Recovery - Design/Build (install) Copper Scrim, for the New U.S. Federal Courthouse, El Paso, TX

Awarded on March 31, 2010. Full description on SAM.gov.

Awarded tounder GS-07P-10-UY-C-0003 (source: SAM.gov award notice)• $1.2M

Overview

Posted
April 5, 2010
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R7 PROG SUPPORT - CAPITAL AND IDIQ
Place of performance
New U.S. Federal Courthouse, El Paso, TX, El Paso
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 6, 2025
Award date
Mar 31, 2010
Award amount (SAM.gov award notice)
$1.2M

Identifiers

Solicitation number
GS-07P-10-UY-C-0003
Notice ID
d170ea31da2d743dd696dd462e8b0e52
Award number (PIID)
GS-07P-10-UY-C-0003

Description

American Recovery and Reinvestment Act (ARRA) Project Firm, Fixed-Price (FFP) Design/Build contract - GSA has need for full design and installation of an engineered copper scrim product with all its necessary components, support, anchors, labor and materials for the new 8 story, 239,600 gross square foot United States Federal Courthouse in El Paso, Texas. The project envisions a fully installed and functioning system that is designed to accommodate the existing building's structural and architectural components. The original concept design featured this energy conservation, copper exterior window shading scrim, to act as a shading device against the El Paso sun. The solicitation will be posted to FedBizOpps on or about January 26, 2010. The contract will be issued as a Design-Build with one base and three options in which the base will be awarded for the west side of the building and the three options being for the south, east and north sides. The selected contractor will accomplish all work in accordance with the Scope of Work (SOW) and conceptual design drawings provided by GSA. The designer may come up with something different than the concept design as long as it is similar. Installation cannot begin until the construction contractor for the courthouse has vacated the site. This procurement will be competed full and open. Proposals will be evaluated for technical capability and price. Technical qualifications are significantly more important than price. The Government will provide bridging documents, for background information purposes only, on the original concept project design documents (plans and specifications) to prospective offerors as part of the Request for Proposal (RFP). An on site pre-proposal conference will be held to allow all prospective offerors an opportunity to visit the project site and ask questions about the project SOW. Prior to receipt of proposals all offerors must be registered in CCR (Central Contractor Registration) at https://www.bpn.gov/ccr/default.aspx and have completed their Online Representation and Certifications Application (ORCA) at https://orca.bpn.gov/. If the awarded contractor is a large business, they will be required to complete a subcontracting plan. Below are the GSA subcontracting goals for prime contractors. SUBCONTRACTING GOALS (2009 goals are still in affect for 2010) Small Business 37% Small Business Disadvantaged Business 6% Woman Owned Small Business 5% HUBZone Small Business 3% Veteran Owned Small Business 5% Service Disabled Veteran Owned Small Business 3%

Full description on SAM.gov

Award Overview

Award Number

GS-07P-10-UY-C-0003

Award Amount (SAM.gov award notice)

$1.2M

Award Date

Mar 31, 2010

Awardee

Original Solicitation

Notice ID: d170ea31da2d743dd696dd462e8b0e52

Posted Date: Apr 5, 2010

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Daniel S Killian
Contract Specialist
Fax: 817-978-2577

Secondary Contact

Angela D Long
Contract Specialist
Fax: 817-978-2577

Documents

No documents available.

Lifecycle

Solicitation:GS-07P-10-UY-C-0003
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 7×
    Pre-SolicitationJan 11, 2010

    Recovery - Design/Build (install) Copper Scrim, for the New U.S. Federal Courthouse, El Paso, TX

    Notice 5037b63c3391593dbf4c000703d14030 on SAM.gov

  2. SolicitationFeb 27, 2010

    Recovery - Design/Build (install) Copper Scrim, for the New U.S. Federal Courthouse, El Paso, TX

    Notice f01e78b92a90b1f0efa8f05e7047c39d on SAM.gov

  3. AwardedCurrentApr 5, 2010

    Recovery - Design/Build (install) Copper Scrim, for the New U.S. Federal Courthouse, El Paso, TX

    Notice d170ea31da2d743dd696dd462e8b0e52 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

GS-07P-10-UY-C-0003

Archive Date

Apr 15, 2010