Split-Unit HVAC Replacement
Archived on October 9, 2026. Original response deadline: . Full description on SAM.gov.
Description
All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT).
A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT). Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433. An escort is required for the site visit and will be provided by the Government. Point of contact for the site visit is CPT Megan Colpo (925) 917-0784. Contact the POC for assistance with directions and notify her of arrival due to the escort requirement. Personnel that do not have access to JBLM must go through the Visitor Center at Liberty Gate to receive a visitor's pass. Requirements for the visitor's pass includes REAL ID (passport and social security card for those that do not have a REAL ID), valid driver's license, and vehicle insurance information.
Desription of Work
This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems. The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems. The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards.
The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units. Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed. The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
AC INFO_update.xlsx
45 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
HVAC Replacement RFIs_additional (002).docx
34 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Solicitation Amendment H9242126QE0470001 SF 30.pdf
1.3 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
PWS_1SFG_MICC_Split Units_Updated final.docx
40 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
HVAC Floor Plan_Split Units.pptx
633 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
HVAC Replacement RFIs_all.docx
26 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
FAR_52.212-1_Addendum_-_Instructions_to_Offerors_(1SFG_HVAC_Replacement).docx
33 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Pierce County Wage Determination.txt
43 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Solicitation - H9242126QE047 - CO Signed.pdf
2.1 MBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Split-Unit HVAC Replacement
- 2Version 2Combined Synopsis/SolicitationArchived
Split-Unit HVAC Replacement
- 3Version 3Combined Synopsis/SolicitationArchived
Split-Unit HVAC Replacement
- 4Version 4Combined Synopsis/SolicitationArchived
Split-Unit HVAC Replacement
- 6Version 6Combined Synopsis/SolicitationArchivedCurrent
Split-Unit HVAC Replacement
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
H9242126QE047
Archive Date
Oct 9, 2026
Office Address
FORT LIBERTY, NC, 28310