GovChime
Notice ID: e085629a71f7465fbe4943d161141a11Combined Synopsis/SolicitationArchived

Combined Synopsis/Solicitation for B6 Security Renovation

Archived on July 24, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM MDT
Posted
July 1, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarUS SPECIAL OPERATIONS COMMAND (USSOCOM)

Notice details

Office
SOCNORTH PB
Place of performance
Tucson, Arizona, 85711
PSC
Z2AA: REPAIR OR ALTERATION OF OFFICE BUILDINGS
Last updated
Oct 29, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
H92295-26-Q-B010
Notice ID
e085629a71f7465fbe4943d161141a11

Description

Mandatory Site Visit: June 25, 2026, at 3:00 PM EDT (12:00 PM Noon local Arizona time)

All questions must be submitted in writing to the Contracting Officer by June 29th 2026.

1. Description of Work

The U.S. Customs and Border Protection (CBP) has a requirement for the renovation and physical security enhancement of a 2,700 SF modular facility (Building #6) at the Tucson Border Patrol Sector Headquarters in Tucson, AZ. This project is critical to support 24-hour operations for Special Operations Command North (SOCNORTH).

The work is detailed in the attached Statement of Work (SOW) and generally includes, but is not limited to, the following key tasks:

  • Demolition and Architectural Repairs: Removal of existing windows and replacement of non-serviceable building skirting.

  • Structural Modifications: Construction of a new security vestibule inside the main entrance, including structural improvements to the sub-flooring and framing to support the installation of a Sensitive Compartmented Information Facility (SCIF) door.

  • SCIF Door and Hardware: Installation of one (1) new door assembly compliant with Intelligence Community Directive (ICD) 705 standards, complete with a GSA-approved X10 high-security lock.

  • HVAC Upgrades: Installation of two (2) new 1-ton mini-split HVAC units.

  • Electrical Systems: Assessment of the building's electrical system to support new and existing loads. The contractor shall propose and install upgrades and a backup power generator solution if the existing system is found to be insufficient.

  • Perimeter Security: Installation of a 6’ high chain-link fence with concertina wire and two access gates.

  • Electronic Security Systems (ESS): Installation of a new CCTV system and an Intrusion Detection System (IDS). The IDS must be compliant with ICD-705 and UL 2050 standards and must be installed by a UL 2050 certified installer.

2. Important Conditions

  • Site Location: The work will be performed on an active, secure federal law enforcement compound. Strict coordination and adherence to all site security policies and procedures are mandatory.

  • Personnel Security: All contractor personnel requiring access to the site must be United States Citizens and must undergo and pass a National Agency Check with Inquiries (NACI) background check facilitated by the government prior to site access.

  • Document Control: The full technical drawings for this project are designated as Controlled Unclassified Information (CUI). Vetted offerors may request access to the drawings through the Contracting Officer after the solicitation is issued.

  • SAM.gov Registration: Offerors must have an active registration in the System for Award Management (SAM.gov) at the time of proposal submission and must maintain it for the life of the contract.

3. Proposal Submission
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6. Proposals should be submitted no later than the response date listed above. Offerors are required to submit a technical proposal that addresses their approach to completing all tasks in the SOW, along with pricing. Key submission requirements include:

  • Proof of a valid SAM.gov registration (UEI and CAGE Code).

  • A detailed technical approach for the work outlined in the SOW.

  • Proof of having a UL 2050 certified installer for the IDS. This is a mandatory requirement.

  • A preliminary project schedule.

  • A completed Quality Control Plan (QCP).

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (5)

  • Questions and Answers.pdf

    4.0 MBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • Wage Determination.pdf

    1.6 MBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Instructions to Offerors.pdf

    148 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • QASP.pdf

    149 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Renovation of Building 6_SOW_TO1 (Security Force Protection).pdf

    362 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Combined Synopsis/Solicitation for B6 Security Renovation

    Notice 602599a479c14494a231738ef5fa545e on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    Combined Synopsis/Solicitation for B6 Security Renovation

    Notice f3a78bdbff3143b2add4a229ea495d4f on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    Combined Synopsis/Solicitation for B6 Security Renovation

    Notice be8ea9e99918477cba6fcac1e5193772 on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    Combined Synopsis/Solicitation for B6 Security Renovation

    Notice 204f1ad59df649918cc4277f1c8d7604 on SAM.gov

  5. 6
    Version 6Combined Synopsis/SolicitationArchivedCurrent

    Combined Synopsis/Solicitation for B6 Security Renovation

    Notice e085629a71f7465fbe4943d161141a11 on SAM.gov

Similar Opportunities

Title
Phase
Deadline

Additional Details

Solicitation Number

H92295-26-Q-B010

Archive Date

Jul 24, 2026

Office Address

PETERSON AFB, CO, 80914