Notice ID: 3d2654d951b9eafd9d93358b03f0d9dfAward NoticeAwarded
Conversion to District Chilled Water
Awarded on April 30, 2009. Full description on SAM.gov.
Awarded tounder GS-05P-08-SE-C-0054 (source: SAM.gov award notice)• $148.1K
Overview
- Posted
- May 8, 2009
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- General Services AdministrationPUBLIC BUILDINGS SERVICE
Notice details
- Office
- PBS R5 ACQUISITION MANAGEMENT DIVISION
- Place of performance
- Federal Building & US Courthouse 515 West 1st Street, DULUTH, 55802-1302
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Sep 25, 2026
- Award date
- Apr 30, 2009
- Award amount (SAM.gov award notice)
- $148.1K
Identifiers
- Solicitation number
- GS-05P-08-SE-C-0054
- Notice ID
- 3d2654d951b9eafd9d93358b03f0d9df
- Award number (PIID)
- GS-05P-08-SE-C-0054
Description
RFQ GS-05P-08-SE-C-0054 Amendment 0001, Conversion to District Chilled Water, Gerald W. Heaney Federal Building and U.S. Courthouse and Customhouse, 515 West 1st Street, Duluth, MN 55802-1302 The purpose of this amendment is to incorporate the GSA Standard Form 1442. The offeror acknowledges receipt of amendment 0001 to the solicitation in Block 19. Acknowledgment of Amendments on GSA Standard Form 1442. All other terms and conditions remain unchanged and in full force and effect.
Award Overview
Award Number
GS-05P-08-SE-C-0054
Award Amount (SAM.gov award notice)
$148.1K
Award Date
Apr 30, 2009
Awardee
Original Solicitation
Notice ID: 3d2654d951b9eafd9d93358b03f0d9df
Posted Date: May 8, 2009
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
GS-05P-08-SE-C-0054- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- 3×Pre-SolicitationSep 10, 2008
Conversion to District Chilled Water
- AwardedCurrentMay 8, 2009
Conversion to District Chilled Water
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Continuing a legacy of outstanding public architecture that was initiated with the founding of the nation, the General Services Administration (GSA) Public Buildings Service (PBS) seeks to commission our nation’s most talented architects, landscape architects, interior designers, engineers, and construction professionals to design and construct federal buildings of outstanding quality and value. These projects are to demonstrate the value of true integrated design that balances aesthetics, cost, functionality, constructability, durability, and reliability; create environmentally responsible and superior workplaces for civilian Federal employees; and give contemporary form and meaning to our democratic values. In this context, GSA announces an opportunity for Design and Construction Excellence in public architecture for performance of Architectural Engineering Design and Construction services in accordance with GSA quality standards and requirements. GSA intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for the existing Building 67 on the Denver Federal Center. This acquisition encompasses the design and construction of the offices and related space as required by GSA and Bureau of Reclamation (BOR). GSA is planning the consolidation of BOR’s directorates through a remodel project in Building 67. Data around how each directorate works, will be presented when the Request for Proposals (RFP) is released which are the result of a project development study performed by GSA prior to the release of this RFP. The design-build scope of work includes all labor, materials, design, engineering, construction, commissioning, and other related services necessary to support the consolidation effort and upgrade the finishes within the tenant spaces. The estimated design-build duration is approximately 24 months after the issuance of the notice to proceed. This development study will be provided for information purposes only. The North American Industry Classification System (NAICS) code for this procurement will be 236220. The Small Business Size Standard is $33.5M. The total space of the building consists of approximately 372,000 gross square feet, available for use by the multiple agencies for personnel, furnishings and equipment. The space will be designed and constructed in English units. The estimated total design-build cost is between $10,000,000 and $15,000,000. The consolidation project will involve housing approximately 1,029 federal employees and contractors within 169,785 rentable square feet within Building 67. BOR is the primary tenant of Building 67, presently occupying approximately 90% of the 372,000 gross square foot office building. Building 67 was built in 1967 and is comprised of 14 floors and a penthouse. The consolidation of employees within Building 67 also includes the relocation of BOR