Notice ID: 42fa45d5db6f4e7ea2c49665dbd74858Combined Synopsis/Solicitation
Pentagon AWG Doors
Archived on October 1, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−04:00
- Posted
- September 2, 2021
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 332321: Metal Window and Door Manufacturing
- Agency
- Department of WarWASHINGTON HEADQUARTERS SERVICES (WHS)
Notice details
- Office
- WASHINGTON HEADQUARTERS SERVICES
- Place of performance
- Washington, DC, 20301-1155
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- HQ003421R0286
- Notice ID
- 42fa45d5db6f4e7ea2c49665dbd74858
Description
The Contractor shall furnish doors and assemblies hardware for eighty-two (82) doors. The 82 doors consisted of nine (9) different types. See below for a list of the type of doors (brand name or equal to): (Quantity: 22) - STC-50 Metal (Overly) (Quantity: 38) - STC -50 Wood (Krieger) (Quantity: 8) - STC-45 Metal (Overly) (Quantity: 7) - STC-45 Wood (Overly) (Quantity: 2) - Bullet Proof (Krieger) (Quantity: 1) - Storefront (Glass) (Executive Glass Services, Inc.) (Quantity: 1) - Dutch (No special manufacture) (Quantity: 3) - Stainless Steel (Krieger)
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
HQ003421R0286- Combined Synopsis
- Combined SynopsisCurrentSep 2, 2021
Pentagon AWG Doors
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Proposed procurement for NSN 5670123733726 DOOR,METAL,SWINGING: Line 0001 Qty 23 UI EA Deliver To: DLA DISTRIBUTION RED RIVER By: 0234 DAYS ADO Approved source is C6119 WMM01166. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | 63% | Combined Synopsis | 10/29/2026 |
THIS SOLICITATION AND ANY SUBSEQUENT AMENDMENTS WILL BE POSTED TO THE SAM WEBSITE: SAM.GOV ELECTRONIC SUBMISSION OF QUOTES IS AVAILABLE THROUGH THE SAM WEBSITE. To be considered for award, if the contractor (awardee) is required to implement NIST SP 800-171, the contractor (awardee) shall have a current assessment as detailed in DFARS 252.204-7019 (I.E., not more than 3 years old unless a lesser time is specified in the solicitation) **Items deemed to be Commercial Off The Shelf (COTS) are exempt from NIST SP 800-171 requirement. Must identify and provide information to contracting officer on bid during solicitation period** Please read the contract in its entirety. If you are able to provide a quote be sure to provide the following information in the sections provided below: Page 1 BLK 17a. Provide Contractor's info and cage code. Section A. A1 – 1. Enter The Contractor's POC Section B. – Enter your Quote and any other info we should know. Please quote FOB Destination BREMERTON, WA. Section B. K21 – Check the appropriate box and provide the Manufacturer’s Name, Address and the Country of Manufacturing Section F. – Provide the Lead Time and/or Delivery Date. Section K. - 52.204-24 (d)(1) and (2) Check the applicable boxes Section K. - 52.209-11 (b)(1) and (2) Check the applicable boxes Page 1 - Read box 28 and sign boxes 30 a, b, and c. Return the signed and filled out solicitation with your quote by SUNDAY, 28 SEPTEMBER 2025 7AM FOR YOUR BID TO BE DEEMED RESPONSIVE A SIGNED AND COMPLETED SOLICITATION MUST BE SUBMITTED VIA EMAIL. EMAIL: karl.lindley@dla.mil Please be advised that all communications regarding this requirement are governed by the Procurement Integrity Act. In accordance with FAR 3.104, no proprietary bid information, pricing data, or source selection-sensitive metrics may be exchanged or solicited outside of authorized contracting channels. Thank you for your cooperation in maintaining a fair and ethical procurement process." | 54% | Solicitation | 11/09/2026 |
FY27 Office Environment Glass Ballistic Partition | 53% | Combined Synopsis | 10/15/2026 |
The contractor shall provide all materials for Bonnet Carre Spillway Structure Grating as outlined in the Bidding Schedule and Material & Requirements Paragraphs. The contractor is responsible for purchasing and delivery of all materials to the Bonnet Carre Spillway's project maintenance yard (16302 River Rd., Norco, LA). | 53% | Awarded | Open |
Amendment 0001 hereby changes the width requirements in line items 0001 and 0002 from 27-5/8" to 27-1/2". Submit quotes via email to Leann Thornton; Leann.R.Thornton@usace.army.mil | 53% | Solicitation | 09/18/2026 |
Additional Details
Solicitation Number
HQ003421R0286
Archive Date
Oct 1, 2021
Office Address
WASHINGTON, DC, 203011000