GovChime
Notice ID: 087a5eea2ea6860d010070e9a63cd06fCombined Synopsis/Solicitation

Hanley Upper Envelope Construction

Archived on January 1, 2022. Full description on SAM.gov.

Overview

Posted
February 13, 2017
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238160: Roofing Contractors
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R2 UPSTATE NY SRVCE CTR
Place of performance
James M. Hanley Federal Building 100 S. Clinton Street , Syracuse, 13261
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
GS-02-P-17-PW-C-0001
Notice ID
087a5eea2ea6860d010070e9a63cd06f

Description

AMENDMENT #1 TO SOLICITATION: Amendment to Specification Section 017320: There are two (2) roof top AC units not initially identified within the project documents (each being two (2) ton units) that have had the coolant extracted, are electrically and mechanically disconnected, and have been recently abandoned in place. The units need to be removed from the Annex roof and disposed of as part of this project. All remaining roof penetrations, electrical cabling and piping originally used to operate and or service these two units shall be removed, cut flush to the concrete deck, and securely covered prior to installation of the new roofing assembly (similar to how other abandoned equipment is to be handled per the project documents). AMENDMENT #2 TO SOLICITATION: This amendment posts(as an attachement), all the final questions and answers. Document posted as "Solicitation QA #2" Also, this amendment posts a change to Specification 01100. Posted as an attachment "SF30-Amendment 2" ADD the following section to Specification 01100 - Summary of Work, para. 1.2.J.3: "3. The design intent is to provide 6" of XPS insulation throughout all roof areas where existing conditions will allow. Due to the varying limitations at certain roof areas, this may not be possible. Drawings have indicated where certain roof areas will not allow 6" of new XPS insulation to be installed. In these cases, contractor shall install no less than the existing depth of insulation documented to maintain the same height as existing, without negatively impacting existing conditions, such as flashing and roof equipment curb heights, etc."

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Katherine S. Wheeler
Contracting Officer

Secondary Contact

James P. Berring
Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:GS-02-P-17-PW-C-0001
  1. Combined Synopsis
  1. 6×
    Combined SynopsisCurrentJan 5, 2017

    Hanley Upper Envelope Construction

    Notice 087a5eea2ea6860d010070e9a63cd06f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

GS-02-P-17-PW-C-0001

Archive Date

Jan 1, 2022