personnel currently residing in other locations within the Denver Federal Center. The existing structure shall remain fully operational and occupied during construction. No adverse impact on tenant mission will be acceptable. Relocating employees into swing space while construction to their work area transpires will be necessary. Upgrades to the existing building will focus on improvements within the tenant spaces, with minimal work on any of the major building equipment. The scope of Design-Build Services may include, but is not limited to, the following: design/construction documents and construction work, which consists of providing all labor, equipment, and materials for a complete buildout. GSA intends to award a firm fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively. The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “shortlisted� Offerors to submit Phase 2 proposals. Maximum Number of “Short Listed� Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “shortlist� on FedBizOpps. Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15. At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services pursuant to Federal Acquisition Regulation (FAR) Best Value Design-Build Selection Procedures (FAR Subpart 15.3). GSA envisions a highly collaborative design-build delivery approach for this project where the Design-Build contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of both the team members and GSA's requirements to deliver an economical and operationally efficient building. The project is also to include conformance to the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards. During the development period from initial concept to final design, the Design-Build team will work in close consultation with GSA, the stakeholders and the Construction Manager (CM) to ensure that all of the goals are addressed and that best value practices are utilized. This procurement will be set aside to small business firms. The RFQ will be issued electronically on or about late August online at: http://www.fedbizopps.gov/. Please contact the GSA contacts listed below with any questions or concerns. Contracting Office POCs: Contracting Office: Rocky Mountain Region Public Buildings Service Acquisition Division (8PQ) P.O. Box 25546 Building 41 Denver Federal Center Denver, CO 80225-0546 Contracting Officer: Contract Specialist: Len Wilson Mara Wild Len.wilson@gsa.gov mara.wild@gsa.gov (303) 236-2839 (303) 236-1595 | - | Pre-Solicitation | Open |
Solicitation Number GS-05-P-16-CD-D-7000 for MD Repair and Alteration IDIQ has been changed to Solicitation Number GS-03-P-16-CD-D-7000. The solicitation will be available on or about 12/01/2015. All other dates remain the same. The synopsis information remains the same. From now on, please refer to Solicitation Number GS-03-P-16-CD-D-7000. Solicitation Number GS-05-P-16-CD-D-7000 is being canceled. The solicitation for this procurement will be re-posted under Solicitation Number GS-03-P-16-CD-D-7000. | - | Pre-Solicitation | Open |
438-21-403, Renovate First Floor Kitchen | - | Solicitation | 11/12/2026 |
***Amendment 0004 is issued to PHASE II SELECTED OFFERORS ONLY on 28 August 2026. The due date is extended to 4 September 2026 at 1:00 PM EDT***Amendment 0003 is issued to PHASE II SELECTED OFFERORS ONLY on 4 August 2026*** ***Amendment 0002 is issued to PHASE II SELECTED OFFERORS ONLY on 29 July 2026**** Request for Proposal (RFP), Solicitation No. W912QR26RA035 is issued for the Design-Build of the Maintenance Support Activity (AMSA) and Equipment Concentration Site (ECS) in Arden Hills, MN. All documents are available for download from the Procurement Integrated Enterprise Environment (PIEE) website. Go to the Attachments/Links section of the SAM notice and access the hyperlink titled PIEE Solicitation Module Link for W912QR26RA035. Once at the site, scroll down to the Attachments section of the PIEE Solicitation Module to locate the documents. | - | Solicitation | 09/04/2026 |
Amendment 0001 incorporates a copy of the ICRA, Site Visit attendance sheet, responses to the Site Visit questions and a revised DBA Wage Determination. This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. All measurements/dimensions existing blueprints are approximate. Contractor must verify all measurements/dimensions. The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval. The Contractor shall match existing conditions at each location. The contractor will be responsible for and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials. | - | Solicitation | 09/02/2026 |
Additional Details
Solicitation Number
GS-05P-08-SE-C-0054
Archive Date
Feb 11, 2010
Office Address
CHICAGO, IL, 60604