Repair of E-3 RCU Repair Amendment 1
Archived on April 7, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM EDT
- Posted
- March 6, 2026
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 811210: Electronic and Precision Equipment Repair and Maintenance
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8539 AFSC PZABA
- Place of performance
- Warner Robins, Georgia
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FD2060-25-00168_E3RCU
- Notice ID
- 4ebb964db19944728a2a15991a5ef96b
Description
The purpose of this solicitation is to obtain a 1- year contract vehicle for repair of the E-3 Recording Control Unit to support user requirements. The E-3 Recording Control Unit (E-3 RCU) or Control Panel consists of a Digital Flight Data Recorder (DFDR), a Cockpit Voice Recorder (CVR), and a Crash Position Locator (CPL) control unit. The E-3 RCU is used to operate and test the DFDR, CVR, and CPL. The DFDR records aircraft operating parameters such as altitude, attitude, power lever angle and significant events such as CPL activation. The CVR is utilized to record flight crew communication. The CPL generates and transmits distress signals in the event of a crash. This repair is intended to provide the assets necessary to support the current Mission Requirement of the E-3 AWACS aircraft.
There shall be no more than 2 PQDRs on this Contract.
Delivery of repair
The Turnaround Time (TAT) is 60 calendar days for repair. There shall be no more than three late deliveries for this contract. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by a revised delivery date acceptable to the Government.
CAV-AF reporting
The Contractor shall report production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.
For further requirement descriptions please reference attached PWS.
This is an amendment is to add the requirements for CMMC, NIST SP 800-171: Reference DFARS 4.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (8)
- Download
DOPSR_Cleared_OSD_Memo_CMMC_Implementation_Policy_d26075de0f.pdf
1.0 MBAdded in Combined Synopsis/Solicitation version 9Posted - Download
PWS E-3 RCU.docx
66 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Item Description__012077100.pdf
56 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
FD20602500168 AFMC 158.pdf
71 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
FD20602500168 DD Form 1653.pdf
90 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Drawing 200945085.pdf
82 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
807__012077100.pdf
81 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
CDRL - CAVAF Signed.pdf
126 KBAdded in Combined Synopsis/Solicitation version 5Posted
Lifecycle
- 2Version 2Combined Synopsis/SolicitationArchived
Repair of E-3 RCU Repair
- 5Version 5Combined Synopsis/SolicitationArchived
Repair of E-3 RCU Repair
- 7Version 7Combined Synopsis/SolicitationArchived
Repair of E-3 RCU Repair
- 9Version 9Combined Synopsis/SolicitationArchivedCurrent
Repair of E-3 RCU Repair Amendment 1
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
FD2060-25-00168_E3RCU
Archive Date
Apr 7, 2026
Office Address
ROBINS AFB, GA, 31098-1670