Notice ID: 087a5eea2ea6860d010070e9a63cd06fCombined Synopsis/Solicitation
Hanley Upper Envelope Construction
Archived on January 1, 2022. Full description on SAM.gov.
Overview
- Posted
- February 13, 2017
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238160: Roofing Contractors
- Agency
- General Services AdministrationPUBLIC BUILDINGS SERVICE
Notice details
- Office
- PBS R2 UPSTATE NY SRVCE CTR
- Place of performance
- James M. Hanley Federal Building 100 S. Clinton Street , Syracuse, 13261
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- GS-02-P-17-PW-C-0001
- Notice ID
- 087a5eea2ea6860d010070e9a63cd06f
Description
AMENDMENT #1 TO SOLICITATION: Amendment to Specification Section 017320: There are two (2) roof top AC units not initially identified within the project documents (each being two (2) ton units) that have had the coolant extracted, are electrically and mechanically disconnected, and have been recently abandoned in place. The units need to be removed from the Annex roof and disposed of as part of this project. All remaining roof penetrations, electrical cabling and piping originally used to operate and or service these two units shall be removed, cut flush to the concrete deck, and securely covered prior to installation of the new roofing assembly (similar to how other abandoned equipment is to be handled per the project documents). AMENDMENT #2 TO SOLICITATION: This amendment posts(as an attachement), all the final questions and answers. Document posted as "Solicitation QA #2" Also, this amendment posts a change to Specification 01100. Posted as an attachment "SF30-Amendment 2" ADD the following section to Specification 01100 - Summary of Work, para. 1.2.J.3: "3. The design intent is to provide 6" of XPS insulation throughout all roof areas where existing conditions will allow. Due to the varying limitations at certain roof areas, this may not be possible. Drawings have indicated where certain roof areas will not allow 6" of new XPS insulation to be installed. In these cases, contractor shall install no less than the existing depth of insulation documented to maintain the same height as existing, without negatively impacting existing conditions, such as flashing and roof equipment curb heights, etc."
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
GS-02-P-17-PW-C-0001- Combined Synopsis
- 6×Combined SynopsisCurrentJan 5, 2017
Hanley Upper Envelope Construction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
GS-02-P-17-PW-C-0001
Archive Date
Jan 1, 2022