GovChime
Notice ID: baf9100654e34e4cb0b32d40f583e542Sources SoughtArchived

Water Valve Leak Mitigation

Archived on September 4, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM EDT
Posted
July 9, 2026
Notice type
Sources Sought
NAICS
NAICS 54171 Research and Development in the Physical, Engineering, and Life Sciences (reported as 541710)
Agency
Department of Energy

Notice details

Office
FLUOR MARINE PROPULSION - DOE CONTRACTOR
PSC
AG12: R&D- ENERGY: COAL (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT)
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FMP-NNL-0047
Notice ID
baf9100654e34e4cb0b32d40f583e542

Description

THIS IS A REQUEST FOR INFORMATION ONLY.  THIS IS NOT A SOLICITATION.

This notice is issued solely for informational and planning purposes. This notice does not constitute a solicitation. The Naval Nuclear Laboratory (NNL), operated by Fluor Marine Propulsion (FMP), is utilizing this request for information for market research to determine what organizations have the capability to fulfill this requirement.  NNL will not be responsible for any costs incurred by interested parties in responding to this request for information.

Responses shall not exceed five (5) pages in length.

Scope:

When performing maintenance on a pure water fluid system, valves are commonly used for work area isolation.  Valves that have been in-service can leak past their seats.  In this case, the worker may still be protected from hazardous energy on the other side of the valve but work such as welding might not be possible if water is being continually introduced to the work area.  In this case, more valves can be used if available in the system design, but if not, freeze seals are commonly used to eliminate leakage.  Freeze seals can consume significant work and resources to set, so alternate means to mitigate water leakage past valves is desired.

A method to mitigate valve leak-by for the hours or days a system is open for maintenance or the time to perform a weld is desired which will not affect pure water chemistry or stainless-steel corrosion or cracking performance.  The method must not introduce devices or materials that require removal from the system after repair is completed.  Solutions must either be external to the system, completely dissolve into known and consistent constituents at room temperature, or otherwise non-intrusive.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Water Valve Leak Mitigation

    Notice baf9100654e34e4cb0b32d40f583e542 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FMP-NNL-0047

Archive Date

Sep 4, 2026

Office Address

Schenectady, NY, 12301