GovChime
Notice ID: fec068aae82049ac9ed2b2fe33085efeSolicitation

W912DY26RA063

Responses closed . Full description on SAM.gov.

Overview

Response deadline
10:00 AM CDT
Posted
April 28, 2026
Notice type
Solicitation
Set-aside
Women-Owned Small Business
NAICS
238910: Site Preparation Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL
Place of performance
Twentynine Palms, California, 92277
PSC
P400: SALVAGE- DEMOLITION OF BUILDINGS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912DY26RA063
Notice ID
fec068aae82049ac9ed2b2fe33085efe

Description

The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1SolicitationCurrent

    W912DY26RA063

    Notice fec068aae82049ac9ed2b2fe33085efe on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912DY26RA063

Archive Date

Apr 27, 2027

Office Address

REDSTONE ARSENAL, AL, 35898-0000