Water Valve Leak Mitigation
Archived on September 4, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM EDT
- Posted
- July 9, 2026
- Notice type
- Sources Sought
- NAICS
- NAICS 54171 Research and Development in the Physical, Engineering, and Life Sciences (reported as 541710)
- Agency
- Department of Energy
Notice details
- Office
- FLUOR MARINE PROPULSION - DOE CONTRACTOR
- PSC
- AG12: R&D- ENERGY: COAL (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT)
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FMP-NNL-0047
- Notice ID
- baf9100654e34e4cb0b32d40f583e542
Description
THIS IS A REQUEST FOR INFORMATION ONLY. THIS IS NOT A SOLICITATION.
This notice is issued solely for informational and planning purposes. This notice does not constitute a solicitation. The Naval Nuclear Laboratory (NNL), operated by Fluor Marine Propulsion (FMP), is utilizing this request for information for market research to determine what organizations have the capability to fulfill this requirement. NNL will not be responsible for any costs incurred by interested parties in responding to this request for information.
Responses shall not exceed five (5) pages in length.
Scope:
When performing maintenance on a pure water fluid system, valves are commonly used for work area isolation. Valves that have been in-service can leak past their seats. In this case, the worker may still be protected from hazardous energy on the other side of the valve but work such as welding might not be possible if water is being continually introduced to the work area. In this case, more valves can be used if available in the system design, but if not, freeze seals are commonly used to eliminate leakage. Freeze seals can consume significant work and resources to set, so alternate means to mitigate water leakage past valves is desired.
A method to mitigate valve leak-by for the hours or days a system is open for maintenance or the time to perform a weld is desired which will not affect pure water chemistry or stainless-steel corrosion or cracking performance. The method must not introduce devices or materials that require removal from the system after repair is completed. Solutions must either be external to the system, completely dissolve into known and consistent constituents at room temperature, or otherwise non-intrusive.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
Water Valve Leak Mitigation
Similar Opportunities
Additional Details
Solicitation Number
FMP-NNL-0047
Archive Date
Sep 4, 2026
Office Address
Schenectady, NY, 12301