply chain need and depot production capability. 3.) Process Offload: Relieve operational bottlenecks and single-point process failures (e.g. plating, grinding) at the organic depot. Background The 417 SCMS currently supports the LGDS requirements through multiple vehicles: LG-PBL1 Contract: Single-award, Firm-Fixed-Price (FFP) award-term contract (consisting of a 5-year base and two 5-year award terms), supporting the C-130, E-3, and KC-135, expiring in 2032. The prime contractor is responsible for the quality and delivery of all parts. This contract operates under a Public-Private Partnership (PPP), incorporating a direct sales approach with incentives/disincentives tied to outcome-based performance metrics. Remanufacture percentages are roughly 60% organic Depot, and 40% contractor facility. Organic Depot Support: The B-52 and C-5 are remanufactured 100% organically at the OO-ALC depot, with individual component parts (kit parts) purchased transactionally through DLA. Developing Strategy The USAF owns the preponderance of the technical data and maintains a Boeing Rights Guard agreement for limited data on the E-3 and KC-135 landing gear systems. The Government has determined that to be successful this contract strategy must: Allow the contractor to leverage the Government’s buying power for consumable parts, while streamlining and improving the purchase process. Provide a single contractor with management responsibility for the entire population of replacement parts supporting DLRs. Improve forecasting and inventory accuracy Provide relief for single-point process bottlenecks (e.g., plating, grinding) within the organic depot Provide remanufacture support for all DLRs beyond the throughput capacity of Government depot, to be fulfilled at the prime contractor’s facility. Incorporate properly balanced incentives and disincentives for contractor performance Due to the nature of this effort, the complexity and magnitude of the transition process, and the need for a single point of accountability, the Government intends to award a 15-year IDIQ-type contract. The single-award long-term approach will allow the contractor ample time to conduct the necessary research for proper phase-in of consumable kits, and support the transition of current LG-PBL1 workload. The Government intends to develop an outcome-based support contract utilizing a workshare payment approach. The primary objectives of this contract are to: (1) Improve landing gear piece part and assembly supportability (2) Provide remanufacture support beyond organic capacity 4.0 Performance Expectations Performance requirements under the future contract will include: Asset Availability of consumable kits to support OO-ALC Depot production lines Core remanufacture support for E-3, KC-135, and C-130. Potential expanded remanufacture support for B-52 and/or C-5. Industrial process (e.g. plating, grinding,) offload at the contractor’s facility when organic depot bottlenecking occurs. The LGDS acquisition team is asking for feedback from Industry representatives regarding this strategic support acquisition for Landing Gear spare parts. 5.0 Industry Feedback Questions: Please provide the following business information for your company:: Company Name Address Point of Contact CAGE Code Phone Number E-mail Address Web Page URL Size of Business under NAICS Code 336413 (Small Business Size Standard is 1,250 employees) The Government is anticipating a 15-year Firm-Fixed-Price contract for this effort. Describe any commercial risks, pricing volatility, or supply chain issues your company foresees with a 15-year duration. What Economic Price Adjustment (EPA) indices (e.g., specific Bureau of Labor Statistics PPI codes) or adjustment mechanisms would you recommend to mitigate long-term pricing risk? Describe your company's capability to procure all parts listed in Attachment 1 (Consumable Kits). What predictive tools, supply chain modeling, or consumption tracking methods do you use to anticipate demand and mitigate long-lead consumable shortages (e.g., specialized fasteners, seals, forgings)? What experience do you have supporting variable/operationally dependent Air Force parts needs, including surge requirements? Describe your company’s in-house capability and annual capacity to remanufacture the parts listed in Attachment 2 (LG-PBL1 NIINs). Does your company have experience providing parts and production support for complex landing gear assemblies throughout the remanufacture process? Please describe your company’s experience with USAF/Landing Gear engineering protocols, Engineering Change Proposals (ECPs), and Quality Management. Describe your company’s experience managing legacy USAF weapon system component obsolescence and resolving recurring non-conforming parts issues within a remanufacturing environment. Does your company have the capability and experience to train, qualify, and certify personnel to perform critical military-grade remanufacturing processes? Describe your experience providing transition support from an expiring government contract to a new government contract. Describe your experience integrating with and using Government software systems. 6.0 Submission Instructions The Government is accepting responses to this request for information via email only. Please provide written responses to the Contracting Officers and Program Manager by 11 January 2027 at the following email addresses: Nathan Flinders Contracting Officer Nathan.flinders@dla.mil Justin Rogers Contracting Officer Justin.rogers.28@us.af.mil Trevor Russell Program Manager Trevor.Russell.2@us.af.mil Attachments: Consumable Kits List by WS Current LG-PBL1 NIINs | - | Market Research | 01/11/2027 |
48 each of NSN: 1620-00-122-0474 | - | Solicitation | 11/30/2026 |
29 October 2026 Update: RFP Amendment 0001 posted with updated attachments. The only attachments with changes are: Attachment 1 - TEP Worksheet Attachment 2 - TRD Attachment 3 - Section L Attachment 4 - Section M All other attachments remain as posted in original RFP. Response date of 1 March 2027 is unchanged. Please sign and return Amendment along with proposal. RFP Description: Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) Overview Defense Logistics Agency (DLA) Aviation at Ogden is issuing this formal solicitation for the Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) program. This requirement is being competed as a 100% Small Business Set-Aside under full trade-off source selection procedures. Solicitation Number: SPRHA1-26-R-1003 Set-Aside Status: 100% Small Business Set-Aside NAICS Code: 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing PSC Code: 1620 - Aircraft Landing Gear Components Contract Type: Single-Award ID/IQ (Firm-Fixed-Price with EPA) Period of Performance: 10 Years (5-Year Base + One 5-Year Option) Scope of Work The LG-CSCI2 program provides performance-based supply chain support for competitive landing gear components associated with USAF aircraft. The scope encompasses approximately 2,800 National Item Identification Numbers (NIINs), including USAF Depot Level Reparables (DLRs) and DLA consumables. These range from simple consumable items to complex DLRs requiring forgings and long lead times. The Prime Contractor will provide end-to-end supply chain management, engineering oversight, quality assurance, and procurement. Key program objectives include: Achieving a 95% On-Time Delivery (OTD) rate for DLA-managed parts and a 90% OTD rate for USAF-managed parts. Reducing Production Lead Times (PLTs) across the supply chain by a minimum of 25%. Executing strategic raw material purchasing, forging die management, and Obsolescence/DMSMS management. Solicitation Attachments & Instructions The official Request for Proposal (RFP), Technical Requirements Document (TRD), and other applicable attachments are provided in this posting. Note on Bid Sets: Bid sets for the individual NIINs are not hosted directly on SAM.gov. They will be mailed via removable drives to interested parties. Please provide your firm's mailing address to the DLA Contracting POCs listed below to request a removable drive be mailed to you. Points of Contact: Primary: Nathan Flinders, Contracting Officer (nathan.flinders@dla.mil) Secondary: Justin Rogers, Contracting Officer (justin.rogers.28@us.af.mil) | - | Solicitation | 03/01/2027 |
NSN 1620012636733 BALLSCREW ASSEMBLY FOR THE C-130 QTY 2ea | - | Solicitation | 11/28/2026 |
Additional Details
Solicitation Number
FD2020-22-00894-00
Archive Date
Not specified
Office Address
HILL AIR FORCE BASE, UT, 84056-5820